ACE TECH is a RERA-registered commercial project by Star Landcraft Private Limited in Sector- Techzone, Gautam Budh Nagar (RERA ID UPRERAPRJ477604). Registered with a completion deadline of 1 Oct 2030.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ477604 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Apr 2026 |
| Project duration | 55 months |
| Address | Plot No. 5A, Sector- Techzone, Greater Noida, Uttar Pradesh, Sector- Techzone, Dadri, Gautam Budh Nagar |
| Tehsil | Dadri |
| Applicant type | Company |
| Applicant address | PLOT NO. 01/B SECTOR -126 NOIDA U.P-201303 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
SM-28-Jul-2025-25753
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 9 Apr 2026 |
| Original completion | 1 Oct 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹4,96,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- OTHER1,000 93%
- SHOP77 7%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 1,000 | 41-418 |
| SHOP | 77 | 13-177 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| COMMERCIAL_BLOCK-A · SHOP | 3 | 68 | 13-111 |
| COMMERCIAL_BLOCK-B · SHOP | 2 | 8 | 18-177 |
| TOWER-1 · SHOP, OTHER | 22 | 553 | 41-218 |
| TOWER-2 · OTHER | 25 | 448 | 42-418 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The plot having 48,567 sq. m. plot area, will be demarcated as per the sanction and survey drawing. |
| 2 | Boundary Wall A boundary wall ( approx. 806.7 m running length ) of RCC/Brick with plaster and railing will be prepared. |
| 3 | Road Work 7.5m wide access road to all towers and commercials will be provided and the road will be designed to take up live load as per the approvals and NBC. |
| 4 | Footpaths Designed footpath in the plaza as walkways. |
| 5 | Water Supply Including Drinking Water Facilities Noida Authority shall supply water for the entire society and it shall be treated and pumped to all the buildings.
(2 Raw water tanks of 160 KL each and 2 Treated water tanks of 160 KL each). |
| 6 | Sewer System Centralised STP to treat the sewage, will be designed and provided.
STP capacity 760 KLD. |
| 7 | Drain Rain water drains will be provided as per the design. |
| 8 | Parks Beautiful parks will be made for all the occupants to enjoy. |
| 9 | Tree Planting As per approved building plan, apt no. of trees will be provided. |
| 10 | Design For Electric Supply Including Street Lighting Power supply from Noida electricity board and street lighting as per approved building plan. |
| 11 | Community Buildings Social gathering places are being provided. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralised STP to treat the sewage.
STP capacity 760 KLD. |
| 13 | Solid Waste Management And Disposal System Collection, storage and disposal will be done as per sanctions and NBC. |
| 14 | Water Conservation System Rain water harvesting system is being provided to conserve rain water and dual flush system will be provided with water saving fittings.
10 nos. of RWH pits proposed. |
| 15 | Energy Management System Including Use of Renewable Energy Usage of LED lights will be used all over the project and use of solar lights will also be explored. |
| 16 | Fire Protection And Fire Safety System As per approved building plan we will design best fire protection system consisting of sprinklers, smoke detectors and fire alarm.
2 fire tanks of 435 KL each. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social gathering places are being provided. |
| 18 | Emergency Evacuation Services As per the approved building plan and fire approvals, fire staircases are being provided.
1.5 m and 2m wide fire staircases. |
| 19 | Other Miscellaneous Work As per approved building plans. (3-5 no. of water bodies).
03 nos. 2000 KVA, 05 nos. 1600 KVA . Total of 08 nos. of Transformers. |
Registered agents
13 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | AMAN SHARMA | UPRERAAGT24918 |
| 2 | FIRSTHOME CONSULTING | UPRERAAGT18543 |
| 3 | GROW INFINITY REALTORS | UPRERAAGT23233 |
| 4 | INVESTOXPERT ADVISORS PVT LTD | UPRERAAGT21108 |
| 5 | JOINT BRICKS PROPMART | UPRERAAGT11518 |
| 6 | Kutumb Services | UPRERAAGT13108 |
| 7 | MAYANK | UPRERAAGT15731 |
| 8 | MOHIT GOYAL | UPRERAAGT15259 |
| 9 | MORES TECHNO PRIVATE LIMITED | UPRERAAGT25307 |
| 10 | PC MANTRA INFOSYSTEM PVT. LTD. | UPRERAAGT10580 |
| 11 | SANG INFRATECH PVT. LTD. | UPRERAAGT10024 |
| 12 | Soil Search Infratech Private Limited (formerly known as Proptronix Infratech Private Limited) | UPRERAAGT25555 |
| 13 | URBAN AVENUES LLP | UPRERAAGT10834 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Jan 2031.
Sanctioned by Greater Noida Authority · 48,567 sqm of land · an approved plan of 4 blocks and 1077 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| SM-28-Jul-2025-25753 | 10 Jan 2026 | 9 Jan 2031 | 9 Jan 2033 | 1 Oct 2030 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 5A | 48567 | Plot |
| Lease deed · Bahi No. 1 Jild No. 46869 Page No. 97-144 Serial No. 12255 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Allotment letter from the authority · GN/IT/2024/1449 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Lease deed · 22-01-2026 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 19/03/2026 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 18 Feb 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 Mar 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 19 Feb 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 19 Feb 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 11 Mar 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 11 Mar 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 11 Mar 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 20 Feb 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 20 Feb 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 27 Mar 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 11 Mar 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Mar 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 20 Feb 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 30 Mar 2026 ↗ |
Quarterly progress reports
1 filed report
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
1 quarterly progress report is on file with UPRERA, for 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2026-Q1 | 1% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Star Landcraft Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM140560 |
| PAN | AATCS5903J |
| CIN / TAN | MRTS10132D |
| Name of chairman | AJAY KUMAR |
| Registered address | PLOT NO. 01/B SECTOR -126 NOIDA U.P-201303 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | STAR LANDCRAFT PVT. LTD COLLECTION ACCOUNT FOR ACE TECHBankICICI BANKBranchSECTOR-27Branch addressSHOP NO. A,B,C,D, M14&15 GA, E-331, SECTOR-27, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICICI0005344Branch emailyogesh.narang@icicbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | STAR LANDCRAFT PVT. LTD. SEPARATE BANK ACCOUNT FOR ACE TECHBankICICI BANKBranchSECTOR-27Branch addressSHOP NO. A,B,C,D,M14-15 GA, E-331, SECTOR-27, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICICI0005344 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | STAR LANDCRAFT PVT. LTD. RERA TRANSACTION ACOOUNT FOR ACE TECHBankICICI BANKBranchSECTOR-27Branch addressSHOP NO. A,B,C,D,M14-15 GA, E-331, SECTOR-27, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICICI0005344 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about ACE TECH
Is ACE TECH RERA registered?
Yes. ACE TECH is registered with UPRERA under registration number UPRERAPRJ477604, registered on 9 Apr 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for ACE TECH?
The completion date filed with UPRERA is 1 Oct 2030. No completion certificate is on record yet.
Who is the builder of ACE TECH?
Star Landcraft Private Limited is the promoter entity that filed ACE TECH with UPRERA (promoter RERA ID UPRERAPRM140560). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does ACE TECH have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ACE TECH located?
ACE TECH is registered in Sector- Techzone, Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in ACE TECH?
The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in ACE TECH?
The approved unit plan filed with UPRERA runs from 13 to 418 m² of carpet area (about 139 to 4,501 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in ACE TECH?
The approved unit plan describes 4 blocks and 1,077 units of which 1,000 are homes and 77 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is ACE TECH?
About 90 units per acre: 1,077 planned units across 12.00 acres (48,567 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗