UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE

UPRERACompleted

UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE is a RERA-registered residential project by Uppal Chadha Hi-Tech Developers Pvt. Ltd. in Ghaziabad (RERA ID UPRERAPRJ865343). RERA status: Completed on 12 Nov 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ865343
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start16 Aug 2022
Project duration41 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    GDA/BP/20-21/0441

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion certificate filed

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 Oct 2022
Original completion28 Dec 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary12 Nov 2024
Registration fee₹84,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors160 · 1 · 5 (units from plan)
  • 4 BHK128 80%
  • 5 BHK32 20%
ConfigurationUnitsCarpet area
4 BHK128156
5 BHK32217
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower-4 · 4 BHK, 5 BHK5160156-217
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Niraj Kumar Nanda
License CA/2009/46122
Cosmos Sector-134, Noida
Engineer
Dr. Rajeev Dua
202 and 203 Himland House, Commercial Complex, Karampura, New Delhi-110015
Contractor
Modern Construction Co. India
First Floor F-2, C 103/F2, DLF Dilshad Extension 2, Sahibabad, Uttar Pradesh-201005, India
Sr.Development work declared to RERA
1Demarcation of Plots
Plots demarcated as per Approved Layout of Building Plan.
2Boundary Wall
Boundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m.
3Road Work
Width (m) Width of Carriage way (m) GSB (mm) WMM (mm) interlocking tiles over sand bed (mm) 9.0 9.0 150 100 65 12.0 12.0 150 100 65
4Footpaths
Width (m) Width of footpath (m) GSB (mm) Interlocking tiles over sand bed (mm) 9.0 - 2.5 60 12.0 - 75 60
5Water Supply Including Drinking Water Facilities
1) The Water Supply system planned to provide 24 X7 Water Supply 2) HDPE pipe PN-8, PE-80 for Water Supply networks 3) 4x105 KL RCC storage tanks (4x105 KL UGT) 4, 1 Tube-wells
6Sewer System
1) RCC pipe class NP2 has been proposed 2) Manhole/Chambers made with Brick Masonry in Conical Shape ranging from dia 900 to 1500mm
7Drain
1) RCC pipe class NP2 has been used 2) Manhole/Chambers made with Brick Masonry in Conical shape with dia 900mm
8Parks
Not Applicable
9Tree Planting
1) One Tree on one side of 9m road and 7.5m road
10Design For Electric Supply Including Street Lighting
1) Compact substation 2000 KVA - 1Nos 2) 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and single arm bracket Street Light Poles with 55 watt cast iron LED fixture. 3) Feeder panels-6 way 8 way and 12 way.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
550 KLD STP with MBBR Technology is planned within the premise.
13Solid Waste Management And Disposal System
1) Door to Door Collection shall be ensured from each household. 2) Segregation waste treatment facility at Sec-6. 3) Organic waste is composted with the help of Automatic organic waste Converter Machine.
14Water Conservation System
1Nos. Modular type rain water harvesting pits planned in Green areas of the proposed development.
15Energy Management System Including Use of Renewable Energy
1) Use LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC. 2) Installation solar PV cells as required capacity synched with power supply internal grid are being proposed to meet requirement of EIA Authorities. 3) Energy Metering to regulate the usage of Electricity. 4) Efficient Equipment like Motors, Pump, ACs, Lifts, etc. 5) Zero use of Hydro-chlorofluorocarbon (HCFC) refrigerants in (HVAC equipment unitary air-conditioners installed in the buildings. 6) Use of halon free fire suppression equipment.
16Fire Protection And Fire Safety System
Fire Staircases and FHC is planned at each floor as per NBC requirement.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire Staircases Planned as per NBC requirement.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

6 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Amardeep platinum estatesUPRERAAGT18979
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3DEEPAK KUMARUPRERAAGT19274
4INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
5Mitresh SharmaUPRERAAGT14496
6RANJAN KUMAR C/O ANKUR REAL ESTATE DEVELOPERSUPRERAAGT13363
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 28 Dec 2025. 1 of them carries a revalidation.

Sanctioned by Ghaziabad Development Authority · 15,768 sqm of land · an approved plan of 1 block and 160 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
GDA/BP/20-21/044129 Dec 202028 Dec 202527 Dec 202828 Dec 2025—
GDA/BP/20-21/044129 Dec 202028 Dec 202527 Dec 202828 Dec 202529 Dec 2020
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2349331.72Khasra
2353859.59Khasra
2371298.06Khasra
238102.6Khasra
2391107.13Khasra
24168.75Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Lease deed · P174003
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New16 Sept 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New26 Aug 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Aug 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New26 Aug 2022 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New26 Aug 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New23 Sept 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New23 Sept 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New23 Sept 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Aug 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New26 Aug 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New16 Sept 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Aug 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New26 Aug 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New16 Sept 2022 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2025-Q3.

QuarterConstructionCertificates
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q275.47%CA ↗ · Arch ↗ · Eng ↗
2025-Q375.4%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUppal Chadha Hi-Tech Developers Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM5538
PANAAACU7200M
CIN / TANU45201DL2004PTC128784
Registered addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UCHDPL COLLECTION ACCOUNT FOR VERIDIA 4 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchNEHRU NAGAR, GHAZIABADBranch addressPLOT-3, N, N30 AMBEDKAR ROAD NEHRU NAGAR, GHAZIABAD-UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UCHDPL SEPARATE BANK ACCOUNT FOR VERIDIA 4 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchNEHRU GANAR, GHAZIABADBranch addressPLOT NO-3, N, N-30 AMBEDKAR ROAD NEHRU NAGAR GHAZIABAD-UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UCHDPL TRANSACTION ACCOUNT FOR VERIDIA 4 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchNEHRU NAGAR, GHAZIABADBranch addressPLOT NO-3 N, N-30 AMBEDKAR ROAD NEHRU NAGAR GHAZIABAD-UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)1056 (Under Registration - 1 ) → 1056 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 0 ) → 1056 (Under Registration - 1 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 1 ) → 1055 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE

Is UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE RERA registered?

Yes. UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE is registered with UPRERA under registration number UPRERAPRJ865343, registered on 1 Oct 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE been completed?

UPRERA lists UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE as completed, with a completion certificate dated 12 Nov 2024, against a filed deadline of 28 Dec 2025.

Who is the builder of UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE?

Uppal Chadha Hi-Tech Developers Pvt. Ltd. is the promoter entity that filed UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM5538). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE located?

UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE?

The unit plan filed with UPRERA lists 4 BHK and 5 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE?

The approved unit plan filed with UPRERA runs from 156 to 217 m² of carpet area (about 1,675 to 2,334 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE?

The approved unit plan describes 1 block and 160 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE?

About 41 units per acre: 160 planned units across 3.90 acres (15,768 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗