Residential Plots (314 Nos) in Sector 8C GFT Ayodhya is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Sector-8C, Ayodhya (RERA ID UPRERAPRJ823517). Registered with a completion deadline of 24 Mar 2030.
RERA status as reported: Registered.Construction progress
Construction stayed at 0% across 4 consecutive filed quarters (Jul–Sep 2025 to Apr–Jun 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ823517 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 May 2025 |
| Project duration | 59 months |
| Address | Bhoomi Vikas Grihsthan Evam Bazar Yojna, Sector-8C, Sadar(Faizabad), Ayodhya |
| Tehsil | Sadar(Faizabad) |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
APD/U-3/PART LOP SEC-8C/G.F.T./AYO/CD AYO-01/SE-AYO/RERA-11/131/H.C.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 12 Jun 2025 |
| Original completion | 24 Mar 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹4,36,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Approved Plan. |
| 2 | Boundary Wall Not Provided |
| 3 | Road Work Road shall be constructed as per specification U.P. Avas Evam Vikas Parishad and U.P. PWD |
| 4 | Footpaths Footpath will be constructed as per road Cross section approved from competant Authority |
| 5 | Water Supply Including Drinking Water Facilities It Shall be provided in accordance with U.P. Jalnigam specifications. The Distribution netwrok consist of sectorial water line connected to O.H.T./U.G.R. |
| 6 | Sewer System The Underground sewer network with mainhols and chambers shall be provided in accordance with U.P. Jalnigam specifications |
| 7 | Drain Drainage Network shall be provided in line with the guidelines of drainage manual of U.P. Jalnigam/ Government of India. |
| 8 | Parks Parks shall be developed as per U.P. Avas Evam Vikas Parishad specifications. |
| 9 | Tree Planting Will be done in parks and along the roads. |
| 10 | Design For Electric Supply Including Street Lighting Well design Electrical distribution network will be provided as per the load calculation in accordence with UPPCL and National Electricity Code. Streel Light will be provided. |
| 11 | Community Buildings Not applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewer network will be provided and the effluent will be treated in common STP proposed for the whole scheme. |
| 13 | Solid Waste Management And Disposal System Will be done in accordence to solid waste management manual/Government Orders. |
| 14 | Water Conservation System Not applicable |
| 15 | Energy Management System Including Use of Renewable Energy Not applicable |
| 16 | Fire Protection And Fire Safety System Integrated fire fighiting system for the entire township. the same shall be contstructed by the pramoter |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services The Integrated township shall have all kind of land use such as rasidential, commercial, Educational, Institutional, Hospital and Mutts etc. to have a complete socially sustainable township. |
| 18 | Emergency Evacuation Services The township is part of Distt. Ayodhya Disaster mitigation plan. The Fire Department of Government of U.P. shall look after this. The lay out is opened towards all direction so that easy evacuation take place during urgency/ Emergencty. |
| 19 | Other Miscellaneous Work Not applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 24 Mar 2030.
Sanctioned by U.P. Awas Evam Vikas Parishad · 86,286 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| APD/U-3/PART LOP SEC-8C/G.F.T./AYO/CD AYO-01/SE-AYO/RERA-11/131/H.C. | 25 Mar 2025 | 24 Mar 2030 | 24 Mar 2032 | 24 Mar 2030 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 587, 640, 650 to 659, 665 to 674, 674/1405, 675 to 699, 702 to 705, 708 and 709 | 86286 | Khasra |
| Khatauni extract · 1430-1435 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Allotment letter from the authority · 261/2023 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 155/LAC/HQ The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · 13443 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 26 Apr 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 27 Mar 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 27 Mar 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 27 Mar 2025 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 27 Mar 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 27 Mar 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 27 Mar 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Mar 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 27 Mar 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 26 May 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 8 Apr 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 8 Apr 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 8 Apr 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 26 May 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 27 Mar 2025 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ayodhya
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP Collection Account for Residential Plots (314 Nos) in Sector 8C GFT AyodhyaBankICICI Bank LimitedBranchNiyawah FaizabadBranch address19, 22 Nahar Bagh, Niyawah FaizabadBranch districtAyodhyaA/C no.IFSCICIC0000290Branch emailAshutosh.s@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP-Separate Account for Residential Plots (314 Nos) in Sector 8C GFT, AyodhyaBankICICI Bank LimitedBranchNiyawah FaizabadBranch address19, 22 Nahar Bagh Niyawah Faizabad Uttar Pradesh 224001Branch districtAyodhya, Uttar PradeshA/C no.IFSCICICI0000290 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP-Transection Account for Residential Plots (314 Nos) in Sector 8C, GFT AyodhyaBankICICI Bank LimitedBranchNiyawah FaizabadBranch address19, 22 Nahar Bagh Niyawah Faizabad Uttar Pradesh 224001Branch districtAyodhya, Uttar PradeshA/C no.IFSCICICI0000290 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Residential Plots (314 Nos) in Sector 8C GFT Ayodhya
Is Residential Plots (314 Nos) in Sector 8C GFT Ayodhya RERA registered?
Yes. Residential Plots (314 Nos) in Sector 8C GFT Ayodhya is registered with UPRERA under registration number UPRERAPRJ823517, registered on 12 Jun 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Residential Plots (314 Nos) in Sector 8C GFT Ayodhya?
The completion date filed with UPRERA is 24 Mar 2030. No completion certificate is on record yet.
Who is the builder of Residential Plots (314 Nos) in Sector 8C GFT Ayodhya?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Residential Plots (314 Nos) in Sector 8C GFT Ayodhya with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Residential Plots (314 Nos) in Sector 8C GFT Ayodhya have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Residential Plots (314 Nos) in Sector 8C GFT Ayodhya located?
Residential Plots (314 Nos) in Sector 8C GFT Ayodhya is registered in Sector-8C, Ayodhya, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗