Sunder Village is a RERA-registered residential project by Nirmala Infradevelopers Limited in Lucknow (RERA ID UPRERAPRJ9958). RERA status: Abeyance. Data as reported by UP-RERA.
RERA status as reported: Abeyance.Basic details
Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9958 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | AbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 4 Mar 2015 |
| Original start | 4 Mar 2015 |
| Project duration | 67 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Coordinates | 26.88277777777778, 81.04986111111111 |
| Applicant type | Company |
| Applicant address | 2/12 Maa Bhawan, Vibhuti Khand, Gomtinagar, Lucknow-226010, Uttar Pradesh, India |
| Applicant contact |
Registration & timeline
Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.
| RERA registered | 15 Aug 2017 |
| Promised completion | 31 Mar 2020 |
| Revised completion | 30 Sept 2020 |
| Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹22,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Already done |
| 2 | Boundary Wall constructed |
| 3 | Road Work Proper road access to the entrance and and exit of all the buildings |
| 4 | Footpaths to be constructed |
| 5 | Water Supply Including Drinking Water Facilities RCC water Tank |
| 6 | Sewer System Sewerage Sytem |
| 7 | Drain Drainage system construction underway |
| 8 | Parks NO |
| 9 | Tree Planting will be planted after the completion of the building |
| 10 | Design For Electric Supply Including Street Lighting Electric Poles would be installed after the completion of the buildings |
| 11 | Community Buildings NO |
| 12 | Treatment and Disposal System of Sewage and Sullage water under construction |
| 13 | Solid Waste Management And Disposal System to be installed at the back of the buildings |
| 14 | Water Conservation System rain water harvesting |
| 15 | Energy Management System Including Use of Renewable Energy Solar Panels would be installed after the completion of the buildings |
| 16 | Fire Protection And Fire Safety System Fire extinguishers available on each floor and fire exit stairs in each block |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Hospitals and markets etc within close proximity |
| 18 | Emergency Evacuation Services Fire Exit Stairs in each Block |
| 19 | Other Miscellaneous Work Passenger Lift as well as cargo lift will be installed in all the blocks |
Permits & extensions
0 permits
A permit shows an approval and the date it runs to, not that work matching it has been done.
Sanctioned by Lucknow Development Authority · 3,340 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Sept 2020.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Mar 2020 | 30 Sept 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
10 filings
What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 136sa | 1301 | — |
| 137 | 148.33 | — |
| 137 | 296 | — |
| 136sa | 1595 | — |
4 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 4 Mar 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 3216 | 4 Mar 2015 | other | — |
| 4178 | 31 Mar 2015 | other | — |
| 4259 | 1 Apr 2015 | other | — |
| 647 | 26 Aug 2016 | other | — |
| Document | Status | Uploaded |
|---|---|---|
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 12 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 12 Aug 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 12 Aug 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 12 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 12 Aug 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 12 Aug 2017 ↗ |
Facilities
as declared to RERA
What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | RCC water Tank |
| Fire safety (as filed with RERA) | Fire extinguishers available on each floor and fire exit stairs in each block |
| Health service | Hospitals within in close proximity of 1Km |
| Renewable energy | Solar Panels would be installed after the completion of the buildings |
| Other facilities | Passenger Lift as well as cargo lift will be installed in all the blocks |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.
| Legal name | Nirmala Infradevelopers Limited |
| Role | primary · current |
| RERA ID | UPRERAPRM18490 |
| PAN | AAECN8167A |
| CIN / TAN | LKNN06683F |
| Name of chairman | Mrs.Nirmala Dwivedi |
| Registered address | 2/12 Maa Bhawan, Vibhuti Khand, Gomtinagar, Lucknow-226010, Uttar Pradesh, India |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | NIRMALA INFRADEVELOPERS LIMITEDBankCORPORATION BANKBranchVIRAJ KHANDA/C no.IFSCCORP0001769 |
What has changed on this record
nothing recorded yet
A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about Sunder Village
Is Sunder Village RERA registered?
Yes. Sunder Village is registered with UPRERA under registration number UPRERAPRJ9958, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Sunder Village?
The completion date filed with UPRERA is 30 Sept 2020. No completion certificate is on record yet.
Who is the builder of Sunder Village?
Nirmala Infradevelopers Limited is the promoter entity that filed Sunder Village with UPRERA (promoter RERA ID UPRERAPRM18490). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Sunder Village more time to complete?
UPRERA's record carries 1 completion extension for Sunder Village, the latest running to 30 Sept 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Sunder Village have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Sunder Village located?
Sunder Village is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA. official source ↗