SIGMA GALLERIA

UPRERARegistered

SIGMA GALLERIA is a RERA-registered commercial project by GREEN PROJECTS LLP in SIGMA-II, Gautam Budh Nagar (RERA ID UPRERAPRJ720976). Registered with a completion deadline of 31 Dec 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ720976
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Jul 2026
Project duration42 months
AddressPLOT NO. LS-01, SECTOR-SIGMA-II, GREATER NOIDA, DISTT. GAUTAM BUDDHA NAGAR, U.P., SIGMA-II, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeLimited Liability Partnership (LLP)
Applicant addressH-025, SITE-IV, UPSIDA, KASNA IND AREA, GRETER NOIDA, KNOWLEDGE PARK-1, KASNA, GAUTAM BUDH NAGAR-201310 UTTAR PRADESH.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP/SM-14-MAY-2026;28254

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Aug 2026
Original completion31 Dec 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹30,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors146 · 1 · 8 (units from plan)
Homes · commercial units82 · 64 (shops and offices filed in the same plan)
  • STUDIO82 56%
  • SHOP64 44%
ConfigurationUnitsCarpet area
SHOP646-20
STUDIO8215-26
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SIGMA GALLERIA · OTHER, SHOP, STUDIO81466-26
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MR. GIAN PRAKASH MATHUR OF GPM ARCHITECTS AND PLANNERS PVT. LTD.
License COA/1980/05769
C-28, EAST OF KAILASH, NEW DELHI-110065
Engineer
RAVI SHANKAR SHARMA
A203, JM FLORENCE, GREATER NOIDA WEST, UTTAR PRADESH
Contractor
M.R. CONSTRUCTIONS
OFFICE NUMBER 9131, 9TH FLOOR, GOUR CITY MALL, GREATER NOIDA WEST, UTTAR PRADESH
Sr.Development work declared to RERA
1Demarcation of Plots
THE PLOT NO. LS-01, SIGMA GALLERIA, SECTOR-SIGMA-II, GREATER NOIDA, UTTAR PRADESH HAS BEEN DEMARCATED BY GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY. TOTAL AREA 1902.50 SQ. MTRS.. PROJECT LOCATED AT 80 METER WIDE ROAD.
2Boundary Wall
A BOUNDRY WALL OF RCC/BRICKWORK OF THICKNESS 115/150/230 MM AND HT OF 900/1500/1800 MM WITH PLASTER AND RAILING WILL BE PREPARED. IT WILL BE AS PER DESIGN AND ENTRANCE GATE ON 80 METER WIDE ROAD SIDE.
3Road Work
ACCESS DRIVEWAY TO ALL THE ENTRANCES WILL BE PROVIDED AND DRIVEWAY OF PAVERS M30 GRADE WITH THICKNESS OF 65 MM AND 100 MM KERB STONE ON SIDES SHALL BE PROVIDED IF REQUIRED. THERE SHALL BE PATTERNS, WHENEVER REQUIRED, AS PER LANDSCAPE DESIGN. EXTERNAL ROAD 80 METER ROAD AND INTERNAL PATHWAY 3 METER, 3.5 METER AND 6 METER WIDE.
4Footpaths
FOOTPATH WILL BE PROVIDED USING 40-50 MM THK PAVER WHEREVER REQUIRED. EXTERNAL ROAD 80 METER WIDE ROAD AND INTERNAL PATHWAY 3 METER, 3.5 METER AND 6 METER WIDE.
5Water Supply Including Drinking Water Facilities
GNIDA AUTHORITY SHALL SUPPLY WATER FOR THE ENTIRE PROJECT AND IT SHALL BE COLLECTED IN UNDERGROUND WATER TANK OF 15 KL 1 NOS., RAW WATER TANK 15 KL 1 NOS. DEMESTIC WATER TANKS AND WATER WITH 50/65 MM DIA PIPES TO OVERHEAD TANK AT RESPECTIVE LOCATIONS.
6Sewer System
STP OF 35 KLD WILL BE CONSTRUCTED USING RCC AND REQUIRED PUMP ROOM. STP TREATED WATER WILL BE USED IN FLUSHING.
7Drain
STORM WATER DRAINAGE WILL BE CONSTRUCTED USING 250/300/400 MM DIA PIPES AS PER DRAWING.
8Parks
LANDSCAPE WITH CIVIL WORK MANSONRY WITH 115/230 MM AND STONE, PAVERS GRASS AND VARIOUS TYPES OF PLANTATION SHRUBS. TOTAL GREEN AREA 287.45 SQ. MTRS. PROPOSED ON PLAN.
9Tree Planting
TREE PLANTATION WILL BE AS PER SANCTIONED PLAN IN WHICH 50 PERCENT TREES WILL BE EVERGREEN TREES. REQUIREMENT OF TREE AS PER SANCTION PLAN IS 11 TREE BUT WE ARE PROPOSED 20 TREE ON SANTION PLAN.
10Design For Electric Supply Including Street Lighting
INCOMING HT ELECTRICAL SUPPLY WILL BE PROVIDED BY UPPCL/NPCL VIA 1 NOS. 500 KVA DISTRIBUTION TRANSFORMER , SUBSTATION , LT PENAL AND DG SETS OF 2 NOS. 320 KVA ARE PLANNED AS PER NORMS.
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
STP OF CAPACITY 35 KL WILL BE INSTALLED AS PER DRAWING. ALL SEWERAGE WILL BE TREATED AND WASTE WATER WILL BE USED FOR LANDSCAPPING GREEN, COOLING TOWERS AND FLUSHING SYSTEM.
13Solid Waste Management And Disposal System
ORGANIC WASTE COMPOSTER SHALL BE INSTALLED AND STP IS PROPOSED AT SITE FOR REQUIRED CAPACITY.
14Water Conservation System
1 PITS OF RAIN WATER WILL BE INSTALLED AT THE SITE FOR RAIN WATER HARVESTING SYSTEM.
15Energy Management System Including Use of Renewable Energy
SOLAR SYSTEM SHALL BE PROVIDED AS PER REQUIREMENT. SOLAR PENAL WILL BE INSTALLED AT THE ROOF OF THE PROJECT FOR SOLAR POWER GENERATION AND SOLAR STREET LIGHT WILL BE INSTTALLED AT THE SITE.
16Fire Protection And Fire Safety System
IN COMPLIANCE TO NATIONAL BUILDING CODE OF INDIA 2016 PART IV REQUIREMENT, FIRE PROPTECTION AND SAFETY SYSTEM PROVIED WHICH CONSISTS OF UNDERGROUNF FIRETANK 1-100 KL. UNDERGROUND FIRE TANK 2-100 KL, FIRE OVERHEAD WATER TANK 20KL, MAIN ELCTRIC FIRE HYDRANT AND SPRINKLER PUMPS PROVIDED OF 2850 LPM EACH, 2 NOS. JOCKEY PUMPS OF 180 LPM EACH, 1 NOS. DIESEL ENGINE FIRE PUMPS OF 2850 LPM. ALL PROJECT SPRINKLERS SYSTEM PROVIDED IN COMPLIANCE OF IS CODES AND PROJECT FIRE SAFETY REQUIREMENTS.
17Social Infrastructure And Other Public Amenities Including Public Health Services
PUBLIC TOILETS AND DRIVER TOILETS
18Emergency Evacuation Services
ENERGY EVACUATION SYSTEM (SATIRCASE, EXIT WAYS ETC.) PLANNED IN COMPLIANCE TO NATIONAL BUILDING CODE OF INDIA 2016 PART IV, REFUGE AREAS ALSO PROVIDED IN COMPLIANCE TO NBC 2016.
19Other Miscellaneous Work
ALL MISCELLANEOUS WORK WILL BE COMPLETED BEFORE THE COMPLETION OF PROJECT.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Jun 2031.

Sanctioned by Greater Noida Authority · 1,903 sqm of land · an approved plan of 1 block and 146 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP/SM-14-MAY-2026;2825427 Jun 202626 Jun 203126 Jun 203631 Dec 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
LS-01, SECTOR-SIGMA-II, GREATER NOIDA, DISTT. GAUTAM BUDHA NAGAR, UTTAR PRADESH1902.50Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · POSSESSION CERTICATE NO. GNIDA/COM/2026/04
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · REGISTRATION NO. 2757, DATED 24/01/2026 AT BAHI NO. 1, JILD NO. 48482, PAGES 17 TO 62
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · Promoter Affidavit Declaring that No Agent has appointed by the Promoter at the time of Registration
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Clarification Regarding balance of Rs.2 Lakh in Transaction Account
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Affidavit Regarding Escrow Account
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Affidavit for clarification of 1st installment payment along with payment statement and challanst
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Reply to letter dated 23.07.2026
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New4 Jul 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New4 Jul 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New4 Jul 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Jul 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New27 Jul 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New27 Jul 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Jul 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New27 Jul 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New4 Jul 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Jul 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New4 Jul 2026 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGREEN PROJECTS LLP
RolePromoter · current
RERA IDUPRERAPRM467543
PANABDFG3915G
CIN / TANMRTG16580E
Registered addressH-025, SITE-IV, UPSIDA, KASNA IND AREA, GRETER NOIDA, KNOWLEDGE PARK-1, KASNA, GAUTAM BUDH NAGAR-201310 UTTAR PRADESH.
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
GREEN PROJECTS LLP RERA COLLECTION A/C FOR SIGMA GALLERIABankIDFC FIRST BANK LIMITEDBranchSECTOR-ALPHA-1, GREATER NOIDABranch addressGROUND FLOOR, G-05, G-06, G-07, FIRST FLOOR F-07, F-08, F-09, PLOT C-1, BLOCK-E, KRISHNA ALPHA PLAZA, COMMERCIAL BELT-1, SECTOR ALPHA-1, GREATER NOIDA, GAUTAM BUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCIDFB0020154Branch emailupendra.singh@idfcfirstbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
GREEN PROJECTS LLP RERA SEPARATE BANK A/C FOR SIGMA GALLERIABankIDFC FIRST BANK LIMITEDBranchSECTOR-ALPHA-1, GREATER NOIDABranch addressGROUND FLOOR, G-05, G-06, G-07, FIRST FLORR-F-07, F-08, F-09, PLOT C-1, BLOCK-E, KRISHNA ALPHA PLAZA, COMMERCIAL BELT-1, SECTOR-ALPHA-1, GREATER NOIDA, GAUTAM BUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCIDFB0020154
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
GREEN PROJECTS LLP RERA TRANS BANK A/C FOR SIGMA GALLERIABankIDFC FIRST BANK LIMITEDBranchSECTOR-ALPHA-1, GREATER NOIDABranch addressGROUND FLORR G-05, G-06, G-07, FIRST FLOOR-F-07, F-08, F-09, PLOT C-1, BLOCK-E, KRISHNA ALPHA PLAZA, COMMERCIAL BELT-1, SECTOR ALPHA-1, GREATER NOIDA, GAUTAM BUDH NAGAR, UTTAR PRADESH-201308Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCIDFB0020154
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SIGMA GALLERIA

Is SIGMA GALLERIA RERA registered?

Yes. SIGMA GALLERIA is registered with UPRERA under registration number UPRERAPRJ720976, registered on 11 Aug 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SIGMA GALLERIA?

The completion date filed with UPRERA is 31 Dec 2029. No completion certificate is on record yet.

Who is the builder of SIGMA GALLERIA?

GREEN PROJECTS LLP is the promoter entity that filed SIGMA GALLERIA with UPRERA (promoter RERA ID UPRERAPRM467543). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SIGMA GALLERIA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SIGMA GALLERIA located?

SIGMA GALLERIA is registered in SIGMA-II, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SIGMA GALLERIA?

The unit plan filed with UPRERA lists OTHER, SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SIGMA GALLERIA?

The approved unit plan filed with UPRERA runs from 6 to 26 m² of carpet area (about 60 to 275 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SIGMA GALLERIA?

The approved unit plan describes 1 block and 146 units of which 82 are homes and 64 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SIGMA GALLERIA?

About 310 units per acre: 146 planned units across 0.47 acres (1,903 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗