URBAN HOMES PHASE 1D

UPRERARegistered

URBAN HOMES PHASE 1D is a RERA-registered commercial project by UH REALCON PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ2347). Registered with a completion deadline of 19 Oct 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ2347
Project categoryCommercial
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start21 May 2014
Original start21 May 2014
Project duration101 months
AddressSHAHPUR BAMHETTA, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address11, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    658/ZONE-5/2013-14 AND 605/MP/2014

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jul 2017
Original completion20 Apr 2022
Revised completion19 Oct 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary27 Sept 2022
Registration fee₹4,180
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors30 · 1 · 3 (units from plan)
Homes · commercial units0 · 30 (shops and offices filed in the same plan)
ConfigurationUnitsCarpet area
SHOP308-14
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
COMMERCIAL · SHOP3308-14
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
N + U DESIGN STUDIO
License CA/2006/37536
A-243, Okhla Industrial Area, Phase - I, New Delhi-110020
Engineer
KEEN ASSOCIATES PRIVATE LIMITED
FIRST FLOOR, H-53, SECTOR-63, NOIDA, UP
Contractor
PROGRESSIVE BUILDCON PRIVATE LIMITED
1401, HEMKUNT CHAMBERS, NEHRU PLACE, NEW DELHI-110
Sr.Development work declared to RERA
1Demarcation of Plots
Enclosed with boundary wall
2Boundary Wall
Combination of Brick work/Plaster
3Road Work
Road pattern is provided in such a way that approach to the towers is motorable and section consists of Subgrade prepration with 1 layer GSB and 1 layer of WMM & black top/Cement Concrete
4Footpaths
N.A.
5Water Supply Including Drinking Water Facilities
System for drinking water is ground water and provided thru Underground/overhead Water tank
6Sewer System
Sewerage is collected through sewage lines upto the common STP established for the project and after treatment the sludge and treated water obtained shall be used in green areas like gardens,parks,green landscapes
7Drain
Rain water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to common rain harvesting pits.
8Parks
There is no park,however provision of green area for entire project
9Tree Planting
Planned trees are provided along the boundarywall
10Design For Electric Supply Including Street Lighting
Electrical connection for the project from PVVNL or its Licenscee/Sub-Licenscee and connection will be provided to customers thru prepaid meter and proportinate electricity infrastructure cost including feeder construction expenses,substations/panels/transformers/other equipments /expenses,cabling expenses,system loading charges ,security charges etc as applicable and further subject to regular payments of fixed elcectricity charges,usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/levy as applicable and demanded from time to time
11Community Buildings
N.A.
12Treatment and Disposal System of Sewage and Sullage water
Common STP of the project provided for treating sewerage and the treated Sludge/water is being used for green areas
13Solid Waste Management And Disposal System
N.A.
14Water Conservation System
Common Underground recharge pits with perforated filter media used for rain water harvesting provided
15Energy Management System Including Use of Renewable Energy
N.A.
16Fire Protection And Fire Safety System
Vertical risers with FHC shaft with terrace Pump to be done.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NIL
18Emergency Evacuation Services
N.A.
19Other Miscellaneous Work
N.A.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1MORES TECHNO PRIVATE LIMITEDUPRERAAGT25307
2UNITY INFRATECHUPRERAAGT25659
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 20 May 2019. 1 of them carries a revalidation.

Sanctioned by Ghaziabad Development Authority · 209 sqm of land · an approved plan of 1 block and 30 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
658/ZONE-5/2013-14 AND 605/MP/201421 May 201420 May 201919 May 202220 Apr 2022—
658/ZONE-5/2013-14 AND 605/MP/201421 May 201420 May 201919 May 202220 Apr 202221 May 2014
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 19 Oct 2022.

#Granted fromExtended uptoNote
120 Apr 202219 Oct 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

40 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2377, 2378, 2380, 2381, 2382, 2406, 2407, 2410, 24208.781 SQ. MTR.—
23751875Khasra
23777210Khasra
23782780Khasra
23802843Khasra
23813031Khasra
23821338Khasra
24061648Khasra
24073040Khasra
24103650Khasra
24112660Khasra
24221015Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 9 May 2014.

Registry no.DateTypeArea
34949 May 2014Own—
429517 Jul 2017Own—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4295
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 3494
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old27 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old27 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old27 Jul 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old27 Jul 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old27 Jul 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old27 Jul 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old27 Jul 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old27 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old27 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterThe main source of drinking water will be ground w
Fire safety (as filed with RERA)The Fire Fighting System and Fire Escapes Staircas
Health serviceSewerage Treatment Plant (STP) will be established in the Project. The household sewage will be collected through sewage lines up to the STP. The sewage will be treated in STP before discharging the sludge and treated water obtained from STP will be used in green areas like gardens, parks, green landscapes etc.
Renewable energyNIL

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUH REALCON PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM1356
PANAABCE7745C
CIN / TANU45400DL2007PTC163159
Name of chairmanMRS. UMA AGARWAL, MR.BIR SINGH PUNDIR
Registered address11, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
UH REALCON PRIVATE LIMITEDBankBANK OF INDIABranchPREET VIHAR MID CORPORATE BRANCHA/C no.IFSCBKID0006067
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about URBAN HOMES PHASE 1D

Is URBAN HOMES PHASE 1D RERA registered?

Yes. URBAN HOMES PHASE 1D is registered with UPRERA under registration number UPRERAPRJ2347, registered on 27 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has URBAN HOMES PHASE 1D been completed?

UPRERA still lists URBAN HOMES PHASE 1D as Registered, so it is not shown as completed here. A completion certificate dated 27 Sept 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of URBAN HOMES PHASE 1D?

UH REALCON PRIVATE LIMITED is the promoter entity that filed URBAN HOMES PHASE 1D with UPRERA (promoter RERA ID UPRERAPRM1356). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted URBAN HOMES PHASE 1D more time to complete?

UPRERA's record carries 1 completion extension for URBAN HOMES PHASE 1D, the latest running to 19 Oct 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does URBAN HOMES PHASE 1D have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is URBAN HOMES PHASE 1D located?

URBAN HOMES PHASE 1D is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in URBAN HOMES PHASE 1D?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in URBAN HOMES PHASE 1D?

The approved unit plan filed with UPRERA runs from 8 to 14 m² of carpet area (about 88 to 149 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in URBAN HOMES PHASE 1D?

The approved unit plan describes 1 block and 30 units of which 0 are homes and 30 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is URBAN HOMES PHASE 1D?

About 581 units per acre: 30 planned units across 0.05 acres (209 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗