VASUNDHARA SMART CITY PHASE-III

UPRERARegistered

VASUNDHARA SMART CITY PHASE-III is a RERA-registered residential project by VASUNDHARA INFRA BUILD PVT.LTD. in SUZROO, RAJWAHA ROAD MUZAFFAR NAGAR, Muzaffarnagar (RERA ID UPRERAPRJ904487). Registered with a completion deadline of 7 Jun 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ904487
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMuzaffarnagar Development Authority
Proposed start1 Apr 2026
Project duration27 months
AddressKHASRA NO. 2316, SUZROO, RAJWAHA ROAD MUZAFFAR NAGAR, Muzaffarnagar, Muzaffarnagar
TehsilMuzaffarnagar
Applicant typeCompany
Applicant addressVASUNDHARA RESIDENCY,PARIKARMA MARG NEAR SHRI RAM COLLEGE,ALMASPUR,MUZAFFARNAGAR U.P. PIN. NO. 251001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    123/MDA/TALPAT/2023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Jun 2026
Original completion7 Jun 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,30,000
Sanctioning authorityMuzaffarnagar Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SIDDHARTH JAIN
License CA/2018/93221
60/40, LAXMAN VIHAR, MUZAFFARNAGAR (UP)
Engineer
ASHRAF ALI
B-6, B-7, 1ST FLOOR, AISH PLAZA, MEDICAL ROAD, ALIGARH-202001
Contractor
VASUNDHARA INFRA BUILD PVT.LTD
VASUNDHARA RESIDENCY, PARIARMA MARG, MUZAFFARNAGAR, UTTAR PRADESH
Sr.Development work declared to RERA
1Demarcation of Plots
PROPOSED GROUP HOUSING RESIDENTIAL PLOTTING PROJECT OVER AN AREA MEASURING 24905 SQM AT SUZROO RAJWAHA ROAD MUZAFFARNAGAR PLOT IS WELL DEMARCATED AT THE SITE.
2Boundary Wall
2 METER HIGH AND 9" THICK BRICK WALL (230MM) ALONG TWO SIDES OF THE PROJECT AND REST TWO ROAD SIDE BOUNDARY WALLS/RAILINGS SHALL BE AS PER DESING.
3Road Work
IN THIS PROJECT ROADS WITH TRIMAX/CONCRETE PAVERS AS PER DESIGN AND LAID OVER COMPACTED EARTH GRANULAR SUBBASE (GSB) WBM PCC (1 4 8) AND SAND BED WIDE ROADS 9 MTR .
4Footpaths
IN THIS PROJECT THERE FOOTHPATHS WILL BE MADE OF INTERLOCKING CONCRETE PAVERS.
5Water Supply Including Drinking Water Facilities
WE WILL FILL THE 2 UNDERGROUND WATER TANK EACH CAPACITY OF 100 KL THROUGH THE BOREWELL, AND FROM THERE THE 2 OVERHEAD WATER TANKS HAVING CAPACITY OF 100 KL EACH WILL BE FILLED USING PUMPS. WATER SUPPLY TO THE PLOTS WILL BE PROVIDED THROUGH THESE TANKS.
6Sewer System
IN THIS PROJECT AN EFFICIENT DESIGNED SEWERAGE SYSTEM CONNECTED TO STP (85KLD) AND ALL SEWER WATER SHALL GO THE STP (85 KLD) TO BE DEVELOPED ON THIS PROJECT
7Drain
A WELL-DESIGNED SYSTEM OF COVERED AND UNDERGROUND DRAIN MEASURING 200 MM DIAMETER SHALL BE IN PLACE, STROM WATER AND ROOF RAINWATER WILL BE DIVERTED TO RAINWATER HARVESTING ARRANGEMENT AS PER NORMS.
8Parks
AS PER THE SANCTIONED PLAN, THE LAYOUT INCLUDES DESIGNATED GREEN AREAS ON PARK SIDES. WE WILL DEVELOP THE PARKS SITE EXACTLY AS PER SANCTIONED LAYOUT ENSURING ALL GREENS ZONES. THERE IS 2 GREEN PARK MEASURING
9Tree Planting
GREENERY DEVELOPMENT IN THIS PROJECTS IS PROPOSED IN THE PARK. THESE GREEN SPACE ARE PROVIDED WITH THE CREATING HEALTHY AND MODERATE ENVIRONMENT FOR THE RESIDENTS OF PLOTS. TICH PLANTATION KIDS AREA WILL ALSO THERE IN THIS PROJECT. 1 MTR HEIGHT TREE WILL BE LANTED ALONG THE BOUNDARY WALL AND FRONT SIDE GREEN BELT PROVIDED BY MDA WILL ALSO BE DEVELOPED BY US.
10Design For Electric Supply Including Street Lighting
WE WILL DESING AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED TRANSFORMER 11KV/ 433 KV VARIATION , HT PANEL, LT PANEL, FEEDER PILLAR AND DG SET FOR COMMON SERVICE LIE EXTERNAL LIGHTING PUMP ROOM ETC AND LIGHT BACKUP TO PLOTS.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED, ALL SEWERAGE WATER SHALL GO TO THE STP (85 KLD) AND OVERFLOW FROM THE STP (85 KLD) SHALL BE CONNECTED TO THE MUNICIPAL SEWERAGE SYSTEM.
13Solid Waste Management And Disposal System
THE COLLECTION AND OF SOLID WASTE WILL BE MANAGED IN COORDINATION WITH LOCAL MUNICIPAL CORPORATION TO ENSURE PROPER HANDING AS PER MUNICIPAL NORMS, ALL WASTE-MANEGEMENT ACTVITIES WILL FOLLOW THE PROCEDURES AND SCHEDULES PRESCRIBED BY THE LOCAL AUTHORITY.
14Water Conservation System
RECHARGEABLE WELLS AND PITS WILL BE PROVIDED TO FACILITATE EFFICIENT GROUND WATER RECHARGE STROMWATER MANAGEMENT. THESE STRUCTURES WILL BE DEVELOPED AS PER THE APPROVED DESIGH TO ENSURE SUSTAINABLE COMPLIANT WATER-RECHRGE PRACTICES.
15Energy Management System Including Use of Renewable Energy
WE SHALL BE PROVIDING SOLAR PANELS FOR THE STREET LIGHTING AND WATER HEATERS.
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
SUFFICIENT OPEN SPACE PROVIDED IN THIS PROJECT FOR THE GATHERING OF PEOPLE IN EMERGENCY.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 7 Jun 2028.

Sanctioned by Muzaffarnagar Development Authority · 24,905 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
123/MDA/TALPAT/20238 Jun 20237 Jun 20287 Jun 20307 Jun 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
231624905Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 10132
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10134
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10138
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1568
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9700
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9703
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10129
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10130
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10133
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10135
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10136
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10139
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 17041
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · LAND AREA CHART
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · CARTIFIED KHATAUNI
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · CERTIFIED MUTATED KHATAUNI KHASRA 2316 OF ENTIRE PROJECT AREA
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Apr 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Mar 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 Mar 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New23 Apr 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New7 Apr 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New7 Apr 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New7 Apr 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New17 Mar 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New7 Apr 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New1 Jun 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New7 Apr 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New2 Jun 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New25 May 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.

QuarterConstructionCertificates
2026-Q110%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameVASUNDHARA INFRA BUILD PVT.LTD.
RolePromoter · current
RERA IDUPRERAPRM77722
PANAADCV8074B
CIN / TANMRTV02142A
Name of chairmanAMIT KUMAR
Registered addressVASUNDHARA RESIDENCY,PARIKARMA MARG NEAR SHRI RAM COLLEGE,ALMASPUR,MUZAFFARNAGAR U.P. PIN. NO. 251001
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Muzaffarnagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
V.I.B.P.L. COLLECTION A/C VASUNDHARA SMART CITY PHASE-IIIBankSTATE BANK OF INDIABranchSME BRANCHBranch addressJANSATH ROAD, MUZAFFARNAGARBranch districtMuzaffarnagar, Uttar PradeshA/C no.IFSCSBIN0061196Branch emailsbi.61196@sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
V.I.B.P.L. SEPARATE A/C VASUNDHARA SMART CITY PHASE-IIIBankSTATE BANK OF INDIABranchSME BRANCHBranch addressJANSATH ROAD, MUZAFFARNAGARBranch districtMuzaffarnagar, Uttar PradeshA/C no.IFSCSBIN0061196
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
V.I.B.P.L. TRANSACTION A/C VASUNDHARA SMART CIT PHASE-IIIBankSTATE BANK OF INDIABranchSME BRANCHBranch addressJANSATH ROAD, MUZAFFARNAGARBranch districtMuzaffarnagar, Uttar PradeshA/C no.IFSCSBIN0061196
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about VASUNDHARA SMART CITY PHASE-III

Is VASUNDHARA SMART CITY PHASE-III RERA registered?

Yes. VASUNDHARA SMART CITY PHASE-III is registered with UPRERA under registration number UPRERAPRJ904487, registered on 3 Jun 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for VASUNDHARA SMART CITY PHASE-III?

The completion date filed with UPRERA is 7 Jun 2028. No completion certificate is on record yet.

Who is the builder of VASUNDHARA SMART CITY PHASE-III?

VASUNDHARA INFRA BUILD PVT.LTD. is the promoter entity that filed VASUNDHARA SMART CITY PHASE-III with UPRERA (promoter RERA ID UPRERAPRM77722). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does VASUNDHARA SMART CITY PHASE-III have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is VASUNDHARA SMART CITY PHASE-III located?

VASUNDHARA SMART CITY PHASE-III is registered in SUZROO, RAJWAHA ROAD MUZAFFAR NAGAR, Muzaffarnagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗