UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE is a RERA-registered residential project by Uppal Chadha Hi-Tech Developers Pvt. Ltd. in Ghaziabad (RERA ID UPRERAPRJ196239). RERA status: Completed on 29 Dec 2025.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ196239 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Oct 2023 |
| Project duration | 27 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | M-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
GDA/BP/20-21/0441
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Nov 2023 |
| Original completion | 28 Dec 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 Dec 2025 |
| Registration fee | ₹84,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 4 BHK112 80%
- 5 BHK28 20%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 112 | 156 |
| 5 BHK | 28 | 217 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TOWER-6 · 4 BHK, 5 BHK | 5 | 140 | 156-217 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plots Demarcated as per Approved layout of Building Plan. |
| 2 | Boundary Wall Boundary wall shall be made with standard Fly ash Brick and MS Grill with thickness of 230mm and height 1.8m |
| 3 | Road Work Width (M) Width of Carriage way (M) GSB(MM) WMM(MM) Interlocking Tiles over sand Bed(MM)
9.0 9.0 150 100 65
12.0 12.0 150 100 65
Note - Cross sections are enclosed as Annexure |
| 4 | Footpaths Width(M) GSB(MM) Interlocking tiles Over sand Bed (MM)
9.0 2.5 60
12.0 75 60 |
| 5 | Water Supply Including Drinking Water Facilities 1.) The Water Supply system planned to provide 24 X 7 Water Supply.
2.) HDPE Pipe PN-8, PE-80, For Water Supply network
3.) 4 X 105KL RCC Storage Tanks ( 4 X 105 KL UGT)
4.) 1 Tube- Wells |
| 6 | Sewer System 1.) RCC Pipe Class NP2 has been Proposed
2.) Manholes / Chambers made with Masonry in Conical Shape ranging from dia 900 to 1500 mm |
| 7 | Drain 1.) RCC Pipe class NP2 has been used
2.) Manholes/ Chambers made with Masonry in Conical Shape with dia 900 mm |
| 8 | Parks Not applicable |
| 9 | Tree Planting 1.) One tree On One side of 9 m road and 7.5 road
2.) Both side Trees on 12m and 18m road |
| 10 | Design For Electric Supply Including Street Lighting 1.) Compact Substation 2000 KVA -1 Nos
2.) 5m Cast Iron Pole with GI ribbed/Grooved extrusion and single arm bracket street light poles with 50 watt cast Iron LED Fixtures
3.) Feeder Panels-6 way, 8 way ,and 12 way |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water 550 KLD STP with MBBR Technology is planned within the premise. |
| 13 | Solid Waste Management And Disposal System 1.) Door to Door collection shall be ensured from each household.
2.) Segregation waste treatment facility at sector -6
3.) Organic Waste is composted with the help of automatic organic waste converter machine. |
| 14 | Water Conservation System 1 nos. Modular Type rain water harvesting pits planned in green areas of the proposed development |
| 15 | Energy Management System Including Use of Renewable Energy 1.) Use of LED Lights with Lower LPD"s (Lighting Power Density) when compared to baseline set by ECBC
2.) Installation Sloar PV Cells as required capacity Synched with power supply Internal Grid are being Proposed To meet requirements of EIA Authorities.
3.)Energy Metering To Regulate the usage of electricity
4.)Efficient Equipment like Motors, Pumps, Ac"s, Lifts etc.
5.)Zero use of Hydro-Chlorofluorocarbon(HCFC) refrigerants in (HVAC) equipment and Unitary Air- conditioner Installed in the Buildings.
6.) Use of Halon Free fire suppression equipment |
| 16 | Fire Protection And Fire Safety System Fire Staircases and FHC, is planned at each floor as per NBC requirements |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Fire Staircase planned as per NBC Requiremnets |
| 19 | Other Miscellaneous Work NA |
Registered agents
6 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Amardeep platinum estates | UPRERAAGT18979 |
| 2 | Amit Bidhuri | UPRERAAGT17591 |
| 3 | BHARTI MITTAL | UPRERAAGT16599 |
| 4 | BLUE SAPPHIRE INFRASTRUCTURE LLP | UPRERAAGT23418 |
| 5 | Rathi Global Realty Services Private Limited | UPRERAAGT21920 |
| 6 | SUNIL KMAR | UPRERAAGT21636 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 28 Dec 2025.
Sanctioned by Ghaziabad Development Authority · 15,827 sqm of land · an approved plan of 1 block and 140 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| GDA/BP/20-21/0441 | 29 Dec 2020 | 28 Dec 2025 | 27 Dec 2028 | 28 Dec 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
31 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 256 | 1154.11 | Khasra |
| 247 | 921.78 | Khasra |
| 250 | 520 | Khasra |
| 249 | 317 | Khasra |
| 258 | 801.88 | Khasra |
| 259 | 786 | Khasra |
| 260 | 1333.67 | Khasra |
| 243 | 117.90 | Khasra |
| 242 | 23.78 | Khasra |
| 251 | 1463.14 | Khasra |
| 252 | 1548.37 | Khasra |
| 246 | 1647.51 | Khasra |
| 254 | 836.88 | Khasra |
| 263 | 143.68 | Khasra |
| 265 | 2761.99 | Khasra |
| 253 | 1449.31 | Khasra |
| Lease deed · AT780410 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Khatauni extract · 1426-1431(01/07/2018 -30/06/2024) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Allotment letter from the authority · GDA/BP/20-21/0441 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · GDA/BP/20-21/0441 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · GDA/BP/20-21/0441 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · GDA/BP/20-21/0441 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · GDA/BP/20-21/0441 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 24 Aug 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Aug 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 24 Aug 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 24 Aug 2023 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 24 Aug 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 24 Aug 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 24 Aug 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 24 Aug 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 24 Aug 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 3 Nov 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 1 Nov 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 24 Aug 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 29 Aug 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 20 Sept 2023 ↗ |
Quarterly progress reports
9 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
9 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 33.08% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 56.28% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Uppal Chadha Hi-Tech Developers Pvt. Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5538 |
| PAN | AAACU7200M |
| CIN / TAN | U45201DL2004PTC128784 |
| Registered address | M-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UCHDPL COLLECTION ACCOUNT FOR VERIDIA 6 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchAXIS BANK LTD, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABADBranch addressPLOT NO. 3, N-30, AMBEDKAR ROAD, NEHRU NAGAR,GHAZIABAD-201001-UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UCHDPL SEPARATE BANK ACCOUNT FOR VERIDIA 6 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchAXIS BANK LTD, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABADBranch addressPLOT NO.-3, N-30,AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD-201001-UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UCHDPL TRANSACTION AACOUNT VERIDIA 6 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchAXIS BANK LTD, AMBEDKAR ROAD NEHRU NAGAR, GHAZIABADBranch addressPLOT NO.- 3, N-30, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD-201001-UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 1056 (Under Registration - 1 ) → 1056 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 1055 (Under Registration - 0 ) → 1056 (Under Registration - 1 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 1055 (Under Registration - 1 ) → 1055 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE
Is UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE RERA registered?
Yes. UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE is registered with UPRERA under registration number UPRERAPRJ196239, registered on 28 Nov 2023. Estanzo reproduces that filing; it does not verify the work behind it.
Has UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE been completed?
UPRERA lists UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE as completed, with a completion certificate dated 29 Dec 2025, against a filed deadline of 28 Dec 2025.
Who is the builder of UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE?
Uppal Chadha Hi-Tech Developers Pvt. Ltd. is the promoter entity that filed UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM5538). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE located?
UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE?
The unit plan filed with UPRERA lists 4 BHK and 5 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE?
The approved unit plan filed with UPRERA runs from 156 to 217 m² of carpet area (about 1,675 to 2,334 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE?
The approved unit plan describes 1 block and 140 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE?
About 36 units per acre: 140 planned units across 3.91 acres (15,827 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗