Salasar City P2 is a RERA-registered residential project by Akhilesh Chandra Gupta Vinod Kumar Gupta in Jhansi (RERA ID UPRERAPRJ912211). Registered with a completion deadline of 25 Jun 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ912211 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Jhansi Development Authority |
| Proposed start | 1 Apr 2023 |
| Project duration | 27 months |
| Address | Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Partnership Firm |
| Applicant address | INFRONT OF ZILLA PANCHAYAT, SADAR BAZAR, JHANSI |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MAP20191118134836864
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 12 May 2023 |
| Original completion | 25 Jun 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 Nov 2025 |
| Registration fee | ₹66,000 |
| Sanctioning authority | Jhansi Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots All plots are demarcated as per the layout plan being attached. The plot would be demarcated as per the plot area above mentioned for each unit. Further,the development cost would be incurred in the proportion of the plot size and total land. |
| 2 | Boundary Wall All plots are covered by separate boundary walls of atleast 1.5 metres. The colony would be having the boundary wall at the boundary of the colony of height of atleast 2.5 meters. |
| 3 | Road Work Black top road is proposed to be laid in the colony. The road would be laid across the colony for the comfort of the residents. The road width would range from 7.5 mtr to 9 mtr as sanctioned in attached layout. |
| 4 | Footpaths Paved biock with the footpath as per approved layout being attached. Footpath would be made across the blocks for the walking residents. The footpath would be of 2 feet wide outside the units. |
| 5 | Water Supply Including Drinking Water Facilities Wather for general utility and drinking water purpose will be provided by the laid pipeline. The water supply would be provided through the overhead watertank. The water supply would be through pipeline would be laid as per the service layout having all the plumbing external development details |
| 6 | Sewer System Sewer system would be nade for the cleanliness of the colony. The sewerage plan would be made for the flow of sullage water easily through the sewer system. Proposed water treatment plant will be installed for the treatment of the sewer. |
| 7 | Drain Drain would be constructed in the blocks for thr removal of residual waste out out of the residency through sewage. The same would be constructed as per service layout approved and attached. The drain would be made under the paved pathway. The plan would be made such a way that the water at the road would be flown in the drain. |
| 8 | Parks Park area of 2059 sq.mt. will be developed as per the approved layout plan.
2 parks would be constructed within the colony.
Park would contain temple and other facilities for the kids. |
| 9 | Tree Planting 100 plants would be planted all over the residency. |
| 10 | Design For Electric Supply Including Street Lighting Electric Pole and separate electricity connection will be taken from the concerned electricity department of jhansi. The electric plan would be sanctioned from the electricity board of jhansi. |
| 11 | Community Buildings A clubhouse has been proposed in the layout. |
| 12 | Treatment and Disposal System of Sewage and Sullage water and the same would be made as per the approved plan |
| 13 | Solid Waste Management And Disposal System Solid waste will be collected regularky by the cleaning department of the cityi.e Nagar palika |
| 14 | Water Conservation System Rain wather harvesting and sewage treatment plan has been proposed as per the approved layout for developing wather conservation system as per the Govt norms. |
| 15 | Energy Management System Including Use of Renewable Energy The residents will follow the Government norms. |
| 16 | Fire Protection And Fire Safety System Government norns for the fire safety system would be followed. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per the approval layout being attached |
| 18 | Emergency Evacuation Services Asper the approval layout being attached. |
| 19 | Other Miscellaneous Work All other amenities,works and services would be performed as per the approved service layout plan being attached. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 25 Jun 2025.
Sanctioned by Jhansi Development Authority · 12,145 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MAP20191118134836864 | 26 Jun 2020 | 25 Jun 2025 | 25 Jun 2028 | 25 Jun 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 421/8, 241, 236, 238, 239, 245/2, 246, 249/2 | 12145 | Khasra |
| Registry document · 1/7899/311to348/1725 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/7802/235to280/201 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/7716/283to350/7406 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · 663281 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · EXPLANATION The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 15 Apr 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 15 Apr 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 15 Apr 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 15 Apr 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 15 Apr 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 15 Apr 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 15 Apr 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 15 Apr 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 18 Apr 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 24 Apr 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 24 Apr 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 24 Apr 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 27 Apr 2023 ↗ |
Quarterly progress reports
9 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
9 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2025-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Akhilesh Chandra Gupta Vinod Kumar Gupta |
| Role | Promoter · current |
| RERA ID | UPRERAPRM231260 |
| PAN | ABIFA6150C |
| CIN / TAN | AGRA13716D |
| Registered address | INFRONT OF ZILLA PANCHAYAT, SADAR BAZAR, JHANSI |
| RERA contact | |
| Registered since | 2023 |
| Legal name | SHRI VINOD KUMAR GUPTA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | R/O 1383, VIVEKANAND COLONY, JHANSI |
| RERA contact |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Akhilesh Chandra Gupta Vinod Kumar Gupta RERA Collection AC for Salasar City P2BankUCO BankBranchBKD BranchBranch addressBKD Branch, JhansiBranch districtJhansi, Uttar PradeshA/C no.IFSCUCBA0001950 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Akhilesh Chandra Gupta Vinod Kumar Gupta RERA Seperate AC for Salasar City P2BankUCO BankBranchBKD BranchBranch addressBKD Branch, JhansiBranch districtJhansi, Uttar PradeshA/C no.IFSCUCBA0001950 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Akhilesh Chandra Gupta Vinod Kumar Gupta RERA Transaction AC for Salasar City P2BankUCO BankBranchBKD BranchBranch addressBKD Branch, JhansiBranch districtJhansi, Uttar PradeshA/C no.IFSCUCBA0001950 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Salasar City P2
Is Salasar City P2 RERA registered?
Yes. Salasar City P2 is registered with UPRERA under registration number UPRERAPRJ912211, registered on 12 May 2023. Estanzo reproduces that filing; it does not verify the work behind it.
Has Salasar City P2 been completed?
UPRERA still lists Salasar City P2 as Registered, so it is not shown as completed here. A completion certificate dated 29 Nov 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Salasar City P2?
Akhilesh Chandra Gupta Vinod Kumar Gupta is the promoter entity that filed Salasar City P2 with UPRERA (promoter RERA ID UPRERAPRM231260). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Salasar City P2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Salasar City P2 located?
Salasar City P2 is registered in Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗