Shalimar Paradise Phase-1

UPRERARegistered

Shalimar Paradise Phase-1 is a RERA-registered residential project by M/s Shalimar Corp Ltd. in Barabanki (RERA ID UPRERAPRJ9777). Registered with a completion deadline of 30 Dec 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9777
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start25 Jun 2013
Original start25 Jun 2013
Project duration67 months
AddressNawabganj, Barabanki
TehsilNawabganj
Applicant typeCompany
Applicant addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    163/13, 195/15

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. valid to

    Permit revalidated

    195/15

  4. Registered with RERA

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Aug 2017
Original completion30 Dec 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 Mar 2019
Registration fee₹2,46,500
Sanctioning authorityAny Other Competent Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JSR Architecture Interioors
License CA/2010/49221
PMC- C-67, Defence colony New Delhi.
Engineer
EBI India
126-E, Pocket A3, Mayur Vihar Phase-II New Delhi-110096
Contractor
Bhumi Enterprises
B-601, Rajajipuram, Lucknow-UP
Sr.Development work declared to RERA
1Demarcation of Plots
Available
2Boundary Wall
Available
3Road Work
Available
4Footpaths
Available
5Water Supply Including Drinking Water Facilities
Available
6Sewer System
Available
7Drain
Available
8Parks
Available
9Tree Planting
Available
10Design For Electric Supply Including Street Lighting
Available
11Community Buildings
Available
12Treatment and Disposal System of Sewage and Sullage water
Available
13Solid Waste Management And Disposal System
Available
14Water Conservation System
Available
15Energy Management System Including Use of Renewable Energy
Available
16Fire Protection And Fire Safety System
Available
17Social Infrastructure And Other Public Amenities Including Public Health Services
Available
18Emergency Evacuation Services
Available
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

27 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Abhishek KumarUPRERAAGT17780
3ANAROCK Property Consultants Private LimitedUPRERAAGT10265
4ANIL KUMAR VERMAUPRERAAGT14346
5ARVIND KUMARUPRERAAGT15927
6ASA FINCAP ADVISORS LLPUPRERAAGT10926
7BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
8BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
9CHANDRA PRAKASH SAXENAUPRERAAGT11046
10CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
11Karshni Buildwell Pvt LtdUPRERAAGT11401
12MOHAMMAD RASHIDUPRERAAGT15251
13Mukesh kumar SharmaUPRERAAGT11494
14RAM KUMAR YADAVUPRERAAGT13784
15REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
16Rohit ChandaniUPRERAAGT11546
17SANJEEV KUMAR BANKAUPRERAAGT10894
18Saurabh GuptaUPRERAAGT14655
19Shashank ShuklaUPRERAAGT17091
20SHINU GUPTAUPRERAAGT18762
21SINAN REALTY LLPUPRERAAGT11785
22SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
23STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
24VINAY KUMAR SINGHUPRERAAGT11226
25VISHESH SRIVASTAVAUPRERAAGT11416
26VIVEK ARORAUPRERAAGT15945
27VIVEK VERMAUPRERAAGT18719
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 May 2018. It carries a revalidation, valid to 17 Feb 2021.

Sanctioned by Any Other Competent Authority · 48,254 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
163/13, 195/1523 May 201322 May 201817 Feb 202130 Dec 201818 Feb 2016
valid to 17 Feb 2021
as 195/15
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Village-Mohammadpur Chowki 266, 267, 268, 271, 27248254 Sqmtr.—
266, 267, 268, 271, 27248254Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

15 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 31 May 2008.

Registry no.DateTypeArea
115215 Jul 2013self—
1097 Jan 2010self—
751110 Aug 2009self—
85620 Jan 2010self—
427813 Apr 2009self—
288331 May 2008self—
500711 May 2009self—
41996 Apr 2009self—
41986 Apr 2009self—
518127 Aug 2008self—
56131 Jun 2009self—
726528 Nov 2008self—
85720 Jan 2010self—
288231 May 2008self—
751110 Aug 2009self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 109
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 109
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 857
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New26 Jun 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Jun 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Jun 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New30 Jun 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New19 Mar 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Jun 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Jun 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Jun 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New26 Jun 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old12 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAvailable
Fire safety (as filed with RERA)Available
Health serviceAvailable
Renewable energyAvailable

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Corp Ltd.
RolePromoter · current
RERA IDUPRERAPRM4092
PANAADCS9234L
CIN / TANU70100DL1988PLC390006
Name of chairmanMohd. Abdullah Masood
Registered addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Barabanki

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Shalimar Corp Ltd.BankHDFC Bank Ltd.BranchM.G. Road HazratganjA/C no.IFSCHDFC0000078
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about Shalimar Paradise Phase-1

Is Shalimar Paradise Phase-1 RERA registered?

Yes. Shalimar Paradise Phase-1 is registered with UPRERA under registration number UPRERAPRJ9777, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Shalimar Paradise Phase-1 been completed?

UPRERA still lists Shalimar Paradise Phase-1 as Registered, so it is not shown as completed here. A completion certificate dated 29 Mar 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Shalimar Paradise Phase-1?

M/s Shalimar Corp Ltd. is the promoter entity that filed Shalimar Paradise Phase-1 with UPRERA (promoter RERA ID UPRERAPRM4092). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Shalimar Paradise Phase-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Shalimar Paradise Phase-1 located?

Shalimar Paradise Phase-1 is registered in Barabanki, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗