Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya.
Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya. is a RERA-registered mixed project by U.P. Awas Evam Vikas Parishad in Uttar Pradesh (RERA ID UPRERAPRJ755836). Registered with a completion deadline of 30 Nov 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ755836 |
| Project category | Mixed |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Jan 2024 |
| Project duration | 59 months |
| Address | Faizabad |
| Tehsil | Faizabad |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2409/Ayodhya/03/544
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Oct 2023 |
| Original completion | 30 Nov 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹14,99,250 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Approved Plan. The Plot shall be demarcated by means of T at junctions. |
| 2 | Boundary Wall Parishad will not provide any Boundary wall to any allottee . To be built by the allottee concern in line with the Bhawan Nirman Upavidhi. |
| 3 | Road Work As Per specification of UP Avas Evam Vikas Parishad (Chief Engineer Office Order No. 685/M-4/2017 Dt. 19.03.2017 and others). Work shall be carried out as per UP Public Works Department Specifications. |
| 4 | Footpaths As Per specification of UP Avas Evam Vikas Parishad and in line with approved map. (Chief Engineer Office Order No. 685/M-4/2017 Dt. 19.03.2017 and Others). Work shall be carried out as per UP Public Works department Specifications. |
| 5 | Water Supply Including Drinking Water Facilities Provide/ shall be provided as per norms and specification of UP Jal Nigam. The network consist of trunk water line laid in trunk Road Cross Section with OHT UGR. distribution network shall be laid on sectorial roads. House connection shall be provided by means of ferule /Tee. |
| 6 | Sewer System Provided. The under ground sewer network with manholes and chambers shall be provide in accordance with UP Jal Nigam Specification and Chief Engineer Order No. 912/M-1/94 Dt. 20.10.2005. |
| 7 | Drain Well designed and Constructed Covered / Open drainage network shall be provided. Drain shall be of type C-1, C-2, C-3 etc. The design shall be in line with the guidelines of Drainage Manual of UP Jal Nigam / Govt. of India. |
| 8 | Parks Well designed and developed parks / Green belts with decorative boundary wall and gates shall be provided. The construction and development shall be in line with office order no. -878/ISO |
| 9 | Tree Planting The spaces marked as park/Green belt shall be well design and developed. Necessary sampling shall be planted. |
| 10 | Design For Electric Supply Including Street Lighting Necessary load of 233 MVA (Multi point) has been sanctioned from UPPCL wide letter no. 1117 dated 26-11-2022. Well designed electrical distribution system shall be constructed in line with the specifications of UPPCL and National Electricity Code. All roads to be illuminated by means of street lights |
| 11 | Community Buildings The plot shown as Facility in the layout shall be used to construct the community facility. The Community centre shall be built by Parishad. |
| 12 | Treatment and Disposal System of Sewage and Sullage water A well designed sewerage network ( Separate System) in line with the specifications of UP Jal Nigam / CPHEEO Govt of India. The effluent shall be treated in Common STP (shall be constructed). The Treated effluent shall be discharged in line with EPA. A part of Treated effluent shall be re circulated for use in gardening. |
| 13 | Solid Waste Management And Disposal System Door to Door collection , segregation and disposal of solid waste shall be adopted. An external agency expert in carrying out this job shall be deployed for this. |
| 14 | Water Conservation System Treated effluent from STP is being recirculated for gardening use so that the demand for potable water is reduced. The construction of different type of buildings to have water recharging facility in line to Building by laws. |
| 15 | Energy Management System Including Use of Renewable Energy The different buildings constructed on the plots of township shall be encouraged to promote the use of solar energy in line with the building bylaws and shall be compliant to ECBC norms. |
| 16 | Fire Protection And Fire Safety System The well designed and constructed water supply network shall have integrated fire fighting system for the entire township. The same shall be constructed by the promoter. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services The integrated township shall have all kind of land uses such as residential, commercial, educational, institutional, hospital and mutts etc to have a complete socially sustainable township. |
| 18 | Emergency Evacuation Services The township is part of District Ayodhya Disaster Mitigation Plan. The Fire Department of Govt of UP shall look after this. The layout is open towards all directions so that easy evacuation takes place during urgency / emergency. |
| 19 | Other Miscellaneous Work The promoter shall create a artificial reservoir and channel system in the form of Blue and Green infra as shown in layout to add special spiritual character to scheme in line with the theme. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 4 Oct 2028.
Sanctioned by U.P. Awas Evam Vikas Parishad · 1,98,819 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 2409/Ayodhya/03/544 | 5 Oct 2023 | 4 Oct 2028 | 3 Oct 2030 | 30 Nov 2028 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
38 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 341,342,343,345-347, 349-374, 406, 410-456, 595, 600-629, 634-639, 663, 618/1375, 636/1376, 636/1381, 636/1400 | 402764.00 | Khasra |
| Allotment letter from the authority · 1022/lac/hq/17.1.2023 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 12 Oct 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 12 Oct 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 12 Oct 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 12 Oct 2023 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 12 Oct 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 20 Oct 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 20 Oct 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 20 Oct 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 12 Oct 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 20 Oct 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 12 Oct 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 12 Oct 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Oct 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 12 Oct 2023 ↗ |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 26.3% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 38.77% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 54.87% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 68.18% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP COLLECTION AC FOR PLOTTED DEVELOPMENT OF SECTOR 8A AND 9A BHUMI VIKAS GRIH STHAN EVAM BAZAR YOJNA, AYODHYA.BankSTATE BANK OF INDIABranchFAIZABADBranch addressMAIN, BRANCH FAIZABADBranch districtFaizabad, Uttar PradeshA/C no.IFSCSBIN0000075 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP SEPARATE BANK AC FOR PLOTTED DEVELOPMENT OF SECTOR 8A AND 9A BHUMI VIKAS GRIH STHAN EVEM BAZAR YOJNA, AYODHYA.BankSTATE BANK OF INDIABranchFAIZABADBranch addressMAIN BRANCH FAIZABADBranch districtFaizabad, Uttar PradeshA/C no.IFSCSBIN0000075 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP-RERA TXN AC FOR PLOTTED DEVELOPMENT OF SECTOR 8A AND 9A BHUMI VIKAS GRIH STHAN EVAM BAZAR YOJNA, AYODHYA.BankSTATE BANK OF INDIABranchFAIZABADBranch addressMAIN BRANCH FAIZABADBranch districtFaizabad, Uttar PradeshA/C no.IFSCSBIN0000075 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya.
Is Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya. RERA registered?
Yes. Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya. is registered with UPRERA under registration number UPRERAPRJ755836, registered on 21 Oct 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya.?
The completion date filed with UPRERA is 30 Nov 2028. No completion certificate is on record yet.
Who is the builder of Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya.?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya. with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Plotted Development for 52 Nos. Mutt, State and International Bhawans, Group Housing, Multi-Unit Houses, Institutional, School, Nursing Home , Commercial and Warehouse/ Cottage Industry , Plots in the sector- 8A, 9A and 9B in Green Field Township, Ayodhya. have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗