The Aranya Phase 4(De-Registered Project)

UPRERADe-registeredRERA data as of 17 Aug 2026

The Aranya Phase 4(De-Registered Project) is a RERA-registered residential project by Unnati Fortune Holdings Ltd in Gautam Budh Nagar (RERA ID UPRERAPRJ7010). RERA status: De-registered. Data as reported by UP-RERA. as reported by UPRERA

RERA status as reported: De-registered.
Project cost
285
Land area
30,794 7.61 acres
Units (from plan)
8
Density (derived)
1 /acre
Towers (from plan)
4
Config
3 BHK/4 BHK/VILLA
Carpet
106-373
Registered
8 Aug 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7010
Project categoryResidential
Registration typeOngoing
RERA statusDe-registeredDe-registeredA project UP-RERA no longer carries on its live register.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start4 Dec 2017
Original start4 Dec 2017
Project duration49
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Coordinates28.589972222222222, 77.40238611111111
Applicant typeCompany
Applicant addressB-117, Sector 67, Noida
Applicant contact8826190022 · cmd@ufgrp.com

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered8 Aug 2017
Promised completion31 Dec 2021
Revised completion— none granted
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,59,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.

Total units · towers · floors8 · 4 · 2 (units from plan)
  • 3 BHK4 50%
  • 4 BHK2 25%
  • VILLA2 25%
ConfigurationUnitsCarpet area
3 BHK4106-116
4 BHK2143
VILLA2268-373
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T8 · 3 BHK, 4 BHK13106-143
T9 · 3 BHK, 4 BHK13106-143
TYPE-A · VILLA11268
TYPE-B · VILLA11373
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Sr.Development work declared to RERA
1Demarcation of Plots
20 METRE WIDE GREENBELT IN EAST , 24 METRE WIDE ROAD IN SOUTH, 24 METRE WIDE ROAD IN WEST AND 20 METRE WIDE GREEN BELT IN NORTH.
2Boundary Wall
RCC PILLARS , BRICK WORK AND MS RAILING
3Road Work
GSP AND CONCRETE PAVER BLOCKS
4Footpaths
GRANITE KALEGI AND CONCRETE PAVER AS PER DESIGN
5Water Supply Including Drinking Water Facilities
TREATED WATER THROUGH UGT AND STP
6Sewer System
WELL CONNECTED WITH AUTHORITY LINE AND STP AS PER NORMS
7Drain
WELL CONNECTED WITH RAIN HARVESTING PITS AS PER NORMS
8Parks
IN HOUSE HUGE PARK AT PODIUM LEVEL AND AUTHORITY PARK IS SOUTH OF THE LAND PARCEL
9Tree Planting
2 SIDES 20 METRE GREEN BELT.
10Design For Electric Supply Including Street Lighting
AS PER NORMS
11Community Buildings
INHOUSE CLUBHOUSE
12Treatment and Disposal System of Sewage and Sullage water
STP
13Solid Waste Management And Disposal System
PROVISION FOR GARBAGE CHUTE
14Water Conservation System
RAIN WATER HARVESTING SYSTEM AND PITS AS PER GOVERNMENT NORMS
15Energy Management System Including Use of Renewable Energy
AS PER GOVERNMENT NORMS
16Fire Protection And Fire Safety System
SPRINKLER SYSTEM, SMOKE DEDUCTER , HEAT DEDUCTER, HOOTER, FHC, YARD HYDRANT, OVER HEAD WATER TANK, UNDER GROUND WATER TANK, PUMP ROOM WITH MODERN FIRE PUMPS AS PER NORMS.
17Social Infrastructure And Other Public Amenities Including Public Health Services
TRIPATHI HOSPITAL (100 MT), ARTI HOSPITAL (50 MT), SURABHI HOSPITAL (3KM)
18Emergency Evacuation Services
TWO STAIR CASES WITHIN THE DISTANCE OF 9M -12M IN EACH TOWER
19Other Miscellaneous Work
LANDSCAPE WORK, FOUNTAIN WORK, BADMINTON COURT WORK , SWIMMING POOL WORK ETC
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. Being listed is a filing, not a recommendation, and RERA does not state here whether a registration is still valid.

Sr.AgentRERA registration
1KARTIK INFRATOWN PRIVATE LIMITEDUPRERAAGT10413
2PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
3SAMS GROUPUPRERAAGT10084
4Sapphire EstateUPRERAAGT12673
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

A permit shows an approval and the date it runs to, not that work matching it has been done.

2 sanctioning permits are on record with UPRERA, the latest valid to 17 Feb 2021. All 2 carry a revalidation.

Sanctioned by Noida Authority · 30,794 sqm of land · an approved plan of 4 blocks and 8 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
III-151/87118 Feb 201617 Feb 202131 Dec 202131 Dec 202118 Feb 2016
III-151/87118 Feb 201617 Feb 202131 Dec 202131 Dec 202118 Feb 2016
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

15 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-02, SECTOR-119, NOIDA72594Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1055
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF
Lease deed · 1055
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old31 Jul 2017

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameUnnati Fortune Holdings Ltd
Roleprimary · current
RERA IDUPRERAPRM13446
PANAABCU3239K
CIN / TANU74900DL2011PLC221126
Name of chairmanVinod Kumar Chaswal
Registered addressB-117, Sector 67, Noida
RERA contactcmd@ufgrp.com · 8826190022
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details - public record, shown as reported by UPRERA. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

What has changed on this record

nothing recorded yet

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

4 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No project bank account is published for this project.Ask which RERA-designated account payments are to be made to, and check the details against the UP-RERA page before paying anything.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
  • No architect, engineer or contractor is published for this project.Ask who the architect and engineer of record are - they are the professionals who certify each quarterly filing.

Common questions about The Aranya Phase 4(De-Registered Project)

Is The Aranya Phase 4(De-Registered Project) RERA registered?

Yes. The Aranya Phase 4(De-Registered Project) is registered with UPRERA under registration number UPRERAPRJ7010, registered on 8 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for The Aranya Phase 4(De-Registered Project)?

The completion date filed with UPRERA is 31 Dec 2021. No completion certificate is on record yet.

Who is the builder of The Aranya Phase 4(De-Registered Project)?

Unnati Fortune Holdings Ltd is the promoter entity that filed The Aranya Phase 4(De-Registered Project) with UPRERA (promoter RERA ID UPRERAPRM13446). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Where is The Aranya Phase 4(De-Registered Project) located?

The Aranya Phase 4(De-Registered Project) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in The Aranya Phase 4(De-Registered Project)?

The unit plan filed with UPRERA lists 3 BHK, 4 BHK and VILLA. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in The Aranya Phase 4(De-Registered Project)?

The approved unit plan filed with UPRERA runs from 106 to 373 m² of carpet area (about 1,145 to 4,015 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in The Aranya Phase 4(De-Registered Project)?

The approved unit plan describes 4 blocks and 8 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is The Aranya Phase 4(De-Registered Project)?

About 1 units per acre: 8 planned units across 7.61 acres (30,794 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 17 Aug 2026. official source ↗