RISHITA MANHATTAN (PHASE-I) is a RERA-registered residential project by RISHITA DEVELOPERS PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ6682). Registered with a completion deadline of 29 Jun 2024.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6682 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Nov 2016 |
| Original start | 1 Nov 2016 |
| Project duration | 92 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | Unit No. 1201, 12th Floor, Tower T-2, Crescent Heights, Sultanpur Road, Sushant Golf City, Lucknow, Lucknow, Uttar Pradesh, India, 226030 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
41815
3 building permits sanctioned
Registered with RERA
- valid to
Permit revalidated
41815
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 Aug 2017 |
| Original completion | 31 Dec 2022 |
| Revised completion | 29 Jun 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 28 Oct 2023 |
| Registration fee | ₹2,06,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK852 69%
- 2 BHK266 21%
- 4 BHK121 10%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 266 | 67-67 |
| 3 BHK | 852 | 82-113 |
| 4 BHK | 121 | 144-152 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A-1 · OTHER, 2 BHK, 3 BHK | 21 | 152 | 67-82 |
| A-2 · OTHER, 2 BHK, 3 BHK | 21 | 152 | 67-82 |
| A-3 · OTHER, 2 BHK, 3 BHK | 21 | 152 | 67-82 |
| A-4 · OTHER, 2 BHK, 3 BHK | 21 | 152 | 67-110 |
| B-1 · OTHER, 3 BHK | 24 | 90 | 100-107 |
| B-2 · OTHER, 3 BHK | 22 | 78 | 107-113 |
| B-3 · OTHER, 3 BHK | 24 | 88 | 100-107 |
| B-4 · OTHER, 3 BHK | 24 | 88 | 107-113 |
| B-5 · OTHER, 3 BHK | 22 | 78 | 107-113 |
| B-6 · OTHER, 3 BHK | 24 | 88 | 108-113 |
| C-3 · OTHER, 4 BHK | 24 | 64 | 144-152 |
| C-4 · OTHER, 4 BHK | 22 | 57 | 144-152 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots YES (DONE) |
| 2 | Boundary Wall YES (UNDER CONSTRUCTION) |
| 3 | Road Work YES |
| 4 | Footpaths YES |
| 5 | Water Supply Including Drinking Water Facilities YES (AS PER WATER SUPPLY PLAN) |
| 6 | Sewer System AVAILABLE ( AS PER SEWERAGE PLAN) |
| 7 | Drain AVAILABLE ( AS PER DRAINAGE PLAN) |
| 8 | Parks YES (AS PER LAYOUT PLAN) |
| 9 | Tree Planting YES |
| 10 | Design For Electric Supply Including Street Lighting YES |
| 11 | Community Buildings YES |
| 12 | Treatment and Disposal System of Sewage and Sullage water YES |
| 13 | Solid Waste Management And Disposal System YES (AS PER PLAN) |
| 14 | Water Conservation System YES |
| 15 | Energy Management System Including Use of Renewable Energy YES |
| 16 | Fire Protection And Fire Safety System YES |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services YES |
| 18 | Emergency Evacuation Services YES |
| 19 | Other Miscellaneous Work MAIN GATE, GUARD ROOM, JOGGING TRACK ETC. |
Registered agents
34 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ABHAY PRATAP SINGH | UPRERAAGT10207 |
| 3 | ABHISHEK KUMAR SINGH | UPRERAAGT15288 |
| 4 | AMIT KUMAR NISHAD | UPRERAAGT14016 |
| 5 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 6 | ARCHANA GUPTA | UPRERAAGT10881 |
| 7 | ASHUTOSH KUMAR SINGH | UPRERAAGT14912 |
| 8 | DAIWIK REALTORS | UPRERAAGT12075 |
| 9 | GOLDEN ESTATE | UPRERAAGT10397 |
| 10 | HITESH KHANNA | UPRERAAGT13833 |
| 11 | INVESTORS CARE INFRATECH PVT LTD | UPRERAAGT13542 |
| 12 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 13 | Karshni Buildwell Pvt Ltd | UPRERAAGT11401 |
| 14 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 15 | KONRAI OVERSEAS | UPRERAAGT14764 |
| 16 | M.S. Consultants | UPRERAAGT10079 |
| 17 | M.S. Property Consultants L.L.P. | UPRERAAGT10074 |
| 18 | PIXEL GLOBAL INFRA PRIVATE LIMITED | UPRERAAGT13936 |
| 19 | RAM KUMAR TIWARI | UPRERAAGT14400 |
| 20 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 21 | Rishabh Saxena | UPRERAAGT13851 |
| 22 | RISHTA INFRABUILD PVT LTD | UPRERAAGT15197 |
| 23 | Sachan Estate Pvt Ltd | UPRERAAGT10143 |
| 24 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 25 | SANTOSH KUMAR | UPRERAAGT10156 |
| 26 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 27 | SHRI RUDRA REAL ESTATES | UPRERAAGT14251 |
| 28 | shrikant upadhyay | UPRERAAGT15563 |
| 29 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 30 | Smart InfraReality Private Limited | UPRERAAGT10057 |
| 31 | SMITA SINGH | UPRERAAGT12566 |
| 32 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 33 | TARUN PREET SINGH SAHNI | UPRERAAGT12537 |
| 34 | VIKAS SINGH | UPRERAAGT12163 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 20 Jul 2022. 2 of them carry a revalidation, the latest valid to 20 Jul 2025.
Sanctioned by Lucknow Development Authority · 40,198 sqm of land · an approved plan of 12 blocks and 1239 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 41815 | 21 Jul 2017 | 20 Jul 2022 | 20 Jul 2025 | 31 Dec 2022 | — | |
| 41815 | 21 Jul 2017 | 20 Jul 2022 | 20 Jul 2025 | 31 Dec 2022 | 21 Jul 2017 | |
| 41815 | 21 Jul 2017 | 20 Jul 2022 | 17 Jan 2026 | 30 Jun 2023 | 18 Jan 2021 valid to 20 Jul 2025 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Jun 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2022 | 30 Jun 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2023 | 29 Jun 2024 | — |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 439 TO 442, PART OF 153,154,436,438,448;465 TO 467 | 40198 | Khasra |
5 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 15 Jun 2017.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 6810 | 15 Jun 2017 | self | — |
| 7874 | 6 Jul 2017 | self | — |
| 6809 | 15 Jun 2017 | self | — |
| 7876 | 6 Jul 2017 | self | — |
| 8686 | 25 Jul 2017 | self | — |
| Sale deed · 6810 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6809 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7874 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7876 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8686 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10105 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10107 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 Sept 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 2 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 2 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 1 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 30 Jan 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 30 Jan 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 30 Jan 2021 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 31 Jul 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 31 Jul 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 31 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Health service | ALL SERVICES SEWERAGE, DRAINAGE, WATER SUPPLY, ELECTRICAL ETC. |
| Renewable energy | YES |
| Other facilities | CLUB HOUSE |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
17 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
17 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | RISHITA DEVELOPERS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4294 |
| PAN | AAECR1191G |
| CIN / TAN | U45201UP2008PTC035945 |
| Name of chairman | SUDHIR KUMAR AGARWAL |
| Registered address | Unit No. 1201, 12th Floor, Tower T-2, Crescent Heights, Sultanpur Road, Sushant Golf City, Lucknow, Lucknow, Uttar Pradesh, India, 226030 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | RISHITA DEVELOPERS PVT. LTD RISHITA MANHATTAN PHASE-I RERABankYES BANK LTD.BranchGOMTI NAGARA/C no.IFSCYESB0000611 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about RISHITA MANHATTAN (PHASE-I)
Is RISHITA MANHATTAN (PHASE-I) RERA registered?
Yes. RISHITA MANHATTAN (PHASE-I) is registered with UPRERA under registration number UPRERAPRJ6682, registered on 4 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has RISHITA MANHATTAN (PHASE-I) been completed?
UPRERA still lists RISHITA MANHATTAN (PHASE-I) as Registered, so it is not shown as completed here. A completion certificate dated 28 Oct 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of RISHITA MANHATTAN (PHASE-I)?
RISHITA DEVELOPERS PRIVATE LIMITED is the promoter entity that filed RISHITA MANHATTAN (PHASE-I) with UPRERA (promoter RERA ID UPRERAPRM4294). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted RISHITA MANHATTAN (PHASE-I) more time to complete?
UPRERA's record carries 2 completion extensions for RISHITA MANHATTAN (PHASE-I), the latest running to 29 Jun 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does RISHITA MANHATTAN (PHASE-I) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is RISHITA MANHATTAN (PHASE-I) located?
RISHITA MANHATTAN (PHASE-I) is registered in Lucknow, as filed with UPRERA.
What configurations are available in RISHITA MANHATTAN (PHASE-I)?
The unit plan filed with UPRERA lists OTHER, 2 BHK, 3 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in RISHITA MANHATTAN (PHASE-I)?
The approved unit plan filed with UPRERA runs from 67 to 152 m² of carpet area (about 717 to 1,636 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in RISHITA MANHATTAN (PHASE-I)?
The approved unit plan describes 12 blocks and 1,239 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is RISHITA MANHATTAN (PHASE-I)?
About 125 units per acre: 1,239 planned units across 9.93 acres (40,198 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗