Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Sector-4, Madhavpuram, Meerut, Meerut (RERA ID UPRERAPRJ775588). Registered with a completion deadline of 31 May 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ775588 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 May 2025 |
| Project duration | 25 months |
| Address | Sector-4, Madhavpuram Scheme No.-10, Meerut-250002, Sector-4, Madhavpuram, Meerut, Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
775
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 5 May 2025 |
| Original completion | 31 May 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 8 Jan 2026 |
| Registration fee | ₹11,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Not Applicable. |
| 2 | Boundary Wall Not Applicable. |
| 3 | Road Work 6.00 mtr. wide bitumen road is constructed in front of the plots. |
| 4 | Footpaths Not Applicable. |
| 5 | Water Supply Including Drinking Water Facilities Water supply has been provided from O.H.T. constructed in Sector-4, Madhavpuram Scheme No.-10, Meerut. 140 mm P.V.C. Line has been laid in front of 30 Nos. Residential Plots. |
| 6 | Sewer System R.C.C. Sewer Line of Dia 150 mm, 250 mm, 350 mm. 400 mm has been laid. |
| 7 | Drain C-1 Type Masonary Drain has been laid in whole Sector-4. |
| 8 | Parks 14 Nos. of Parks/Open Area has been provided in Sector-4, Madhavpura Scheme No.-10, Meerut. |
| 9 | Tree Planting Not Applicable. |
| 10 | Design For Electric Supply Including Street Lighting Single C.K.T. L.T. Line on A.C.S.R. Conductor in front of 30 Nos. Residential Plots. |
| 11 | Community Buildings Not Applicable. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage pumping station has been constructed in Sector-4, Madhavpuram Scheme No.-10, Meerut. |
| 13 | Solid Waste Management And Disposal System Not Applicable. |
| 14 | Water Conservation System Not Applicable. |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable. |
| 16 | Fire Protection And Fire Safety System Not Applicable. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable. |
| 18 | Emergency Evacuation Services Not Applicable. |
| 19 | Other Miscellaneous Work Not Applicable. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Mar 2030.
Sanctioned by U.P. Awas Evam Vikas Parishad · 1,813.34 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 775 | 18 Mar 2025 | 16 Mar 2030 | 16 Mar 2030 | 31 May 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 2713 | 1.1760 | Khasra |
| 2714 | 0.2780 | Khasra |
| 2715 | 0.1390 | Khasra |
| 2716 | 0.6200 | Khasra |
| Khatauni extract · 1423-1428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 11 Mar 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Mar 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Feb 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Feb 2025 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 4 Feb 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Feb 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 26 Mar 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 11 Mar 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Feb 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 11 Mar 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 29 Mar 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 26 Mar 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 29 Mar 2025 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP COL AC DT 30 NOS RPS 04 MY NO 10 MRTBankHDFC BankBranchGarh Road, MeerutBranch address171/1, Taru Kunj, Suryansh Plaza, Garh Road, MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911Branch emailSHEKHARD.GUPTA@HDFCBANK.COM |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP SEP AC DT 30 NOS RPS 04 MY NO 10 MRTBankHDFC BankBranchGarh Road, MeerutBranch address171/1, Taru Kunj, Suryansh Plaza, Garh Road, MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP TRA AC DT 30 NOS RPS 04 MY NO 10 MRTBankHDFC BankBranchGarh Road, MeerutBranch address171/1, Taru Kunj, Suryansh Plaza, Garh Road, MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut
Is Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut RERA registered?
Yes. Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut is registered with UPRERA under registration number UPRERAPRJ775588, registered on 5 May 2025. Estanzo reproduces that filing; it does not verify the work behind it.
Has Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut been completed?
UPRERA still lists Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut as Registered, so it is not shown as completed here. A completion certificate dated 8 Jan 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut located?
Different Type 30 Nos. Residential Plot Sector-4, Madhavpuram Scheme No.-10, Meerut is registered in Sector-4, Madhavpuram, Meerut, Meerut, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗