SKA IMPERIA is a RERA-registered residential project by JRS Buildcon LLP in Wave City, Ghaziabad,U.P, Ghaziabad (RERA ID UPRERAPRJ900092). Registered with a completion deadline of 23 Mar 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ900092 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Jul 2026 |
| Project duration | 57 months |
| Address | PLOT NO-GH-04, SPRINGWOOD ENCLAVE, SECTOR-4, Wave City, Ghaziabad, Wave City, Ghaziabad,U.P, Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Limited Liability Partnership (LLP) |
| Applicant address | SKA Group, Anthurium Tower, 12th Floor, Sector-73, Noida, Gautam Buddha Nagar, Noida, Uttar Pradesh, India, 201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
GROUP HOUSING/10257/GDA/BP/25-26/1551/25032026
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 May 2026 |
| Original completion | 23 Mar 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹34,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK190 82%
- 1 BHK26 11%
- SHOP9 4%
- 2 BHK8 3%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 9 | 24-28 |
| 3 BHK | 190 | 74-93 |
| 1 BHK | 26 | 26-53 |
| 2 BHK | 8 | 47-53 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| SKA IMPERIA · OTHER, SHOP, 3 BHK, 1 BHK, 2 BHK | 33 | 233 | 24-93 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots THE DEMARCATION OF PLOT WILL BE DONE WITH MS PIPES / GI SHEETS ON BOUNDARY OF THE PLOT |
| 2 | Boundary Wall THE TOTAL LENTH OF BOUNDARY WALL WILL BE 258 M .
THE BOUNDARY WALL WILL BE CONSTRUCTED AS PER SANCTIONED PLAN HAVING RCC COLUMNS , WALLS AND MS GRILLS UP TO 1800 MM HEIGHT |
| 3 | Road Work THE AREA OF ROAD WILL BE 330 SQM .
THE ROAD WORK WILL BE DONE AS PER SANCTIONED PLAN MADE OF RCC TRIMIX , PAVERS, STONE ETC |
| 4 | Footpaths AVERAGE WIDTH OF PATHWAYS WILLBE 1500 MM.
THE PATHWAYS , WALK WAYS WILL BE CONSTRUCTED AS PER PLAN MADE OF PAVERS/TRIMIX CONC ETC |
| 5 | Water Supply Including Drinking Water Facilities THE CAPACITY OF OWT AND UGT WILLBE APPOX 125000 LITTERS.
THE WATER SUPPLY SYSTEM INCUDES UGT/OHT / PIPE LINES/WATER SUPPLY PUMPS INCLUDING RO SYSTEM IN EACH FLAT FOR DRINKING PURPOES. THE PIPING SHALL BE DONE WITH GI/UPVC/CPVC PIPES WITH CONTROL VALVES / PRV ETC. |
| 6 | Sewer System THE SEWER SYSTEM HAVING SEWER LINES ,MANHOLES, WASTE PIPE LINE . THE SEWER WATER WILL BE TREATED WITH STP(165 KLD, MBBR TECHNOLOGY)AND TREATED WATER WILL BE USED IN IRRIGATION AND FLUSHING REQUIREMENTS |
| 7 | Drain THE DRAIN LENTH WILLBE 380 M OF VARIOUS SIZES .
THE DRAINAGE SYSTEM WILL BE CONSTRUCTED WITH PIPES AND MANHOLE AS PER DRAINAGE PLAN OF THE PROJECT. |
| 8 | Parks THE AREA IN PARK WILL BE APPROXIMATE 16000 SQ.FT AT GROUND LEVEL AND TERRACE FLOOR THE PARKS WILL BE DEVELOPED AS PER SITE PLAN INCLUDING TREES PLANTS AND LOCAL FLOWERS . |
| 9 | Tree Planting ABOUT 60 NUMBER OF TREES WILL BE PLANTED AT VARIOUS LOCATION IN THE PROJECT. THE LOCAL TYPE OF TREES WILL BE PLANTED AS PER EC REQUIREMENT AS PER LANDSCAPE PLAN. |
| 10 | Design For Electric Supply Including Street Lighting TOTAL 1000-KVA TRANSFORMERS WILL BE INSTALLED FOR ELECTRIC SUPPLY FOR THE PROJECT. THE DESIGN OF ELECTRICAL SUPPLY INCLUDING STREET LIGHTINGS SHALL BE DONE AS PER ELECT PLAN AND NORMS OF ELECTRICITY SUPPLY AGENCY (UPPCL) |
| 11 | Community Buildings THE APPROXIMATE AREA OF COMMUNITY FACILITIES WILL BE 12900 SQ.FT. THE COMMUNITY BUILDING SHALL BE CONSTRUCTED AS PER SANCTIONED MAP WHICH INCLUDE HALL, CHILDREN PLAY AREA , GYM , WATER BODY ENTRANCE LOBBY ETC. |
| 12 | Treatment and Disposal System of Sewage and Sullage water THE SEWER GENERATED IN THE PROJECT SHALL BE TREATED IN STP ( 165 KLD , MBBR TECHNOLOGY) AND RECYCLE WATER WILL BE USED IN FLUSHING AND LANDSCAPING |
| 13 | Solid Waste Management And Disposal System APPROXIMATE 256 KG PER DAY MUNICIPAL WASTE WILL BE GENERATED FROM THE PROJECT. THE SOLID WASTE MANAGEMENT AND DISPOSAL SHALL BE DONE AS PER APPLICABLE RULES OF STATE POLLUTION BOARD. OWC WILL BE INSTALLED WITH IN PREMISES AFTER SEPARATION OF WET AND DRY WASTE |
| 14 | Water Conservation System THE RAIN WATER HARVESTING ( 2 NUMBER OF 5.65 CUM ) SHALL BE DONE AS PER EC NORMS TO RECHARGE GROUND WATER TABLE. THE LOW FLOW WATER FIXTURES WILL BE USED FOR LESS WATER CONSUMPTION |
| 15 | Energy Management System Including Use of Renewable Energy THE ENERGY MANAGEMENT SHALL BE DONE AS PER ECBC REGULATIONS INCLUDING ON LINE ROOF TOP SOLAR SYSTEM ( 80 KW ) FOR BASEMENT LIGHTING |
| 16 | Fire Protection And Fire Safety System THE FIRE PROTECTION , DETECTION AND ALRAM SYSTEM SHALL BE DONE AS PER NOC OF UP FIRE DEPARTMENT WHICH INCLUDE FIRE SPRINKLER, FIRE PANNEL, FIRE EXAUST SYSTEM IN BASEMENT AND 200000 LTR UGT AND OHT FOR FIRE FIGHTING. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services THE community HALL, children play Area , Gym , TT room , Swimming pool ,open Gym etc shall be developed in this peoject. THE TOTAL AREA WILL BE APPROXIMATE 12900 SQ.FT. |
| 18 | Emergency Evacuation Services the Emergency Evacuation Plan including fire staircase, Refuse area , Fire pathway shall be developed as per Fire NOC WHICH INCLUDE FIRE STAIRCASE, FIRE EXIT SIGNS AND REFUSE AREA. |
| 19 | Other Miscellaneous Work This is IGBC precertified green building having spl glass , Stp, owc , low flow water fixures for reducing water and electricity requirment |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | HOMES AND DESIRE CONSULTING PRIVATE LIMITED | UPRERAAGT22961 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 24 Mar 2031.
Sanctioned by Ghaziabad Development Authority · 5,874 sqm of land · an approved plan of 1 block and 233 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| GROUP HOUSING/10257/GDA/BP/25-26/1551/25032026 | 25 Mar 2026 | 24 Mar 2031 | 24 Mar 2033 | 23 Mar 2031 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-04, SECTOR-4, WAVE CITY | 5874.31 | Plot |
| Sale deed · 783 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · 2717 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4018 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4020 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 4022 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4203 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5443 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5846 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6018 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6020 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 287 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4055 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2928 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 29 Apr 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 13 May 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 13 May 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 27 Mar 2026 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 26 Mar 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 Apr 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 Apr 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 Apr 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 8 May 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 26 Mar 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 27 Mar 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 20 May 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 21 Apr 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 29 Apr 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 13 May 2026 ↗ |
Quarterly progress reports
1 filed report
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
1 quarterly progress report is on file with UPRERA, for 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | JRS Buildcon LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM457959 |
| PAN | AASFJ8904E |
| CIN / TAN | MRTJ03956B |
| Registered address | SKA Group, Anthurium Tower, 12th Floor, Sector-73, Noida, Gautam Buddha Nagar, Noida, Uttar Pradesh, India, 201301 |
| RERA contact | |
| Registered since | 2026 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | JRS BUILDCON LLP COLLECTION ACCOUNT FOR SKA IMPERIABankICICI BANK LTDBranchRAJ NAGAR EXTBranch addressGF-21-22, VVIP MALL, RAJ NAGAR EXTBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007546Branch emailshailendrakumar.dwivedi@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | JRS BUILDCON LLP SEPARATE ACCOUNT FOR SKA IMPERIABankICICI BANK LTDBranchRAJ NAGAR EXTBranch addressG-21,22-VVIP MALL, RAJ NAGAR EXT, GHAZIABAD, U.PBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007546 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | JRS BUILDCON LLP RERA TRANSACTION ACCOUNT FOR SKA IMPERIABankICICI BANK LTDBranchRAJ NAGAR EXTBranch addressG-21-22, VVIP MALL, RAJ NAGAR EXT,GHAZIABAD,U.PBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007546 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about SKA IMPERIA
Is SKA IMPERIA RERA registered?
Yes. SKA IMPERIA is registered with UPRERA under registration number UPRERAPRJ900092, registered on 25 May 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SKA IMPERIA?
The completion date filed with UPRERA is 23 Mar 2031. No completion certificate is on record yet.
Who is the builder of SKA IMPERIA?
JRS Buildcon LLP is the promoter entity that filed SKA IMPERIA with UPRERA (promoter RERA ID UPRERAPRM457959). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SKA IMPERIA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SKA IMPERIA located?
SKA IMPERIA is registered in Wave City, Ghaziabad,U.P, Ghaziabad, as filed with UPRERA.
What configurations are available in SKA IMPERIA?
The unit plan filed with UPRERA lists OTHER, SHOP, 3 BHK, 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SKA IMPERIA?
The approved unit plan filed with UPRERA runs from 24 to 93 m² of carpet area (about 255 to 1,001 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SKA IMPERIA?
The approved unit plan describes 1 block and 233 units of which 224 are homes and 9 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SKA IMPERIA?
About 161 units per acre: 233 planned units across 1.45 acres (5,874 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗