SHALIMAR EVARA HEIGHTS

UPRERARegistered

SHALIMAR EVARA HEIGHTS is a RERA-registered residential project by M/s Shalimar Corp Ltd. in VILLAGE-KEWARI, Barabanki (RERA ID UPRERAPRJ908475). Registered with a completion deadline of 9 Feb 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ908475
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Apr 2026
Project duration35 months
AddressKHASRA NO. 557MIN,558MIN,560,561, 556,563,564 VILLAGE-KEWARI, PARGANA-DEVA, TEHSIL-NAWABGANJ, BARABANKI., VILLAGE-KEWARI, Nawabganj, Barabanki
TehsilNawabganj
Applicant typeCompany
Applicant addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    3976/Maanchitra/Zila Panchayat/2025-26

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 May 2026
Original completion9 Feb 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹39,500
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors112 · 4 · 7 (units from plan)
  • 3 BHK108 96%
  • 2 BHK4 4%
ConfigurationUnitsCarpet area
3 BHK108104
2 BHK481
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER-A1 · 3 BHK, 2 BHK72881-104
TOWER-A2 · 3 BHK, 2 BHK72881-104
TOWER-B1 · 3 BHK, 2 BHK72881-104
TOWER-B2 · 3 BHK, 2 BHK72881-104
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Shivam Srivastava
License CA/2010/50742
11th Floor , Titanium Building, Vibhuti khand Gomti Nagar, Lucknow-226010
Engineer
Vishnu Datt Sharma
Optimum Design Pvt Ltd B-24 Sector-67, Noida-201301
Contractor
Mr. Sunil Kumar (Perfect Construction)
P-17, Seemant Nagat, Kalyanpur, Lko-226022
Sr.Development work declared to RERA
1Demarcation of Plots
The total project land admeasuring 6818.0 Sq mt has been systematically demarcated into 4 residential Blocks in accordance with the sanctioned layout plan approved by the competent authority. The towers are laid out with proper survey reference points, internal road network, and service corridors. Each towers are clearly identified with a unique number and defined boundaries. Site has 12 mtr internal road and with one entry/ entry.
2Boundary Wall
2.1m high and 230 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
3Road Work
Trimix / asphalt road will be used as per design suggested by the Architect for internal road. From the main entrance gate we have road of 630 mm of different layers with 30 mm bituminous coating on top through out the project, whose wideness starts from 30 mts.
4Footpaths
All internal roads will have narrow footpath with pavers or equivalent finishes as per landscape design. Well-designed pedestrian footpaths are provided along the project’s internal roads and site periphery to ensure safe and convenient movement. The footpaths are constructed with non-slip, durable paver blocks over a compacted base, maintaining adequate width as per local development authority norms. Proper gradient and drainage are ensured to prevent waterlogging.
5Water Supply Including Drinking Water Facilities
"The potable water supply of desired quality & purity shall be ensured through pressurized distribution network connected with underground /overhead tanks. Drinking water shall be sourced from an approved municipal connection or borewell. UGT capacity for domestic water tank 60 KLD and Flushing tank 60KLD. OHT capacity for domestic 16 KLD and Flushing tank 8 KLD.
6Sewer System
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment. Proper provision of sewer lines has been provided 166 KLD STP of MMBR technology is proposed.
7Drain
Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municipal drain line.
8Parks
As per the sanctioned layout plan, adequate area within the project has been earmarked for parks and open spaces. Green parcel for landscaped gardens, including sports center ,green belts, and children’s play areas are provided for the benefit of the allottees. These open spaces form an integral part of the township development and shall be maintained in accordance with the approved plan.
9Tree Planting
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommend in the landscape in order to maintain greenery and natural view.
10Design For Electric Supply Including Street Lighting
All the workings shall confer to Bureau Of Indian Standards , Indian Electricity Rules & Indian Electricity Acts. Total Load of 1100 KVA shall be supplied from nearest sub station of competent authority. 200KVA power back up DG shall also be provided.
11Community Buildings
Common community building is proposed with facilities viz. gym, pool, indoor games etc.
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system fo all plots shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system. 166 KLD STP of MMBR technology is proposed.
13Solid Waste Management And Disposal System
Project shall have  waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal. 312 Kg solid waste management plant is proposed for township.
14Water Conservation System
A well designed rain water harvesting system/ water storage tank shall be provided for the whole complex to conserve water. 1 no. of rain water storage ponds are proposed.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.
16Fire Protection And Fire Safety System
All Fire norms shall be followed as per NBC Part 4 code and approval of fire department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Proper provision for social infra and public amenities provided. Necessary linkages with external civic infrastructure, including access to nearby educational institutions, healthcare facilities, and public transport, have been duly considered to ensure a self-sustainable and safe living environment for all residents.
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

16 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Aman ChawlaUPRERAAGT11258
2Asit Gupta C/O Dwelling HomesUPRERAAGT20902
3JITENDRA KUMAR YADAVUPRERAAGT15636
4MOHAMMAD RASHIDUPRERAAGT15251
5Mohan yadavUPRERAAGT17933
6MOHSIN KHANUPRERAAGT22544
7Mukesh kumar SharmaUPRERAAGT11494
8NEOEXCEL LLPUPRERAAGT25260
9Pulkit SethiUPRERAAGT25269
10REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
11Rohit ChandaniUPRERAAGT11546
12Saurabh GuptaUPRERAAGT14655
13Shashank ShuklaUPRERAAGT17091
14Smart InfraReality Private LimitedUPRERAAGT10057
15SUNIL SINGH CHAUHANUPRERAAGT23321
16Vivekanand ShuklaUPRERAAGT21638
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Feb 2029.

Sanctioned by Any Other Competent Authority · 6,818 sqm of land · an approved plan of 4 blocks and 112 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
3976/Maanchitra/Zila Panchayat/2025-2610 Feb 20269 Feb 20299 Feb 20319 Feb 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
556230Khasra
5575850Khasra
558Mi7380Khasra
560760Khasra
5612920Khasra
563340Khasra
564660Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 2076
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2078
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5174
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14054
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14055
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14057
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14619
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14966
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 30342
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 30343
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6514
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · Chain Deed 372 Khasra (Ankit to S M And S H Buildzone LLP)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Chain Deed 12836 Khasra 557 (Ankit to menka)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · KHASRA CHART OF SHALIMAR EVARA HEIGHTS
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · LAND CHART OF SHALIMAR EVARA HEIGHTS
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 17264
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · RA-8_CA Certificate for Borrowing_Debentures Allotment
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Debenture Trust Deed -1-200
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Debenture Trust Deed -201-452
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Certified Khatoni
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Exchange Order of GS Land
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Point wise reply to query letter
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Affidavit & Letter to Zila Panchayat
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Letter from Zila Panchayat
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Feb 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New24 Feb 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New24 Feb 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New24 Feb 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Feb 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New20 Feb 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 Feb 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Feb 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New24 Feb 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New25 Feb 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Feb 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New26 Feb 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New24 Feb 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New29 Apr 2026 ↗

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2026-Q1.

QuarterConstructionCertificates
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Corp Ltd.
RolePromoter · current
RERA IDUPRERAPRM4092
PANAADCS9234L
CIN / TANU70100DL1988PLC390006
Name of chairmanMohd. Abdullah Masood
Registered addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameIMPERIAL GREEN INFRA ESTATES PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
Address3 Quinton Road, Lalbagh, Lucknow, Uttar Pradesh, India, 226001
RERA contact

Nearby projects

Barabanki

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SHALIMAR CORP LTD- COLL AC - SHALIMAR EVARA HEIGHTSBankHDFC Bank LimitedBranchBARABANKI-UTTAR PRADESHBranch addressPaiser Plaza, Ground Floor, N.H-28, Lucknow Faizabad Road, Barabanki - 225001Branch districtBarabanki, Uttar PradeshA/C no.IFSCHDFC0000658Branch emailashish.kesherwani@hdfc.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SHALIMAR CORP LTD- SEP AC - SHALIMAR EVARA HEIGHTSBankHDFC Bank LimitedBranchBARABANKI-UTTAR PRADESHBranch addressPaiser Plaza, Ground Floor, N.H-28, Lucknow Faizabad Road, Barabanki - 225001Branch districtBarabanki, Uttar PradeshA/C no.IFSCHDFC0000658
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SHALIMAR CORP LTD- TRANS A/C-SHALIMAR EVARA HEIGHTSBankHDFC Bank LimitedBranchBARABANKI-UTTAR PRADESHBranch addressPaiser Plaza, Ground Floor, N.H-28, Lucknow Faizabad Road, Barabanki - 225001Branch districtBarabanki, Uttar PradeshA/C no.IFSCHDFC0000658
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SHALIMAR EVARA HEIGHTS

Is SHALIMAR EVARA HEIGHTS RERA registered?

Yes. SHALIMAR EVARA HEIGHTS is registered with UPRERA under registration number UPRERAPRJ908475, registered on 23 May 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SHALIMAR EVARA HEIGHTS?

The completion date filed with UPRERA is 9 Feb 2029. No completion certificate is on record yet.

Who is the builder of SHALIMAR EVARA HEIGHTS?

M/s Shalimar Corp Ltd. is the promoter entity that filed SHALIMAR EVARA HEIGHTS with UPRERA (promoter RERA ID UPRERAPRM4092). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SHALIMAR EVARA HEIGHTS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SHALIMAR EVARA HEIGHTS located?

SHALIMAR EVARA HEIGHTS is registered in VILLAGE-KEWARI, Barabanki, as filed with UPRERA.

What configurations are available in SHALIMAR EVARA HEIGHTS?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SHALIMAR EVARA HEIGHTS?

The approved unit plan filed with UPRERA runs from 81 to 104 m² of carpet area (about 876 to 1,116 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SHALIMAR EVARA HEIGHTS?

The approved unit plan describes 4 blocks and 112 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SHALIMAR EVARA HEIGHTS?

About 66 units per acre: 112 planned units across 1.68 acres (6,818 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗