RAMLEELA CITY is a RERA-registered residential project by BHAGWATI in Jhansi (RERA ID UPRERAPRJ195795). Registered with a completion deadline of 28 Feb 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ195795 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Jhansi Development Authority |
| Proposed start | 1 Apr 2020 |
| Project duration | 59 months |
| Address | Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Individual |
| Applicant address | 21, KAILASH RESIDENCY, ORCHHA GATE, JHANSI |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
MAP20191012122459230
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 5 Nov 2020 |
| Original completion | 28 Feb 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 30 May 2025 |
| Registration fee | ₹1,16,500 |
| Sanctioning authority | Jhansi Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Under process. 8 plot demarcation completed as on date |
| 2 | Boundary Wall 60 percent already completed with 7ft height including main gate. |
| 3 | Road Work 25 percent Road construction in progress for whole site. |
| 4 | Footpaths Not commenced. |
| 5 | Water Supply Including Drinking Water Facilities Not commenced. |
| 6 | Sewer System Not commenced. |
| 7 | Drain Not commenced. |
| 8 | Parks 40 percent park completed and 60 percent boundary work of park done |
| 9 | Tree Planting 40 percent complete |
| 10 | Design For Electric Supply Including Street Lighting not yet started |
| 11 | Community Buildings Not commenced. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Not commenced. |
| 13 | Solid Waste Management And Disposal System Not commenced. |
| 14 | Water Conservation System Not commenced. |
| 15 | Energy Management System Including Use of Renewable Energy Not commenced. |
| 16 | Fire Protection And Fire Safety System none since villa system |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services none |
| 18 | Emergency Evacuation Services not applicable since villa only |
| 19 | Other Miscellaneous Work Work in progress for sample villas. Commercial Property is not for sale and for own use so not included in Plan details uploaded. |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 11 Mar 2025. 1 of them carries a revalidation, valid to 17 Dec 2025.
Sanctioned by Jhansi Development Authority · 22,265 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| MAP20191012122459230 | 12 Mar 2020 | 11 Mar 2025 | 11 Mar 2028 | 28 Feb 2025 | — | |
| MAP20191012122459230 | 12 Mar 2020 | 11 Mar 2025 | 17 Dec 2028 | 28 Feb 2025 | 12 Mar 2020 valid to 17 Dec 2025 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
28 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 253,256,257,255/1,260/1 | 5020 | Khasra |
| 251, 254/1 | 4250 | Khasra |
| 250/3 | 3810 | Khasra |
| 250/2, 254/2, 255/2, 258, 259, 260/2, 278, 279 | 13280 | Khasra |
| Registry document · 2395/287-298/2413 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4087/2007 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 2019 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 2019 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · 3658/2011 The registered deed by which the promoter bought the land. | PDF ↗ |
| Allotment letter from the authority · Owner-Developer agreement with city college The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Consortium Agreement The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Explanations about the project The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Oct 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Oct 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Oct 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Oct 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Oct 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Oct 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Oct 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Oct 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 22 Oct 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Oct 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Sept 2020 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | BHAGWATI |
| Role | Promoter · current |
| RERA ID | UPRERAPRM116396 |
| PAN | APLPK0935J |
| Registered address | 21, KAILASH RESIDENCY, ORCHHA GATE, JHANSI |
| RERA contact | |
| Registered since | 2020 |
| Legal name | NEW CITY MONTESSORI SCHOOL SOCIETY |
| Role | Co-promoter |
| Applicant type | Societies |
| Address | 149/B, Shivaji Nagar Jhansi |
| RERA contact |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | RAMLEELA CITYBankPUNJAB NATIONAL BANKBranchKANPUR ROAD JHANSIA/C no.IFSCPUNB0531100 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about RAMLEELA CITY
Is RAMLEELA CITY RERA registered?
Yes. RAMLEELA CITY is registered with UPRERA under registration number UPRERAPRJ195795, registered on 5 Nov 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has RAMLEELA CITY been completed?
UPRERA still lists RAMLEELA CITY as Registered, so it is not shown as completed here. A completion certificate dated 30 May 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of RAMLEELA CITY?
BHAGWATI is the promoter entity that filed RAMLEELA CITY with UPRERA (promoter RERA ID UPRERAPRM116396). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does RAMLEELA CITY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is RAMLEELA CITY located?
RAMLEELA CITY is registered in Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗