Sai Abhishek Residency

UPRERARegistered

Sai Abhishek Residency is a RERA-registered residential project by SUKRITI HOUSING INDUSTRIES PVT.LTD in Lucknow (RERA ID UPRERAPRJ12562). Registered with a completion deadline of 31 Jan 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ12562
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Aug 2017
Project duration49 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant address3/305,Vivek Khand,Gomti Nagar,Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PATRANK 740/JILAPANCHYAT/NAKSHA NEE./2014-2015

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 Sept 2017
Original completion1 Aug 2023
Revised completion31 Jan 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,35,000
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors280 · 4 · 10 (units from plan)
  • 2 BHK240 86%
  • 3 BHK40 14%
ConfigurationUnitsCarpet area
2 BHK24085-96
3 BHK40106
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER T2 · 2 BHK, 3 BHK107085-106
TOWER T3 · 2 BHK, 3 BHK107085-106
TOWER T4 · 2 BHK, 3 BHK105085-106
TOWER 1 · 2 BHK, 3 BHK109085-106
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sudhir Pandey
License M-128732-4
4/428,Vijayant Khand,Gomti Nagar,Lucknow
Engineer
Sudhir Pandey
4/428,Vijayant Khand,Gomti Nagar,Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
DONE
2Boundary Wall
IN PROGRESS
3Road Work
YET TO START
4Footpaths
YET TO START
5Water Supply Including Drinking Water Facilities
YET TO START
6Sewer System
YET TO START
7Drain
YET TO START
8Parks
YET TO START
9Tree Planting
YET TO START
10Design For Electric Supply Including Street Lighting
YET TO START
11Community Buildings
YET TO START
12Treatment and Disposal System of Sewage and Sullage water
YET TO START
13Solid Waste Management And Disposal System
YET TO START
14Water Conservation System
YET TO START
15Energy Management System Including Use of Renewable Energy
-
16Fire Protection And Fire Safety System
YET TO START
17Social Infrastructure And Other Public Amenities Including Public Health Services
-
18Emergency Evacuation Services
-
19Other Miscellaneous Work
-
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 17 Nov 2019.

Sanctioned by Any Other Competent Authority · 25,914 sqm of land · an approved plan of 4 blocks and 280 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PATRANK 740/JILAPANCHYAT/NAKSHA NEE./2014-201518 Nov 201417 Nov 201931 Aug 202231 Aug 2021
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 Jan 2024.

#Granted fromExtended uptoNote
11 Aug 202331 Jan 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

7 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1855 and 1857KGaura—
1855 and 1857k3208Khasra
1855 and 1857k3490Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 29 Apr 2014.

Registry no.DateTypeArea
661129 Apr 2014self—
661029 Apr 2014self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4592
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4592
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Oct 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Oct 2021 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterunderground boring system , over head water tank
Fire safety (as filed with RERA)Set Back as per rules,fire extinguisher on every floor, Hosereel facility
Health serviceNo
Renewable energysolor systems
Other facilitiesno

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSUKRITI HOUSING INDUSTRIES PVT.LTD
RolePromoter · current
RERA IDUPRERAPRM10590
PANAATCS6812N
CIN / TANU45400UP2013PTC059057
Name of chairmanAishwarya Pandey
Registered address3/305,Vivek Khand,Gomti Nagar,Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SUKRITI HOUSING INDUSTRIES PVT.LTDBankCorporation BankBranchVISHESH KHANDA/C no.IFSCCORP0003178
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Sai Abhishek Residency

Is Sai Abhishek Residency RERA registered?

Yes. Sai Abhishek Residency is registered with UPRERA under registration number UPRERAPRJ12562, registered on 1 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Sai Abhishek Residency?

The completion date filed with UPRERA is 31 Jan 2024. No completion certificate is on record yet.

Who is the builder of Sai Abhishek Residency?

SUKRITI HOUSING INDUSTRIES PVT.LTD is the promoter entity that filed Sai Abhishek Residency with UPRERA (promoter RERA ID UPRERAPRM10590). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Sai Abhishek Residency more time to complete?

UPRERA's record carries 1 completion extension for Sai Abhishek Residency, the latest running to 31 Jan 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Sai Abhishek Residency have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Sai Abhishek Residency located?

Sai Abhishek Residency is registered in Lucknow, as filed with UPRERA.

What configurations are available in Sai Abhishek Residency?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Sai Abhishek Residency?

The approved unit plan filed with UPRERA runs from 85 to 106 m² of carpet area (about 917 to 1,146 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Sai Abhishek Residency?

The approved unit plan describes 4 blocks and 280 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Sai Abhishek Residency?

About 44 units per acre: 280 planned units across 6.40 acres (25,914 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗