Anand Dham Society is a RERA-registered residential project by ANAND DHAM DEVELOPERS in Barabanki (RERA ID UPRERAPRJ711584). Registered with a completion deadline of 30 Sept 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ711584 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 1 Mar 2020 |
| Project duration | 7 months |
| Address | Nawabganj, Barabanki |
| Tehsil | Nawabganj |
| Applicant type | Partnership Firm |
| Applicant address | C-1208, Indira Nagar, Lucknow. 226016 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1211
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Aug 2020 |
| Original completion | 30 Sept 2020 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 14 Sept 2020 |
| Registration fee | ₹1,58,500 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots It is demarcated through a temporary wall that is already completed. |
| 2 | Boundary Wall 10_ height boundary Brick wall with .3_ deep eccentric foundation
9" Column/Beam with 10 mm TMT reinf. & M-25 concrete .
Finish with 2 Coat of white distemper from the inner side |
| 3 | Road Work Soil filling avg. 4_-6_i in4 Layer with compaction
6" WBM filling well compacted with vibrating road roller
Sand4-20 mm Aggregate for Void filling well compacted & cured to fill the void.
8 mm TMT @ 10" c/c distance at both ways,
final Layer of M-25 Concrete 150 mm the Finished with sticks broom |
| 4 | Footpaths 4" WBM filling well compacted with a vibrating roller
Sand + 20 mm aggregate void filling well compacted & cured to fill the void
Top Layer finished with 60 mm th. rubberized interlocking tile (size 200 X 100 mm) Grade M-30 in black & grey color pattern |
| 5 | Water Supply Including Drinking Water Facilities It will be done by the allottees themselves at their own cost |
| 6 | Sewer System RCC Sewer Line (3001250/200 & 150 mm dia) Placed on RCC Shaddel & Soil Filled with curing/compaction at a slope of 1:200 towards STP
600 to 1400 Deep Brick Work Manhole 900 dia at base & 600 dia at top, RCC Base of manhole 150mm Th., Internal & Outer side of manhole finished with 12 mm Plaster (ratio 1:4)
Brick Work Collection Pit of Size ( 5250 x 4800 X 3500rrim i.e. 105 Cu.,Mt.) with a soak pit size (2600 x 1600rnm). |
| 7 | Drain 9" brick work at both side of drain
Drain base is of Concrete 100mm th. (with 10 mm TMT)
Base/Inner side & top of drain finished with 12 mm Plaster (Ratio 1:4) |
| 8 | Parks 9" & 4.5" Designer boundry wall with MS Designer grill finished with paint
M.S. Pergola in Two Parks
Royal Palm, Alba, Pine & Tapori P[ants with shurubs at corners and Center
RCC Benches & M.5 Swings/Sea-Saw/Marry go round etc.
M S tali fencing at pond surrounding |
| 9 | Tree Planting 300 trees are to be planted in parks and in front of the plots |
| 10 | Design For Electric Supply Including Street Lighting 6 rntr & 9 rntr Long M S Pole (54 Nos.) installed to distribute electricity. 9 mtr long (27 nos. Pole) Poles installed at road for main 11 Icy power cable to reach at
3 Nos. Trnasformers (11000V/400 Kva) Installed at site. (R.S. Industrial make)
54 Nos. LED Lights (90 watt) at Site & 14 nos. at Approaching road Installed (Make- Everyday) |
| 11 | Community Buildings Not Available |
| 12 | Treatment and Disposal System of Sewage and Sullage water RCC Sewer Line (3001250/200 & 150 mm dia) Placed on RCC Shaddel & Soil Filled with curing/compaction at a slope of 1:200 towards STP
600 to 1400 Deep Brick Work Manhole 900 dia at base & 600 dia at top, RCC Base of manhole 150mm Th., Internal & Outer side of manhole finished with 12 mm Plaster (ratio 1:4)
Brick Work Collection Pit of Size ( 5250 x 4800 X 3500rrim i.e. 105 Cu.,Mt.) with an soak pit size (2600 x 1600rnm). |
| 13 | Solid Waste Management And Disposal System Not Available |
| 14 | Water Conservation System 230 mm wide drain connected with De-shilting Chamber
De-Shilting chamber (Size 2700 X 2600 mm) made up of 9" th. Brick work, Finished Both Side with 12 mm th, Plasteri connected with RWH Pit
Rain Water Harvesting (Size 8400 X 2400 mm) 9" th. Brick work, Finished Both Side with 12 mm th. Plaster, Have 150 mm dia Bore to transffer water in Ground, Bore Pipe surronded with 2 Layer of gravels & 1 Layer of Coarse Sand to filter water |
| 15 | Energy Management System Including Use of Renewable Energy Not Available |
| 16 | Fire Protection And Fire Safety System Not Available |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Available |
| 18 | Emergency Evacuation Services Not Available |
| 19 | Other Miscellaneous Work Not Available |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 10 Nov 2024.
Sanctioned by Any Other Competent Authority · 30,670 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1211 | 11 Nov 2019 | 10 Nov 2024 | 10 Nov 2027 | 30 Sept 2020 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 678, 679, 680, 683, 684, 686, 687, 688, 690, 691, 692, 693, 705, 706, 707, 709, 710 | 30670 | Khasra |
| Khatauni extract · 1423-1428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 4/596/63-78/313 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 22 Jul 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 22 Jul 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Jul 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 22 Jul 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 23 Mar 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 22 Jul 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 Mar 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 Mar 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 22 Jul 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 30 Jul 2020 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ANAND DHAM DEVELOPERS |
| Role | Promoter · current |
| RERA ID | UPRERAPRM113493 |
| PAN | ABRFA1494Q |
| CIN / TAN | LKNA13946C |
| Registered address | C-1208, Indira Nagar, Lucknow. 226016 |
| RERA contact | |
| Registered since | 2020 |
Nearby projects
Barabanki
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Anand Dham DevelopersBankBANK OF INDIABranchINDIRA NAGARA/C no.IFSCBKID0006852 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Anand Dham Society
Is Anand Dham Society RERA registered?
Yes. Anand Dham Society is registered with UPRERA under registration number UPRERAPRJ711584, registered on 10 Aug 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has Anand Dham Society been completed?
UPRERA still lists Anand Dham Society as Registered, so it is not shown as completed here. A completion certificate dated 14 Sept 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Anand Dham Society?
ANAND DHAM DEVELOPERS is the promoter entity that filed Anand Dham Society with UPRERA (promoter RERA ID UPRERAPRM113493). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Anand Dham Society have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Anand Dham Society located?
Anand Dham Society is registered in Barabanki, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗