SHIVALIK HOMES 2

UPRERARegistered

SHIVALIK HOMES 2 is a RERA-registered residential project by COSMOS INFRAESTATE PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ5819). Registered with a completion deadline of 31 Dec 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5819
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start11 Apr 2016
Project duration153 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address2/100 VIJAYANT KHAND, GOMTI NAGAR, LUCKNOW, U.P 226010
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    BP-3242 FTS

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Permit revalidated (2)

  6. 2 building permits sanctioned

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  9. to

    Extension granted

  10. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Mar 2021
Revised completion31 Dec 2028
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹91,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors774 · 6 · 24 (units from plan)
  • 2 BHK414 53%
  • OTHER268 35%
  • 3 BHK92 12%
ConfigurationUnitsCarpet area
3 BHK9269-86
OTHER26863-86
2 BHK41452-53
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · OTHER, 3 BHK248886
B1 · 3 BHK, OTHER2413669-79
B2 · OTHER2413663-69
C1 · OTHER, 2 BHK2414253-53
C2 · 2 BHK, OTHER2413653-53
D · 2 BHK, OTHER2413652-52
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SPACE DESIGNERS INTERNATIONAL
License CA/98/23185
B-34, SECTOR-67, NOIDA- 201301
Engineer
OPTIMUM DESIGN PVT. LTD.
B-24, SECTOR-67, NOIDA- 201301
Contractor
M/S EUPHORIA CONSTRUCTION
E-16, JAWAHAR PARK, LAXMI NAGAR, DELHI- 110092
Sr.Development work declared to RERA
1Boundary Wall
Proposal for boundary wall around the project of four side up to 2.0 m heights
2Road Work
Provision for 6.0 m wide drive way as per approved drgs
3Footpaths
Proposal for footpath area as per approved drgs
4Water Supply Including Drinking Water Facilities
Provision for water supply by over head tanks for drinking and fire water tanks in each Tower/block seperately
5Sewer System
Provision for sewer line and manholes connecting to STP OF 400 KLD as per approved drgs
6Drain
Provision for internal drains for rain water and external water collection for harvesting of water
7Parks
Proposal for green and landscape area as per approved drgs
8Tree Planting
Proposal for 136 nos of trees plantation as per approved drgs
9Design For Electric Supply Including Street Lighting
Provision of Led street lighting , dedicated transformer,including power backup as per approvals
10Community Buildings
Provision for Club for social gathering and public meeting
11Treatment and Disposal System of Sewage and Sullage water
Provision of 400 KLD STP plant dedicated to project
12Solid Waste Management And Disposal System
Provision of Garbage chute in each Blocks/towers and disposal by mechanical means, Solid Waste Management And Disposal System
13Water Conservation System
Rain water harvesting system at ground level around the projects
14Energy Management System Including Use of Renewable Energy
Energy Management System as per ECBC guidline
15Fire Protection And Fire Safety System
Provision of Sprinkler and Hydrant systems for each Block/Tower including external area
16Social Infrastructure And Other Public Amenities Including Public Health Services
Provision for club and commercial space for public amenities
17Emergency Evacuation Services
Provision for fire stairs for Emergency Evacuation Services in each Tower /block seperately
18Other Miscellaneous Work
Ampetheatre ,Swimming pool ,Green area
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1KARTIK INFRATOWN PRIVATE LIMITEDUPRERAAGT10413
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

4 permits

An approval and the date it runs to - not proof the work matching it was done.

4 sanctioning permits are on record with UPRERA, the latest valid to 16 Oct 2024. 3 of them carry a revalidation, the latest valid to 22 Apr 2029.

Sanctioned by Greater Noida Authority · 17,288 sqm of land · an approved plan of 6 blocks and 774 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
BP-3242 FTS17 Oct 201431 Dec 2021—31 Mar 2021—
BP-3242 FTS17 Oct 201416 Oct 201916 Oct 202430 Sept 202117 Oct 2014
BP-3242 FTS17 Oct 201916 Oct 202416 Oct 202930 Sept 202117 Oct 2019
valid to 22 Apr 2029
BP-3242 FTS17 Oct 201916 Oct 202416 Oct 202930 Sept 202117 Oct 2019
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 31 Dec 2028.

#Granted fromExtended uptoNote
131 Mar 202130 Sept 2021Six months extension in view of force majeure caused by covid-19 pandemic
230 Sept 202131 Dec 2028—

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-01C17288 SQM—
GH01C17288Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 30 Jan 2013.

Registry no.DateTypeArea
277030 Jan 2013self—
277030 Jan 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 2770
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New30 May 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 May 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 May 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 May 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Jun 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 May 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 May 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 May 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New2 Jun 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Renewable energyYES
Other facilitiesNO

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

3 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

3 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2025-Q4.

QuarterConstructionCertificates
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗
2025-Q418.12%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCOSMOS INFRAESTATE PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM8328
PANAACCH2031F
CIN / TANU45400UP2008PTC035383
Name of chairmanKAILASH CHAUHAN
Registered address2/100 VIJAYANT KHAND, GOMTI NAGAR, LUCKNOW, U.P 226010
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameEELEVATES INFRATECH PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressCD-4, GROUND FLOOR, PITAMPURA, Rani Bagh, North West Delhi India, 110034
RERA contact

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
EELEVATES INFRATECH PVT LTD COLL A/C FOR SH-2 UPRERAPRJ5819BankHDFC BANK LTD.BranchSECTOR-18 NOIDABranch addressG-28/29 SECTOR-18 NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001592Branch emailESCROW[at]HDFC.BANK.IN
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
EELEVATES INFRATECH PVT LTD SEPARATE A/C FOR SH-2 UPRERAPRJ5819BankHDFC BANK LTD.BranchSECTOR-18 NOIDABranch addressG-28/29 SECTOR-18 NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001592Branch emailESCROW[at]HDFC.BANK.IN
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
EELEVATES INFRATECH PVT LTD RERA TRANS A/C FOR SH-2 UPRERAPRJ5819BankHDFC BANK LTD.BranchSECTOR-18 NOIDABranch addressG-28/29 SECTOR-18 NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001592Branch emailESCROW[AT]HDFC.BANK.IN
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)213 (Under Registration - 1 ) → 213 (Under Registration - 0 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)213 (Under Registration - 2 ) → 213 (Under Registration - 1 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about SHIVALIK HOMES 2

Is SHIVALIK HOMES 2 RERA registered?

Yes. SHIVALIK HOMES 2 is registered with UPRERA under registration number UPRERAPRJ5819, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SHIVALIK HOMES 2?

The completion date filed with UPRERA is 31 Dec 2028. No completion certificate is on record yet.

Who is the builder of SHIVALIK HOMES 2?

COSMOS INFRAESTATE PVT. LTD. is the promoter entity that filed SHIVALIK HOMES 2 with UPRERA (promoter RERA ID UPRERAPRM8328). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SHIVALIK HOMES 2 more time to complete?

UPRERA's record carries 2 completion extensions for SHIVALIK HOMES 2, the latest running to 31 Dec 2028. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SHIVALIK HOMES 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SHIVALIK HOMES 2 located?

SHIVALIK HOMES 2 is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SHIVALIK HOMES 2?

The unit plan filed with UPRERA lists 3 BHK, OTHER and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SHIVALIK HOMES 2?

The approved unit plan filed with UPRERA runs from 52 to 86 m² of carpet area (about 561 to 931 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SHIVALIK HOMES 2?

The approved unit plan describes 6 blocks and 774 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SHIVALIK HOMES 2?

About 181 units per acre: 774 planned units across 4.27 acres (17,288 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗