RUDRA AQUACASA

UPRERARegistered

RUDRA AQUACASA is a RERA-registered residential project by RUDRA BUILDWELL HOMES PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ6649). Registered with a completion deadline of 31 Dec 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
37%Q3'24
37%Q4'24
37%Q1'25
37%Q2'25
37%Q3'25
37%Q4'25
60%Q1'26
60%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6649
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Apr 2014
Original start1 Apr 2014
Project duration165 months
AddressGH-05A, Sector-16, Greater Noida West-U.P-201009, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressRegd. Office D 53, OKHLA PHASE 1, NEW DELHI CORP. OFFICE A66, SECTOR 63, NOIDA, UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Permit revalidated

    BP3092/GH/FTS/4300

  3. 2 building permits sanctioned

  4. Registered with RERA

  5. Permit revalidated (2)

  6. 4 building permits sanctioned

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  9. to

    Extension granted

  10. to

    Extension granted

  11. valid to

    Permit revalidated

    PLG/BP SM-19-JUL-2025:25614

  12. to

    Extension granted

  13. valid to

    Permit revalidated

    BP3092/GH/FTS/4300

  14. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Aug 2017
Original completion31 Dec 2020
Revised completion31 Dec 2027
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,21,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors720 · 6 · 20 (units from plan)
  • 2 BHK480 67%
  • 3 BHK240 33%
ConfigurationUnitsCarpet area
2 BHK48060-74
3 BHK24089
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T4 · 2 BHK, 3 BHK2012060-89
T5 · 2 BHK, 3 BHK2012060-89
T6 · 2 BHK, 3 BHK2012060-89
T7 · 2 BHK, 3 BHK2012060-89
T8 · 2 BHK, 3 BHK2012060-89
T9 · 2 BHK, 3 BHK2012060-89
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ASHISH BHATNAGAR
License CA/2004/34182
BUILDING NO-A2, CHATARPUR ENCLAVE PHASE-2 NEW DELHI-110068
Engineer
BMSF DESIGN CONSULTANT PVT. LTD.
S-13/25 DLF PH-111 GURGAON HARYANA-122002
Contractor
APACE BUILDERS AND CONTRACTORS PVT.LTD.
GH-02B SECTOR-1 G.N. WEST
Sr.Development work declared to RERA
1Demarcation of Plots
East-24 mt wide road ,West-60 mt wide road North- 45 mt wide road South- Plot No. Gh 05B and 05C
2Boundary Wall
As per Building bye laws in RCC/Brick Work and Grill
3Road Work
Tremix/CC/Paver
4Footpaths
Tremix/CC/Paver
5Water Supply Including Drinking Water Facilities
Water supply to be provided by GNIDA and shall be stored and pumped as per norms
6Sewer System
STP
7Drain
Rain water to be Harvested as per Norms
8Parks
As per Landscape Design and Norms
9Tree Planting
As per Landscape Design and Norms
10Design For Electric Supply Including Street Lighting
As per MEP Design and Norms
11Community Buildings
As per approved Plan
12Treatment and Disposal System of Sewage and Sullage water
STP and treated water to be used for flushing and Gardening as per Norms
13Solid Waste Management And Disposal System
As per norms OWC shall be provided
14Water Conservation System
RWH to be provided as per norms
15Energy Management System Including Use of Renewable Energy
Solar water Heating and solar energy to be used as per norms
16Fire Protection And Fire Safety System
As per norms of Fire Department
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Norms
18Emergency Evacuation Services
As per Norms
19Other Miscellaneous Work
Facilities to be provide as per norms
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shownAdded by Estanzo, not part of the RERA filing
Development managerStararena Builders LLP (Ace Group)

Permits & extensions

6 permits

An approval and the date it runs to - not proof the work matching it was done.

6 sanctioning permits are on record with UPRERA, the latest valid to 21 May 2024. 5 of them carry a revalidation, the latest valid to 28 Dec 2028.

Sanctioned by Greater Noida Authority · 19,165.85 sqm of land · an approved plan of 6 blocks and 720 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
BP3092/GH/FTS/430021 May 201420 May 201920 May 202431 Dec 2020—
BP3092/GH/FTS/430021 May 201420 May 20191 Dec 202331 Dec 202021 May 2014
BP3092/GH/FTS/430020 May 201920 May 201928 Dec 202831 Dec 202529 Dec 2025
valid to 28 Dec 2028
as PLG/BP SM-19-JUL-2025:25614
BP3092/GH/FTS/430020 May 201921 May 202429 Dec 203031 Dec 202520 May 2019
valid to 11 Jul 2026
BP3092/GH/FTS/430020 May 201921 May 202429 Dec 203031 Dec 202520 May 2019
valid to 18 Jul 2026
BP3092/GH/FTS/430020 May 201921 May 202429 Dec 203031 Dec 202516 Jul 2026
valid to 17 Jul 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 4 completion extensions for this project, the latest running to 31 Dec 2027.

#Granted fromExtended uptoNote
131 Dec 202030 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202129 Mar 2023—
329 Mar 202331 Dec 2025—
431 Dec 202531 Dec 2027—

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-05A, SECTOR 16, GREATER NOIDA43105.85Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 4/305/147-166/1271
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Dec 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New27 Sept 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New31 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Feb 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Feb 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New2 Feb 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Sept 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New13 Oct 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Oct 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Oct 2020 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Renewable energyYES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q137%CA ↗ · Arch ↗ · Eng ↗
2020-Q233%CA ↗ · Arch ↗ · Eng ↗
2020-Q333%CA ↗ · Arch ↗ · Eng ↗
2020-Q435%CA ↗ · Arch ↗ · Eng ↗
2021-Q136%CA ↗ · Arch ↗ · Eng ↗
2021-Q240%CA ↗ · Arch ↗ · Eng ↗
2021-Q350%CA ↗ · Arch ↗ · Eng ↗
2021-Q433%CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q235%CA ↗ · Arch ↗ · Eng ↗
2022-Q338%CA ↗ · Arch ↗ · Eng ↗
2022-Q437%CA ↗ · Arch ↗ · Eng ↗
2023-Q137%CA ↗ · Arch ↗ · Eng ↗
2023-Q237%CA ↗ · Arch ↗ · Eng ↗
2023-Q337%CA ↗ · Arch ↗ · Eng ↗
2023-Q437%CA ↗ · Arch ↗ · Eng ↗
2024-Q137%CA ↗ · Arch ↗ · Eng ↗
2024-Q237%CA ↗ · Arch ↗ · Eng ↗
2024-Q337%CA ↗ · Arch ↗ · Eng ↗
2024-Q437%CA ↗ · Arch ↗ · Eng ↗
2025-Q137%CA ↗ · Arch ↗ · Eng ↗
2025-Q237%CA ↗ · Arch ↗ · Eng ↗
2025-Q337%CA ↗ · Arch ↗ · Eng ↗
2025-Q460%CA ↗ · Arch ↗ · Eng ↗
2026-Q160%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRUDRA BUILDWELL HOMES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM2760
PANAAFCR6959P
CIN / TANU45201DL2012PTC231495
Name of chairmanMUKESH KHURANA
Registered addressRegd. Office D 53, OKHLA PHASE 1, NEW DELHI CORP. OFFICE A66, SECTOR 63, NOIDA, UP
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSTARARENA BUILDERS LLP
RoleCo-promoter
Applicant typeProprietorship Firm
AddressC143 ,SURYA NAGAR GHAZIABAD U.P
RERA contact

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
RBHPL COLLECTION ACCOUNT FOR RUDRA AQUACASABankHDFC Bank Ltd.BranchHDFC Bank Ltd.Branch addressPlot-1B, C-Block, Sec-63, Noida, Gautam Budh Nagar, Uttar Pradesh-201301Branch districtNoida, Uttar PradeshA/C no.IFSCHDFC0000394
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
RBHPL SEPARATE ACCOUNT FOR RUDRA AQUACASABankHDFC Bank Ltd.BranchHDFC Bank Ltd.Branch addressPlot-1B, C-Block, Sec-63, Noida, Gautam Budh Nagar, Uttar Pradesh-201301Branch districtNoida, Uttar PradeshA/C no.IFSCHDFC0000394
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
RBHPL TRANSACTION ACCOUNT FOR RUDRA AQUACASABankHDFC Bank Ltd.BranchHDFC Bank Ltd.Branch addressPlot-1B, C-Block, Sec-63, Noida, Gautam Budh Nagar, Uttar Pradesh-201301Branch districtNoida, Uttar PradeshA/C no.IFSCHDFC0000394
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)229 (Under Registration - 0 ) → 230 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)229 (Under Registration - 2 ) → 229 (Under Registration - 0 )
changed in Estanzo’s record
9 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about RUDRA AQUACASA

Is RUDRA AQUACASA RERA registered?

Yes. RUDRA AQUACASA is registered with UPRERA under registration number UPRERAPRJ6649, registered on 3 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RUDRA AQUACASA?

The completion date filed with UPRERA is 31 Dec 2027. No completion certificate is on record yet.

Who is the builder of RUDRA AQUACASA?

RUDRA BUILDWELL HOMES PRIVATE LIMITED is the promoter entity that filed RUDRA AQUACASA with UPRERA (promoter RERA ID UPRERAPRM2760). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted RUDRA AQUACASA more time to complete?

UPRERA's record carries 4 completion extensions for RUDRA AQUACASA, the latest running to 31 Dec 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does RUDRA AQUACASA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RUDRA AQUACASA located?

RUDRA AQUACASA is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in RUDRA AQUACASA?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RUDRA AQUACASA?

The approved unit plan filed with UPRERA runs from 60 to 89 m² of carpet area (about 648 to 954 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RUDRA AQUACASA?

The approved unit plan describes 6 blocks and 720 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RUDRA AQUACASA?

About 152 units per acre: 720 planned units across 4.74 acres (19,165.85 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗