Sheres Shalimar Mannat Phase-1

UPRERARegistered

Sheres Shalimar Mannat Phase-1 is a RERA-registered residential project by M/s Shalimar Corp Ltd. in Barabanki (RERA ID UPRERAPRJ8345). Registered with a completion deadline of 29 Sept 2020.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ8345
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Nov 2015
Original start1 Nov 2015
Project duration59 months
AddressNawabganj, Barabanki
TehsilNawabganj
Applicant typeCompany
Applicant addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    110/15

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Aug 2017
Original completion30 Sept 2019
Revised completion29 Sept 2020
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary24 Feb 2020
Registration fee₹2,19,500
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors720 · 9 · 12 (units from plan)
  • 3 BHK528 73%
  • 2 BHK192 27%
ConfigurationUnitsCarpet area
2 BHK19258
3 BHK52885
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 2 BHK, OTHER109658
B · 3 BHK, OTHER109685
C · 3 BHK, OTHER107285
D · 3 BHK, OTHER107285
E · 3 BHK, OTHER107285
F · OTHER, 3 BHK107285
G · OTHER, 3 BHK107285
H · OTHER, 3 BHK107285
J · 2 BHK119658
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JSR Architecture Interioors
License CA/2010/49221
PMC-C-67, Defence colony new delhi
Engineer
Paresh and associate
20, central lane babar road new delhi
Contractor
S.R. Construction
M-01-02, Park road Kasmanda regent appartment, hazratganj, lucknow.
Sr.Development work declared to RERA
1Demarcation of Plots
Available
2Boundary Wall
Available
3Road Work
Available
4Footpaths
Available
5Water Supply Including Drinking Water Facilities
Available
6Sewer System
Available
7Drain
Available
8Parks
Available
9Tree Planting
Available
10Design For Electric Supply Including Street Lighting
Available
11Community Buildings
Available
12Treatment and Disposal System of Sewage and Sullage water
Available
13Solid Waste Management And Disposal System
Available
14Water Conservation System
Available
15Energy Management System Including Use of Renewable Energy
Available
16Fire Protection And Fire Safety System
Available
17Social Infrastructure And Other Public Amenities Including Public Health Services
Available
18Emergency Evacuation Services
Available
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

26 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Abhishek KumarUPRERAAGT17780
3ANIL KUMAR VERMAUPRERAAGT14346
4ARVIND KUMARUPRERAAGT15927
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
7BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
8CHANDRA PRAKASH SAXENAUPRERAAGT11046
9CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
10Karshni Buildwell Pvt LtdUPRERAAGT11401
11kumar vishal singhUPRERAAGT13728
12Mukesh kumar SharmaUPRERAAGT11494
13RAM KUMAR YADAVUPRERAAGT13784
14REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
15Rohit ChandaniUPRERAAGT11546
16SANJEEV KUMAR BANKAUPRERAAGT10894
17Saurabh GuptaUPRERAAGT14655
18Shashank ShuklaUPRERAAGT17091
19SHINU GUPTAUPRERAAGT18762
20SINAN REALTY LLPUPRERAAGT11785
21SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
22STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
23VINAY KUMAR SINGHUPRERAAGT11226
24VISHESH SRIVASTAVAUPRERAAGT11416
25VIVEK ARORAUPRERAAGT15945
26VIVEK VERMAUPRERAAGT18719
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Oct 2020.

Sanctioned by Any Other Competent Authority · 42,861 sqm of land · an approved plan of 9 blocks and 720 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
110/1527 Oct 201526 Oct 202026 Oct 202029 Sept 2020
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Sept 2020.

#Granted fromExtended uptoNote
130 Sept 201929 Sept 2020—

Land & documents

28 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
52, 53, 54A&B, 55, 59, 105P, 110P, 111P, 113 to 1142861 Sqmtr.—
52, 53, 54A&B, 55, 59, 105P, 110P, 111P, 113 to 1142861Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 2 Sept 2015.

Registry no.DateTypeArea
164252 Sept 2015self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 16425
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New26 Jun 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New26 Jun 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Jun 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New30 Jun 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Jun 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Jun 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Jun 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New26 Jun 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old4 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old23 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old23 Feb 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old26 Feb 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old26 Feb 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old28 Feb 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterIn Progress
Fire safety (as filed with RERA)In Progress
Health serviceIn Progress
Renewable energyIn Progress

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Corp Ltd.
RolePromoter · current
RERA IDUPRERAPRM4092
PANAADCS9234L
CIN / TANU70100DL1988PLC390006
Name of chairmanMohd. Abdullah Masood
Registered addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Barabanki

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Shalimar Corp LtdBankDCB Bank LimitedBranchGomti Nagar LucknowA/C no.IFSCDCBL0000108
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Sheres Shalimar Mannat Phase-1

Is Sheres Shalimar Mannat Phase-1 RERA registered?

Yes. Sheres Shalimar Mannat Phase-1 is registered with UPRERA under registration number UPRERAPRJ8345, registered on 8 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Sheres Shalimar Mannat Phase-1 been completed?

UPRERA still lists Sheres Shalimar Mannat Phase-1 as Registered, so it is not shown as completed here. A completion certificate dated 24 Feb 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Sheres Shalimar Mannat Phase-1?

M/s Shalimar Corp Ltd. is the promoter entity that filed Sheres Shalimar Mannat Phase-1 with UPRERA (promoter RERA ID UPRERAPRM4092). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Sheres Shalimar Mannat Phase-1 more time to complete?

UPRERA's record carries 1 completion extension for Sheres Shalimar Mannat Phase-1, the latest running to 29 Sept 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Sheres Shalimar Mannat Phase-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Sheres Shalimar Mannat Phase-1 located?

Sheres Shalimar Mannat Phase-1 is registered in Barabanki, as filed with UPRERA.

What configurations are available in Sheres Shalimar Mannat Phase-1?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Sheres Shalimar Mannat Phase-1?

The approved unit plan filed with UPRERA runs from 58 to 85 m² of carpet area (about 627 to 918 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Sheres Shalimar Mannat Phase-1?

The approved unit plan describes 9 blocks and 720 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Sheres Shalimar Mannat Phase-1?

About 68 units per acre: 720 planned units across 10.59 acres (42,861 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗