Salasar City P2

UPRERARegistered

Salasar City P2 is a RERA-registered residential project by Akhilesh Chandra Gupta Vinod Kumar Gupta in Jhansi (RERA ID UPRERAPRJ912211). Registered with a completion deadline of 25 Jun 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ912211
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryJhansi Development Authority
Proposed start1 Apr 2023
Project duration27 months
AddressJhansi, Jhansi
TehsilJhansi
Applicant typePartnership Firm
Applicant addressINFRONT OF ZILLA PANCHAYAT, SADAR BAZAR, JHANSI
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP20191118134836864

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 May 2023
Original completion25 Jun 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 Nov 2025
Registration fee₹66,000
Sanctioning authorityJhansi Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Tabrez Alam
License CA/2016/58350
Jhansi
Engineer
Sanjay Bami
Jhansi
Contractor
Prabhu Dayal
Sijwaha, Jhansi
Sr.Development work declared to RERA
1Demarcation of Plots
All plots are demarcated as per the layout plan being attached. The plot would be demarcated as per the plot area above mentioned for each unit. Further,the development cost would be incurred in the proportion of the plot size and total land.
2Boundary Wall
All plots are covered by separate boundary walls of atleast 1.5 metres. The colony would be having the boundary wall at the boundary of the colony of height of atleast 2.5 meters.
3Road Work
Black top road is proposed to be laid in the colony. The road would be laid across the colony for the comfort of the residents. The road width would range from 7.5 mtr to 9 mtr as sanctioned in attached layout.
4Footpaths
Paved biock with the footpath as per approved layout being attached. Footpath would be made across the blocks for the walking residents. The footpath would be of 2 feet wide outside the units.
5Water Supply Including Drinking Water Facilities
Wather for general utility and drinking water purpose will be provided by the laid pipeline. The water supply would be provided through the overhead watertank. The water supply would be through pipeline would be laid as per the service layout having all the plumbing external development details
6Sewer System
Sewer system would be nade for the cleanliness of the colony. The sewerage plan would be made for the flow of sullage water easily through the sewer system. Proposed water treatment plant will be installed for the treatment of the sewer.
7Drain
Drain would be constructed in the blocks for thr removal of residual waste out out of the residency through sewage. The same would be constructed as per service layout approved and attached. The drain would be made under the paved pathway. The plan would be made such a way that the water at the road would be flown in the drain.
8Parks
Park area of 2059 sq.mt. will be developed as per the approved layout plan. 2 parks would be constructed within the colony. Park would contain temple and other facilities for the kids.
9Tree Planting
100 plants would be planted all over the residency.
10Design For Electric Supply Including Street Lighting
Electric Pole and separate electricity connection will be taken from the concerned electricity department of jhansi. The electric plan would be sanctioned from the electricity board of jhansi.
11Community Buildings
A clubhouse has been proposed in the layout.
12Treatment and Disposal System of Sewage and Sullage water
and the same would be made as per the approved plan
13Solid Waste Management And Disposal System
Solid waste will be collected regularky by the cleaning department of the cityi.e Nagar palika
14Water Conservation System
Rain wather harvesting and sewage treatment plan has been proposed as per the approved layout for developing wather conservation system as per the Govt norms.
15Energy Management System Including Use of Renewable Energy
The residents will follow the Government norms.
16Fire Protection And Fire Safety System
Government norns for the fire safety system would be followed.
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per the approval layout being attached
18Emergency Evacuation Services
Asper the approval layout being attached.
19Other Miscellaneous Work
All other amenities,works and services would be performed as per the approved service layout plan being attached.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 25 Jun 2025.

Sanctioned by Jhansi Development Authority · 12,145 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP2019111813483686426 Jun 202025 Jun 202525 Jun 202825 Jun 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
421/8, 241, 236, 238, 239, 245/2, 246, 249/212145Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1/7899/311to348/1725
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/7802/235to280/201
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/7716/283to350/7406
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 663281
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · EXPLANATION
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New15 Apr 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New15 Apr 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 Apr 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 Apr 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New15 Apr 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New15 Apr 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New15 Apr 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New15 Apr 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New18 Apr 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New24 Apr 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New24 Apr 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New24 Apr 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New27 Apr 2023 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2025-Q1.

QuarterConstructionCertificates
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAkhilesh Chandra Gupta Vinod Kumar Gupta
RolePromoter · current
RERA IDUPRERAPRM231260
PANABIFA6150C
CIN / TANAGRA13716D
Registered addressINFRONT OF ZILLA PANCHAYAT, SADAR BAZAR, JHANSI
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSHRI VINOD KUMAR GUPTA
RoleCo-promoter
Applicant typeIndividual
AddressR/O 1383, VIVEKANAND COLONY, JHANSI
RERA contact

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Akhilesh Chandra Gupta Vinod Kumar Gupta RERA Collection AC for Salasar City P2BankUCO BankBranchBKD BranchBranch addressBKD Branch, JhansiBranch districtJhansi, Uttar PradeshA/C no.IFSCUCBA0001950
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Akhilesh Chandra Gupta Vinod Kumar Gupta RERA Seperate AC for Salasar City P2BankUCO BankBranchBKD BranchBranch addressBKD Branch, JhansiBranch districtJhansi, Uttar PradeshA/C no.IFSCUCBA0001950
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Akhilesh Chandra Gupta Vinod Kumar Gupta RERA Transaction AC for Salasar City P2BankUCO BankBranchBKD BranchBranch addressBKD Branch, JhansiBranch districtJhansi, Uttar PradeshA/C no.IFSCUCBA0001950
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Salasar City P2

Is Salasar City P2 RERA registered?

Yes. Salasar City P2 is registered with UPRERA under registration number UPRERAPRJ912211, registered on 12 May 2023. Estanzo reproduces that filing; it does not verify the work behind it.

Has Salasar City P2 been completed?

UPRERA still lists Salasar City P2 as Registered, so it is not shown as completed here. A completion certificate dated 29 Nov 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Salasar City P2?

Akhilesh Chandra Gupta Vinod Kumar Gupta is the promoter entity that filed Salasar City P2 with UPRERA (promoter RERA ID UPRERAPRM231260). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Salasar City P2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Salasar City P2 located?

Salasar City P2 is registered in Jhansi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗