tulip grace

UPRERARegistered

tulip grace is a RERA-registered residential project by TULIP INFRATOWERS PRIVATE LIMITED in Bareilly (RERA ID UPRERAPRJ5849). Registered with UP-RERA.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5849
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryBareily Development Authority
Proposed start22 Nov 2012
Original start22 Nov 2012
Project duration-1354
AddressBareilly, Bareilly
TehsilBareilly
Applicant typeCompany
Applicant addressTULIP GRACE R.I.V.I. ROAD BAREILLY
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    291/12/gh/11

  2. Building permit sanctioned

    291/12/gh/11

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 Aug 2017
Original completion
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹28,000
Sanctioning authorityBareily Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors91 · 1 · 11 (units from plan)
Homes · commercial units90 · 1 (shops and offices filed in the same plan)
  • 2 BHK54 59%
  • 3 BHK36 40%
  • SHOP1 1%
ConfigurationUnitsCarpet area
SHOP1190
2 BHK5463-68
3 BHK3679
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
tulip grace · OTHER, SHOP, 2 BHK, 3 BHK119163-190
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Sr.Development work declared to RERA
1Demarcation of Plots
y
2Boundary Wall
y
3Road Work
y
4Footpaths
y
5Water Supply Including Drinking Water Facilities
y
6Sewer System
y
7Drain
y
8Parks
y
9Tree Planting
y
10Design For Electric Supply Including Street Lighting
y
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
y
13Solid Waste Management And Disposal System
y
14Water Conservation System
y
15Energy Management System Including Use of Renewable Energy
y
16Fire Protection And Fire Safety System
y
17Social Infrastructure And Other Public Amenities Including Public Health Services
y
18Emergency Evacuation Services
y
19Other Miscellaneous Work
y
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 21 Nov 2017. It carries a revalidation.

Sanctioned by Bareily Development Authority · 4,590 sqm of land · an approved plan of 1 block and 91 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
291/12/gh/1122 Nov 201221 Nov 201721 Nov 2020—22 Nov 2012

Land & documents

0 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4951
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTULIP INFRATOWERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM12052
PANAADCT1674P
CIN / TANU45400UP2008PTC036253
Name of chairman62 RESIDENCY GARDEN BAREILLY
Registered addressTULIP GRACE R.I.V.I. ROAD BAREILLY
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Bareilly

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

5 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No project bank account is published for this project.Ask which RERA-designated account payments are to be made to, and check the details against the UP-RERA page before paying anything.
  • No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
  • No architect, engineer or contractor is published for this project.Ask who the architect and engineer of record are - they are the professionals who certify each quarterly filing.

Common questions about tulip grace

Is tulip grace RERA registered?

Yes. tulip grace is registered with UPRERA under registration number UPRERAPRJ5849, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Who is the builder of tulip grace?

TULIP INFRATOWERS PRIVATE LIMITED is the promoter entity that filed tulip grace with UPRERA (promoter RERA ID UPRERAPRM12052). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Where is tulip grace located?

tulip grace is registered in Bareilly, as filed with UPRERA.

What configurations are available in tulip grace?

The unit plan filed with UPRERA lists OTHER, SHOP, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in tulip grace?

The approved unit plan filed with UPRERA runs from 63 to 190 m² of carpet area (about 674 to 2,044 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in tulip grace?

The approved unit plan describes 1 block and 91 units of which 90 are homes and 1 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is tulip grace?

About 80 units per acre: 91 planned units across 1.13 acres (4,590 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗