VASUNDHARA SMART CITY

UPRERARegistered

VASUNDHARA SMART CITY is a RERA-registered residential project by VASUNDHARA INFRA BUILD PVT.LTD. in VILLAGE-SUJROO, RAJWAHA ROAD, Muzaffarnagar (RERA ID UPRERAPRJ634993). Registered with a completion deadline of 7 Jun 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
97%Q3'25
88.23%Q4'25
90.43%Q1'26
91.87%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ634993
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMuzaffarnagar Development Authority
Proposed start1 Dec 2023
Project duration55 months
AddressKHASRA NO 2281(PART), 2283, 2284/2,2301(PART), 2302, 2303, 2305(PART), VILLAGE-SUJROO, RAJWAHA ROAD, Muzaffarnagar, Muzaffarnagar
TehsilMuzaffarnagar
Applicant typeCompany
Applicant addressVASUNDHARA RESIDENCY,PARIKARMA MARG NEAR SHRI RAM COLLEGE,ALMASPUR,MUZAFFARNAGAR U.P. PIN. NO. 251001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    114/MDA/TALPAT/2023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jan 2024
Original completion7 Jun 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,92,000
Sanctioning authorityMuzaffarnagar Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SIDDHARTH JAIN
License CA/2018/193221
283, RAJWAHA ROAD, MUZAFFARNAGAR
Engineer
ASHRAF ALI
B-6, AISH PLAZA, MEDICAL ROAD, ALIGARH
Contractor
MOHD GULSHER
H. NO-94, NYA ZUPURA, MUZZAFFARNAGAR, UP-251002
Sr.Development work declared to RERA
1Demarcation of Plots
DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTION MAP BY MUZZAFFARNAGAR DEVELOPMENT AUTHORITY
2Boundary Wall
BOUNDARY WALL AT SITE BE MADE OF FLY ASH/CLAY BRICKS WITH COULUMN BEAMS STRUCTURE, THE HRIGHT OF THE BOUNDARY WALL WILL BE 6 FEET, PLASTER WILL BE DONE ONBOTH SIDE OF THE BOUNDARY WALL AFTER THAT 2 COAT OF PAINTS WILL BE COATED.
3Road Work
CONCRETE /APEX ROAD WILL BE MADE AT THE SITE, THE VASTE OF THE ROAD WILL BE FILLED BY RED MURAM, AFTER THAT 2LAYER OF AGGREEGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UPTO THE MARK, AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACK AND WHITE APEX ROAD WILL BE 7.5 MTR TO 12 MTR WIDE.
4Footpaths
LAYING OF INTERLOCKING PAVERS OF 40MM OVER WI=ELL COMPACTED SUBGRATE WITH GSB LAYERS.
5Water Supply Including Drinking Water Facilities
FOR WATER SUPPLY WE HAVE A PROVISION OF BOARING WATER SUPPLY PROVISION WILL BE PROVIDEDV VIA SYSTEM OF PUMPS AND PIPES , WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS. THIS WATER WILL BE USED FOR DRINKING AND DAILY USE PURPOSE.
6Sewer System
SEWAGE TREATMENT PLANT WILL BECONSTRUCTION AT SITE. ALL WATER DRAIN WATSTE DRAINS WILLCOME CONNECT IN THE SEWAGE TREATMENT PLANT. THIS WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION.
7Drain
LAYING OF DWC PIPES AND MAKING OF CATCH BASINSOF REQUIRED SIZE EG(450x450mm) IN BRICK MASSONERY WITH MANHOLES COVERS AS PER MEP DESIGNS.
8Parks
LANDSCAPING OF THE PARKS WITH PLANTATION INCLUDING TREES, SHRUBS AND GROUND COVERS AND RECREATIONAL AREAS WITH BENCHES, WALKWAYS ETC.
9Tree Planting
PLANTATION OF VARIOUS TYPES OF TREES AS PER LANDSCAPE CONSULTANT DRAWINGS EG (CHAMPA, DATA PALM ETC), TREE WILL BE PLANTED AROUNF400 IN NUMBERS ALL OVER THE PROJECT AND IN THE GARDEN AS WELL.
10Design For Electric Supply Including Street Lighting
IRON POLS WITH STREE LIGHT WILL BE PLACEDALL OVER THE CAMPUS AND PROPER ELECTRIFICATION WITH TRANSFORMER AND WIRING WILL BE DONE AS SHOWNIN THE LAYOUT , ELECTRIFICATION WILL BE DONE IN ALL DUPLEXES ALSO WITH ISI MARKS, MODULAR SWITCHES WITH PROPER EARTHING ARRANGEMENT.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
TREATMENT AND DISPOSAL SYATEM SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT, IN THOS ALL WATER WILL BE COLLECTED FROM FIFFRENT SOURCES (KITCHEN WATER, BATHROOM WATER USE FOR WASHING CLOTHES ETC) WILL BE COLLECTED AT ONE PLACE AND RECYCLE THE SAME AND WILLBE USED FOR OTHER WORKS LIKE GARDENING, WASHING THE COMMON ARE ETC.
13Solid Waste Management And Disposal System
DESIGNATED AREA FOR COLLECTION AND LOADING OF GARBAGE WITH DUSTBINS HAS BEEN PROVIDED.
14Water Conservation System
INSTALLATION OF RAIN HARVESTING SYSTEM FOR PERCOLATION OF RAINWATERTO MAINTAIN THE LOCAL GROUNF WATER LEVELS AS PER APPROVED NORMS AND MEP DRAWINGS.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
PROVIDING TODDLERS PARK, CHILDREN PLAY STATION, SIT OUT AREA , LUSH GREEN GARDEN.
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 6 Jun 2028.

Sanctioned by Muzaffarnagar Development Authority · 37,335 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
114/MDA/TALPAT/20238 Jun 20236 Jun 20287 Jun 20307 Jun 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

30 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2281 (PART)2905Khasra
2281 PART2905Khasra
22832076Khasra
2283 (PART)2076Khasra
2283 PART2073Khasra
2283 PART8305Khasra
2284/25570Khasra
2301 PART4050Khasra
2301 PART4050Khasra
2302103Khasra
2302 PART, 2303 PART953Khasra
2305 PART15090Khasra
2302 PART, 2303 PART2857Khasra
2305322Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 12872
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12923
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12924
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12972
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13463
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12806
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13446
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12790
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13394
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13457
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13457
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13049
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 2017
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2017
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2017
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2017
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2017
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2017
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2017
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 13485
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · LAND AREA CHART WITH KHASRA 2305 SEPARATE AREA
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New28 Nov 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Oct 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Oct 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Oct 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Oct 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Oct 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Oct 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Oct 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New4 Dec 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Oct 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Oct 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Oct 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New26 Dec 2023 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New13 Dec 2023 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2026-Q2.

QuarterConstructionCertificates
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q297%CA ↗ · Arch ↗ · Eng ↗
2025-Q388.23%CA ↗ · Arch ↗ · Eng ↗
2025-Q490.43%CA ↗ · Arch ↗ · Eng ↗
2026-Q191.87%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameVASUNDHARA INFRA BUILD PVT.LTD.
RolePromoter · current
RERA IDUPRERAPRM77722
PANAADCV8074B
CIN / TANMRTV02142A
Name of chairmanAMIT KUMAR
Registered addressVASUNDHARA RESIDENCY,PARIKARMA MARG NEAR SHRI RAM COLLEGE,ALMASPUR,MUZAFFARNAGAR U.P. PIN. NO. 251001
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Muzaffarnagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
V.I.B.P.L COLL A/C VASUNDHARA SMART CITYBankSTATE BANK OF INDIABranchSBI , MUZAFFARNAGARBranch addressKHASRA NO-904, JANSAT ROAD, MUZFFARNAGARBranch districtMuzaffarnagar, Uttar PradeshA/C no.IFSCSBIN0061196Branch emailSBI61196@SBI.CO.IN
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
V.I.B.P.L. SEP A/C VASUNDHARA SMART CITYBankSTATE BANK OF INDIABranchSBI MUZAFFARNAGARBranch addressKHASRA NO -904, JANSATH ROAD, MUZAFFARNAGARBranch districtMuzaffarnagar, Uttar PradeshA/C no.IFSCSBIN0061196
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
V.I.B.P.L. TRAN A/C VASUNDHARA SMART CITYBankSTATE BANK OF INDIABranchSBI , MUZAFFARNAGARBranch addressKHASRA -904, JANSATH ROAD, MUZAFFARNAGARBranch districtMuzaffarnagar, Uttar PradeshA/C no.IFSCSBIN0061196
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about VASUNDHARA SMART CITY

Is VASUNDHARA SMART CITY RERA registered?

Yes. VASUNDHARA SMART CITY is registered with UPRERA under registration number UPRERAPRJ634993, registered on 27 Jan 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for VASUNDHARA SMART CITY?

The completion date filed with UPRERA is 7 Jun 2028. No completion certificate is on record yet.

Who is the builder of VASUNDHARA SMART CITY?

VASUNDHARA INFRA BUILD PVT.LTD. is the promoter entity that filed VASUNDHARA SMART CITY with UPRERA (promoter RERA ID UPRERAPRM77722). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does VASUNDHARA SMART CITY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is VASUNDHARA SMART CITY located?

VASUNDHARA SMART CITY is registered in VILLAGE-SUJROO, RAJWAHA ROAD, Muzaffarnagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗