UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE is a RERA-registered residential project by Uppal Chadha Hi-Tech Developers Pvt. Ltd. in Ghaziabad (RERA ID UPRERAPRJ250078). Registered with a completion deadline of 28 Dec 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ250078 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 16 Aug 2022 |
| Project duration | 41 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | M-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (2)
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Oct 2022 |
| Original completion | 28 Dec 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 Dec 2025 |
| Registration fee | ₹52,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 4 BHK104 70%
- 5 BHK26 18%
- SHOP18 12%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 18 | 14 |
| 4 BHK | 104 | 156 |
| 5 BHK | 26 | 217 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Convenient Shop · SHOP | 2 | 18 | 14 |
| Tower-5 · 4 BHK, 5 BHK | 5 | 130 | 156-217 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plots Demarcated as per approved layout of Building Plan. |
| 2 | Boundary Wall Boundary wall shall be made with standard fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m. |
| 3 | Road Work Width (m) Width of Carriage way (m) GSB (mm) WMM (mm) Interlocking tiles over sand bed (mm)
7.5 7.5 150 100 65
9.0 9.0 150 100 65 |
| 4 | Footpaths Width (m) Width of footpath (m) GSB (mm) Interlocking tiles over sand bed (mm)
7.5 - 2.5 60
9.0 - 75 60 |
| 5 | Water Supply Including Drinking Water Facilities 1) The Water supply system planned to provid 24 x 7 Water supply.
2) HDPE pipe PN-8, PE-80 for water supply network.
3) 4x105 KL RCC storage tanks (4x105 KL UGT).
4) 1 Tube-wells. |
| 6 | Sewer System 1) RCC pipe class NP2 has been proposed.
2) Manholes/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500 mm. |
| 7 | Drain 1) RCC pipe class NP2 has been used.
2)Manholes/Chambers made with Brick Mason |
| 8 | Parks Not Applicable |
| 9 | Tree Planting 1) One tree on one side of 9m road and 7.5m road
2) Both side trees on 9m road and 7.5m road |
| 10 | Design For Electric Supply Including Street Lighting 1) Compact substation 2000 KVA - 1Nos.
2) 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and Single arm bracket Street Light poles with 55 watt cast iron.
3) Feeder Panels-6 Way, 8 Way and 12 Way. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water 550 KLD STP with MBBR Technology is planned within the premise. |
| 13 | Solid Waste Management And Disposal System 1) Door to Door Collection shall be ensured from each household.
2) Segregation waste treatment facility at Sector-6.
3) Organic waste is composted with the help of Automatic organic waste converter machine. |
| 14 | Water Conservation System 1Nos. Modular type rain water harvesting pits planned in green areas of the proposed development. |
| 15 | Energy Management System Including Use of Renewable Energy 1) Use of LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC.
2) Installation solar PV cells as required capacity synched with power supply internal Grid are being proposed to meet requirements of EIA Authorities.
3) Energy Metering to regulate the usage of Electricity.
4) Efficient equipmets like Motors, Pumps, ACs, Lifts, etc.
5) Zero use of Hydro-Chlorofluorocarbon (HCFC) refrigerants in (HVAC) equipment and Unitary Air-Conditioners installed in the building(s).
6) Use of halon free suppression equipment. |
| 16 | Fire Protection And Fire Safety System Fire Staircase and FHC, is planned at each floor as per NBC requirement. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Fire Staircase Planned as per NBC requirement. |
| 19 | Other Miscellaneous Work NA |
Registered agents
6 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Amardeep platinum estates | UPRERAAGT18979 |
| 2 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 3 | DEEPAK KUMAR | UPRERAAGT19274 |
| 4 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 5 | Mitresh Sharma | UPRERAAGT14496 |
| 6 | RANJAN KUMAR C/O ANKUR REAL ESTATE DEVELOPERS | UPRERAAGT13363 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 28 Dec 2025. 2 of them carry a revalidation.
Sanctioned by Ghaziabad Development Authority · 9,472 sqm of land · an approved plan of 2 blocks and 148 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| GDA/BP/20-21/0441 | 29 Dec 2020 | 28 Dec 2025 | 27 Dec 2028 | 28 Dec 2025 | — | |
| GDA/BP/23-24/1411 | 29 Dec 2020 | 28 Dec 2025 | 27 Dec 2028 | 28 Dec 2025 | 29 Dec 2020 | |
| GDA/BP/23-24/1411 | 29 Dec 2020 | 28 Dec 2025 | 27 Dec 2028 | 28 Dec 2025 | 29 Dec 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
25 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 234 | 7301.52 | Khasra |
| 242 | 173.85 | Khasra |
| 243 | 212.04 | Khasra |
| 244 | 221.62 | Khasra |
| 245 | 252.29 | Khasra |
| 240 | 12.98 | Khasra |
| 265 | 1014.27 | Khasra |
| 266 | 156.26 | Khasra |
| 269 | 1.78 | Khasra |
| 270 | 9.26 | Khasra |
| 271 | 117.27 | Khasra |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Lease deed · P 201233 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 16 Sept 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 27 Aug 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 27 Aug 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 27 Aug 2022 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 27 Aug 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 23 Sept 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 Sept 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 Sept 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 27 Aug 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 27 Aug 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 16 Sept 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 27 Aug 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 27 Aug 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 16 Sept 2022 ↗ |
Quarterly progress reports
14 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
14 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 58.17% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 78.98% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Uppal Chadha Hi-Tech Developers Pvt. Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5538 |
| PAN | AAACU7200M |
| CIN / TAN | U45201DL2004PTC128784 |
| Registered address | M-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UCHDPL COLLECTION ACCOUNT FOR VERIDIA 5 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchNEHRU NAGAR, GHAZIABADBranch addressPLOT NO 3,N N 30, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UCHDPL SEPARATE BANK ACCOUNT FOR VERIDIA 5 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchNEHRU NAGAR, GHAZIABADBranch addressPLOT NO 3, N, N30 AMBEDKAR ROAD NEHRU NAGAR, GHAZIABAD UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UCHDPL TRANSACTION ACCOUNT FOR VERIDIA 5 OAKWOOD ENCLAVEBankAXIS BANK LTD.BranchNEHRU NAGAR, GHAZIABADBranch addressPLOT NO 3, N, N 30 AMBEDKAR ROAD, NEHRU NAGAR, GAZIABAD UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0000095 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 1056 (Under Registration - 1 ) → 1056 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 1055 (Under Registration - 0 ) → 1056 (Under Registration - 1 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 1055 (Under Registration - 1 ) → 1055 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE
Is UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE RERA registered?
Yes. UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE is registered with UPRERA under registration number UPRERAPRJ250078, registered on 1 Oct 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE been completed?
UPRERA still lists UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE as Registered, so it is not shown as completed here. A completion certificate dated 29 Dec 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE?
Uppal Chadha Hi-Tech Developers Pvt. Ltd. is the promoter entity that filed UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM5538). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE located?
UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE?
The unit plan filed with UPRERA lists SHOP, 4 BHK and 5 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE?
The approved unit plan filed with UPRERA runs from 14 to 217 m² of carpet area (about 152 to 2,334 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE?
The approved unit plan describes 2 blocks and 148 units of which 130 are homes and 18 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is UCHDPL-VERIDIA-5-OAKWOOD ENCLAVE?
About 63 units per acre: 148 planned units across 2.34 acres (9,472 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗