SIGMA GALLERIA is a RERA-registered commercial project by GREEN PROJECTS LLP in SIGMA-II, Gautam Budh Nagar (RERA ID UPRERAPRJ720976). Registered with a completion deadline of 31 Dec 2029. Data as reported by UP-RERA. as reported by UPRERA
RERA status as reported: Registered.Basic details
Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ720976 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Jul 2026 |
| Project duration | 42 |
| Address | PLOT NO. LS-01, SECTOR-SIGMA-II, GREATER NOIDA, DISTT. GAUTAM BUDDHA NAGAR, U.P., SIGMA-II, Dadri, Gautam Budh Nagar |
| Tehsil | Dadri |
| Coordinates | 28.454394, 77.556133 |
| Applicant type | Limited Liability Partnership (LLP) |
| Applicant address | H-025, SITE-IV, UPSIDA, KASNA IND AREA, GRETER NOIDA, KNOWLEDGE PARK-1, KASNA, GAUTAM BUDH NAGAR-201310 UTTAR PRADESH. |
| Applicant contact | 9811678100 · greenprojects122@gmail.com |
Registration & timeline
Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.
| RERA registered | 11 Aug 2026 |
| Promised completion | 31 Dec 2029 |
| Revised completion | — none granted |
| Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹30,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.
- STUDIO82 56%
- SHOP64 44%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 64 | 6-20 |
| STUDIO | 82 | 15-26 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| SIGMA GALLERIA · OTHER, SHOP, STUDIO | 8 | 146 | 6-26 |
Project team & development works
The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots THE PLOT NO. LS-01, SIGMA GALLERIA, SECTOR-SIGMA-II, GREATER NOIDA, UTTAR PRADESH HAS BEEN DEMARCATED BY GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY. TOTAL AREA 1902.50 SQ. MTRS.. PROJECT LOCATED AT 80 METER WIDE ROAD. |
| 2 | Boundary Wall A BOUNDRY WALL OF RCC/BRICKWORK OF THICKNESS 115/150/230 MM AND HT OF 900/1500/1800 MM WITH PLASTER AND RAILING WILL BE PREPARED. IT WILL BE AS PER DESIGN AND ENTRANCE GATE ON 80 METER WIDE ROAD SIDE. |
| 3 | Road Work ACCESS DRIVEWAY TO ALL THE ENTRANCES WILL BE PROVIDED AND DRIVEWAY OF PAVERS M30 GRADE WITH THICKNESS OF 65 MM AND 100 MM KERB STONE ON SIDES SHALL BE PROVIDED IF REQUIRED. THERE SHALL BE PATTERNS, WHENEVER REQUIRED, AS PER LANDSCAPE DESIGN. EXTERNAL ROAD 80 METER ROAD AND INTERNAL PATHWAY 3 METER, 3.5 METER AND 6 METER WIDE. |
| 4 | Footpaths FOOTPATH WILL BE PROVIDED USING 40-50 MM THK PAVER WHEREVER REQUIRED. EXTERNAL ROAD 80 METER WIDE ROAD AND INTERNAL PATHWAY 3 METER, 3.5 METER AND 6 METER WIDE. |
| 5 | Water Supply Including Drinking Water Facilities GNIDA AUTHORITY SHALL SUPPLY WATER FOR THE ENTIRE PROJECT AND IT SHALL BE COLLECTED IN UNDERGROUND WATER TANK OF 15 KL 1 NOS., RAW WATER TANK 15 KL 1 NOS. DEMESTIC WATER TANKS AND WATER WITH 50/65 MM DIA PIPES TO OVERHEAD TANK AT RESPECTIVE LOCATIONS. |
| 6 | Sewer System STP OF 35 KLD WILL BE CONSTRUCTED USING RCC AND REQUIRED PUMP ROOM. STP TREATED WATER WILL BE USED IN FLUSHING. |
| 7 | Drain STORM WATER DRAINAGE WILL BE CONSTRUCTED USING 250/300/400 MM DIA PIPES AS PER DRAWING. |
| 8 | Parks LANDSCAPE WITH CIVIL WORK MANSONRY WITH 115/230 MM AND STONE, PAVERS GRASS AND VARIOUS TYPES OF PLANTATION SHRUBS. TOTAL GREEN AREA 287.45 SQ. MTRS. PROPOSED ON PLAN. |
| 9 | Tree Planting TREE PLANTATION WILL BE AS PER SANCTIONED PLAN IN WHICH 50 PERCENT TREES WILL BE EVERGREEN TREES. REQUIREMENT OF TREE AS PER SANCTION PLAN IS 11 TREE BUT WE ARE PROPOSED 20 TREE ON SANTION PLAN. |
| 10 | Design For Electric Supply Including Street Lighting INCOMING HT ELECTRICAL SUPPLY WILL BE PROVIDED BY UPPCL/NPCL VIA 1 NOS. 500 KVA DISTRIBUTION TRANSFORMER , SUBSTATION , LT PENAL AND DG SETS OF 2 NOS. 320 KVA ARE PLANNED AS PER NORMS. |
| 11 | Community Buildings NOT APPLICABLE |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP OF CAPACITY 35 KL WILL BE INSTALLED AS PER DRAWING. ALL SEWERAGE WILL BE TREATED AND WASTE WATER WILL BE USED FOR LANDSCAPPING GREEN, COOLING TOWERS AND FLUSHING SYSTEM. |
| 13 | Solid Waste Management And Disposal System ORGANIC WASTE COMPOSTER SHALL BE INSTALLED AND STP IS PROPOSED AT SITE FOR REQUIRED CAPACITY. |
| 14 | Water Conservation System 1 PITS OF RAIN WATER WILL BE INSTALLED AT THE SITE FOR RAIN WATER HARVESTING SYSTEM. |
| 15 | Energy Management System Including Use of Renewable Energy SOLAR SYSTEM SHALL BE PROVIDED AS PER REQUIREMENT. SOLAR PENAL WILL BE INSTALLED AT THE ROOF OF THE PROJECT FOR SOLAR POWER GENERATION AND SOLAR STREET LIGHT WILL BE INSTTALLED AT THE SITE. |
| 16 | Fire Protection And Fire Safety System IN COMPLIANCE TO NATIONAL BUILDING CODE OF INDIA 2016 PART IV REQUIREMENT, FIRE PROPTECTION AND SAFETY SYSTEM PROVIED WHICH CONSISTS OF UNDERGROUNF FIRETANK 1-100 KL. UNDERGROUND FIRE TANK 2-100 KL, FIRE OVERHEAD WATER TANK 20KL, MAIN ELCTRIC FIRE HYDRANT AND SPRINKLER PUMPS PROVIDED OF 2850 LPM EACH, 2 NOS. JOCKEY PUMPS OF 180 LPM EACH, 1 NOS. DIESEL ENGINE FIRE PUMPS OF 2850 LPM. ALL PROJECT SPRINKLERS SYSTEM PROVIDED IN COMPLIANCE OF IS CODES AND PROJECT FIRE SAFETY REQUIREMENTS. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services PUBLIC TOILETS AND DRIVER TOILETS |
| 18 | Emergency Evacuation Services ENERGY EVACUATION SYSTEM (SATIRCASE, EXIT WAYS ETC.) PLANNED IN COMPLIANCE TO NATIONAL BUILDING CODE OF INDIA 2016 PART IV, REFUGE AREAS ALSO PROVIDED IN COMPLIANCE TO NBC 2016. |
| 19 | Other Miscellaneous Work ALL MISCELLANEOUS WORK WILL BE COMPLETED BEFORE THE COMPLETION OF PROJECT. |
Permits & extensions
1 permit
A permit shows an approval and the date it runs to, not that work matching it has been done.
1 sanctioning permit is on record with UPRERA, valid to 26 Jun 2031.
Sanctioned by Greater Noida Authority · 1,903 sqm of land · an approved plan of 1 block and 146 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| PLG/BP/SM-14-MAY-2026;28254 | 27 Jun 2026 | 26 Jun 2031 | 26 Jun 2036 | 31 Dec 2029 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
15 filings
What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| LS-01, SECTOR-SIGMA-II, GREATER NOIDA, DISTT. GAUTAM BUDHA NAGAR, UTTAR PRADESH | 1902.50 | Plot |
| Allotment letter from the authority · POSSESSION CERTICATE NO. GNIDA/COM/2026/04 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Lease deed · REGISTRATION NO. 2757, DATED 24/01/2026 AT BAHI NO. 1, JILD NO. 48482, PAGES 17 TO 62 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Registry document · Promoter Affidavit Declaring that No Agent has appointed by the Promoter at the time of Registration The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Clarification Regarding balance of Rs.2 Lakh in Transaction Account The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Affidavit Regarding Escrow Account The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Affidavit for clarification of 1st installment payment along with payment statement and challanst The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Reply to letter dated 23.07.2026 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 4 Jul 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Jul 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 4 Jul 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Jul 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 27 Jul 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 27 Jul 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 30 Jul 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 27 Jul 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 4 Jul 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 6 Jul 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 4 Jul 2026 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.
| Legal name | GREEN PROJECTS LLP |
| Role | primary · current |
| RERA ID | UPRERAPRM467543 |
| PAN | ABDFG3915G |
| CIN / TAN | MRTG16580E |
| Registered address | H-025, SITE-IV, UPSIDA, KASNA IND AREA, GRETER NOIDA, KNOWLEDGE PARK-1, KASNA, GAUTAM BUDH NAGAR-201310 UTTAR PRADESH. |
| RERA contact | greenprojects122@gmail.com · 9811678100 |
| Registered since | 2026 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | GREEN PROJECTS LLP RERA COLLECTION A/C FOR SIGMA GALLERIABankIDFC FIRST BANK LIMITEDBranchSECTOR-ALPHA-1, GREATER NOIDABranch addressGROUND FLOOR, G-05, G-06, G-07, FIRST FLOOR F-07, F-08, F-09, PLOT C-1, BLOCK-E, KRISHNA ALPHA PLAZA, COMMERCIAL BELT-1, SECTOR ALPHA-1, GREATER NOIDA, GAUTAM BUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.10287293460IFSCIDFB0020154Branch emailupendra.singh@idfcfirstbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | GREEN PROJECTS LLP RERA SEPARATE BANK A/C FOR SIGMA GALLERIABankIDFC FIRST BANK LIMITEDBranchSECTOR-ALPHA-1, GREATER NOIDABranch addressGROUND FLOOR, G-05, G-06, G-07, FIRST FLORR-F-07, F-08, F-09, PLOT C-1, BLOCK-E, KRISHNA ALPHA PLAZA, COMMERCIAL BELT-1, SECTOR-ALPHA-1, GREATER NOIDA, GAUTAM BUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.10287293459IFSCIDFB0020154 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | GREEN PROJECTS LLP RERA TRANS BANK A/C FOR SIGMA GALLERIABankIDFC FIRST BANK LIMITEDBranchSECTOR-ALPHA-1, GREATER NOIDABranch addressGROUND FLORR G-05, G-06, G-07, FIRST FLOOR-F-07, F-08, F-09, PLOT C-1, BLOCK-E, KRISHNA ALPHA PLAZA, COMMERCIAL BELT-1, SECTOR ALPHA-1, GREATER NOIDA, GAUTAM BUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.10287293471IFSCIDFB0020154 |
What has changed on this record
nothing recorded yet
A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about SIGMA GALLERIA
Is SIGMA GALLERIA RERA registered?
Yes. SIGMA GALLERIA is registered with UPRERA under registration number UPRERAPRJ720976, registered on 11 Aug 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SIGMA GALLERIA?
The completion date filed with UPRERA is 31 Dec 2029. No completion certificate is on record yet.
Who is the builder of SIGMA GALLERIA?
GREEN PROJECTS LLP is the promoter entity that filed SIGMA GALLERIA with UPRERA (promoter RERA ID UPRERAPRM467543). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SIGMA GALLERIA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SIGMA GALLERIA located?
SIGMA GALLERIA is registered in SIGMA-II, Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in SIGMA GALLERIA?
The unit plan filed with UPRERA lists OTHER, SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SIGMA GALLERIA?
The approved unit plan filed with UPRERA runs from 6 to 26 m² of carpet area (about 60 to 275 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SIGMA GALLERIA?
The approved unit plan describes 1 block and 146 units of which 82 are homes and 64 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SIGMA GALLERIA?
About 310 units per acre: 146 planned units across 0.47 acres (1,903 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 16 Aug 2026. official source ↗