Vashishth Kunj Phase-1 is a RERA-registered residential project by Ayodhya Faizabad Development Authority in Lucknow Ayodhya road, Ayodhya (RERA ID UPRERAPRJ207195). Registered with a completion deadline of 22 Oct 2029.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ207195 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ayodhya(Faizabad) Development Authority |
| Proposed start | 23 Oct 2024 |
| Project duration | 60 months |
| Address | Ferozepur Uperhar, Lucknow Ayodhya road, Sohawal **, Ayodhya |
| Tehsil | Sohawal ** |
| Applicant type | Competent authority |
| Applicant address | Civil Lines, Chaudah Kosi Parikrama Marg, Ayodhya 224001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
4576
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 26 Nov 2024 |
| Original completion | 22 Oct 2029 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹13,15,500 |
| Sanctioning authority | Ayodhya(Faizabad) Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The demarcation of plots on site is intended to be executed by utilizing adjacent featured such as drains, boundary walls, footpaths, etc. If necessary, pucca brick markings will be done for the same. |
| 2 | Boundary Wall The proposed project includes the construction of a 2.25 metre high boundary walls. The tender is already floated for the same. |
| 3 | Road Work The roads are designed to accomodate the neighborhood traffic. All project roads are planned to be bituminous with specification comprising layers of earthwork, Granular sub base (GSB), wet mix macadam (WMM) and Bituminous concrete (BC) on top. Road safety measures such as medians, cat eyes, rumbling strips, etc, will be incorporated. |
| 4 | Footpaths Footpaths shall be developed with stamped concrete on top of a cement concrete layer laid over lean concrete along with use of precast kerb stones for the edges. |
| 5 | Water Supply Including Drinking Water Facilities The proposed water supply for the neighborhood is intended to be derived from borewells. Following interrimittent storage in underground tanks and necessary treatment, the water will be further stored and distributed through two overhead water tanks, each with a capacity of 3.5 lakh litres, utlizing gravity flow via underground pipes. Moreover dedicated boreholes shall be constructed to supply water to various facilities and the health center. |
| 6 | Sewer System The neighborhood is planned to incorporate underground RCC Hume pipes for the effective disposal of sewage. The sewage will undergo treatment in a STP. and the treated water will be repurposed for horticultural purposes. Any surplus water after tertiary treatment shall be discharged into a nearby drain. The concept of "Self cleansing velocity" in the sewer system has been implemented to prevent the deposition of suspended solids. In order to mitigate the need for deeper excavation and to control overall cost, the selected velocities adhere to the specified limited outlined in the "Manual on sewerage and sewage treatment" . |
| 7 | Drain The neighborhood is designed to integrate underground closed drains, with the inclusion of gully traps for efficient water drainage. The stromwater accumulated will be directed to recharges pits within a network to facilitate groundwater replenishment. Any surplus rainwater will be directed to gully traps, subsequently flowing towards an adjacent canal and/or drain for final disposal. |
| 8 | Parks The parks shall be landscaped with local trees, shrubs, ground covers and turfs. Additionally these parks shall include gym and play equipment to cater the clusters. |
| 9 | Tree Planting Native species of trees shall be planted along roads as per the road design, in addition to being planted in parks and green areas. |
| 10 | Design For Electric Supply Including Street Lighting The neighborhoods electrical infrastructure proposes an underground distribution network designed for a load of 9.92 MVA, with a 33 KV substation distributing power through eight 630 KVA transformers. Each group Housing/ Commercial plot will feature an 11 KV Ring main unit (RMU) for further distribution. Substations and DG sets will be part of respective areas while meters provided by authorities will manage consumption charges paid directly by end users. The electrical infrastructure aligns with authorities standards and after installation, it will be handed over to the Authority. Feeder pillars, fed by the USS will distribute power to plots using ground laid LT cables. Plots wont have standby power, but common services will have DG power but common services will have DG power back up. Group housing and commercial areas will feature their own DG backup |
| 11 | Community Buildings Community buildings such as community centres, police stations, electric substations, inter colleges, high schools, junior high schools, primary schools and nursery schools are proposed based on the population density |
| 12 | Treatment and Disposal System of Sewage and Sullage water A STP with a capacity of 2 MLD is proposed for the tertiary level treatment of sewage. Th treated water shall be utlized for hotricultural purposes, while any escess water will be discharged to nearby drain |
| 13 | Solid Waste Management And Disposal System A decentralised solid waste collection system is proposed across the entire neighborhood. A solid waste recycling center is planned to segregate and recycle various type of solid waste using the best practices |
| 14 | Water Conservation System proposed in the neigborhood, incorporating strategically placed rainwater harvesting pits in green areas. These pits are designed to facilitate the recharge of rainwater into the ground |
| 15 | Energy Management System Including Use of Renewable Energy The implementation of solar street lights is proposed in strategic areas within the neighborhood. To optimize the energy management, best practices will be adopted including automatic activation of lights at the appropriate evening time. Additionally measures such as a 50 reduction of lights after 12 AM, and a further 25 percent reduction with lights turned off at 4AM are planned. |
| 16 | Fire Protection And Fire Safety System Fire hydrants are proposed to be strategically located along 100mm dia water drains subject to necessary approval from the relevant authorities. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Amenities including public health services- as per the population density various public amenities including social infrastructure are proposed. These include community centre, primary health centre, solid waste recycling centre, etc. |
| 18 | Emergency Evacuation Services Emergency evacuation will be facilitated through State Disaster Response force (SDRF) and National Disaster Response force (NDRF) protocols. Properly planned access routes with appropriate widths and open spaces are incorporated to facilitate emergency evacuation if necessary |
| 19 | Other Miscellaneous Work A CCTV network along with security lighting is proposed on major roads and parks throughout the neighborhood to create a secure environment. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Oct 2029.
Sanctioned by Ayodhya(Faizabad) Development Authority · 2,62,014 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 4576 | 23 Oct 2024 | 22 Oct 2029 | 22 Oct 2032 | 22 Oct 2029 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
48 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 138 | 0.2130 | Khasra |
| 123 | .1010 | Khasra |
| 146 | 2670 | Khasra |
| 161, 107 | 2110 | Khasra |
| 208 | 1850 | Khasra |
| 209 | 146 | Khasra |
| 141 | 1860 | Khasra |
| 255 | 4510 | Khasra |
| 107,161,83,236,258,130,277,124,162 | 7280 | Khasra |
| 95, 46A, 127, 112, 133 | 4062 | Khasra |
| 134, 248, 249, 145, 257, 100, 170, 107, 161, 45, | 8763 | Khasra |
| 43G, 133, 140, 155, 112, 133, 158, 160, 124A, 215, 215A, 271, 43G, 253, 244,245, | 14731 | Khasra |
| 209, 44, 79, 80, 124K, 257, 40, 42, 83, 104, 168, 124A, 215K, 215A, | 14522 | Khasra |
| 169, 94, 73, 213, 124Kh, 162M, 96M,97M, 137, 46K, 153M, | 14428 | Khasra |
| 46K, 170, 153M, 83, 256, 73,76, 78, 220, 241, 251, | 5866 | Khasra |
| 169, 45, 73,76, 254, 105, 238, 240, 276, 256, 103, | 17022 | Khasra |
| 101, 128, 45, 144, 248, 272, 105, 218, 109, 216, 240, 238, 274, | 19085 | Khasra |
| 234, 155, 78, 45, 180, 244, 273, 253, 114, 218, 109, 216, 117, 256, 92, 108, 101, | 16074 | Khasra |
| 82, 131, 110, 256, 73,74, 75, 124,162, 92,108, 81, 116, 89, 90, 87, 235, 224, | 32881 | Khasra |
| 124, 162, 84, 85, 86, 104, 167, 130, 119, 120, 121, 101, 257, 232M, | 11441 | Khasra |
| 142, 143, 113, 231, 77, 73, 78, 125, 126, 136, , 96, 97, 98, 258, 118, 270, 210, 211, | 17838 | Khasra |
| 73, 74, 75, 125, 126, 136, 217, 241, | 4351 | Khasra |
| 95, 256, 279, 84, 85, 86, 282, 283, 284, 211, 250, 220, | 24216 | Khasra |
| Registry document · IN-UP11287207509242V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP11281984996965V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP11290926977506V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP12457207820409V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP12348281097641V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP12300664903900V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-10446974194981V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP13135956161481V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP13629072765647V, IN-UP12317355500581V, IN-UP13632351504525V, IN-UP13143106048950V, IN-UP1314106 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP14739066476723V, IN-UP15683349019873V, IN-UP15726382455943V, IN-UP15776840347178V, The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP17187757305583V; IN-UP17309359667366V; IN-UP17169815073426V; IN-UP15087753636213V; IN-UP1727138 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP18496158671854V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP19567364532058V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP20663831385336V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP21994785432791V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP24241166189696V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP27092762243038V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP28807536162300V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP31327869891388V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP35111129429992V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP41092056052032V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP50133181057727V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP56739984633709V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 379 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP97000565021587V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1353 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 28 Oct 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 22 Feb 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Feb 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Nov 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Dec 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 14 Nov 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 17 Dec 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Dec 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 19 Nov 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 16 Nov 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 5 Nov 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Nov 2024 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 21 Dec 2023 ↗ |
Quarterly progress reports
1 filed report
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
1 quarterly progress report is on file with UPRERA, for 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q2 | 9.78% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Ayodhya Faizabad Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM18932 |
| PAN | AAALA0206C |
| CIN / TAN | LKNA05474A |
| Registered address | Civil Lines, Chaudah Kosi Parikrama Marg, Ayodhya 224001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ayodhya
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | ADA COLLECTION AC VASHISHTH KUNJ PHASE -1BankHDFC Bank Ltd.BranchRam Path AyodhyaBranch addressCP-05 Awas Vikas Colony Awadhpuri Yojna Ram Path Ayodhya (U.P.) Pin-224001Branch districtAyodhya, Uttar PradeshA/C no.IFSCHDFC0009505Branch emailambuj.singh@hdfcbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | ADA SEPARATE AC VASHISHTH KUNJ PHASE -1BankHDFC Bank Ltd.BranchRam Path AyodhyaBranch addressCP-05 Awas Vikas Colony Awadhpuri Yojna Ram Path Ayodhya (U.P.) Pin-224001Branch districtAyodhya, Uttar PradeshA/C no.IFSCHDFC0009505 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | ADA TRANSACTION AC VASHISHTH KUNJ PHASE -1BankHDFC Bank Ltd.BranchRam Path AyodhyaBranch addressCP-05 Awas Vikas Colony Awadhpuri Yojna Ram Path Ayodhya (U.P.) Pin-224001Branch districtAyodhya, Uttar PradeshA/C no.IFSCHDFC0009505 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Vashishth Kunj Phase-1
Is Vashishth Kunj Phase-1 RERA registered?
Yes. Vashishth Kunj Phase-1 is registered with UPRERA under registration number UPRERAPRJ207195, registered on 26 Nov 2024. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Vashishth Kunj Phase-1?
The completion date filed with UPRERA is 22 Oct 2029. No completion certificate is on record yet.
Who is the builder of Vashishth Kunj Phase-1?
Ayodhya Faizabad Development Authority is the promoter entity that filed Vashishth Kunj Phase-1 with UPRERA (promoter RERA ID UPRERAPRM18932). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Vashishth Kunj Phase-1 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Vashishth Kunj Phase-1 located?
Vashishth Kunj Phase-1 is registered in Lucknow Ayodhya road, Ayodhya, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗