ACE TECH

UPRERARegistered

ACE TECH is a RERA-registered commercial project by Star Landcraft Private Limited in Sector- Techzone, Gautam Budh Nagar (RERA ID UPRERAPRJ477604). Registered with a completion deadline of 1 Oct 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ477604
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Apr 2026
Project duration55 months
AddressPlot No. 5A, Sector- Techzone, Greater Noida, Uttar Pradesh, Sector- Techzone, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant addressPLOT NO. 01/B SECTOR -126 NOIDA U.P-201303
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    SM-28-Jul-2025-25753

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered9 Apr 2026
Original completion1 Oct 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹4,96,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,077 · 4 · 25 (units from plan)
Homes · commercial units1,000 · 77 (shops and offices filed in the same plan)
  • OTHER1,000 93%
  • SHOP77 7%
ConfigurationUnitsCarpet area
OTHER1,00041-418
SHOP7713-177
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
COMMERCIAL_BLOCK-A · SHOP36813-111
COMMERCIAL_BLOCK-B · SHOP2818-177
TOWER-1 · SHOP, OTHER2255341-218
TOWER-2 · OTHER2544842-418
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 1,901.8 m² for a SHOP, far outside the rest of that type, so the ranges above leave it out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Vineet Jain
License CA/2007/40001
E-107, First Floor, Sector-06, Noida, Uttar Pradesh
Engineer
V.D. Sharma
Optimum Design Private Limited, B-24, Sector-67, Noida, Uttar Pradesh
Contractor
Mubarak Ali
Village Alranjongla, Part-1 P.O.A.M. Road P.Ss Dhubri, Distt. Dhubri, Assam- 783323
Sr.Development work declared to RERA
1Demarcation of Plots
The plot having 48,567 sq. m. plot area, will be demarcated as per the sanction and survey drawing.
2Boundary Wall
A boundary wall ( approx. 806.7 m running length ) of RCC/Brick with plaster and railing will be prepared.
3Road Work
7.5m wide access road to all towers and commercials will be provided and the road will be designed to take up live load as per the approvals and NBC.
4Footpaths
Designed footpath in the plaza as walkways.
5Water Supply Including Drinking Water Facilities
Noida Authority shall supply water for the entire society and it shall be treated and pumped to all the buildings. (2 Raw water tanks of 160 KL each and 2 Treated water tanks of 160 KL each).
6Sewer System
Centralised STP to treat the sewage, will be designed and provided. STP capacity 760 KLD.
7Drain
Rain water drains will be provided as per the design.
8Parks
Beautiful parks will be made for all the occupants to enjoy.
9Tree Planting
As per approved building plan, apt no. of trees will be provided.
10Design For Electric Supply Including Street Lighting
Power supply from Noida electricity board and street lighting as per approved building plan.
11Community Buildings
Social gathering places are being provided.
12Treatment and Disposal System of Sewage and Sullage water
Centralised STP to treat the sewage. STP capacity 760 KLD.
13Solid Waste Management And Disposal System
Collection, storage and disposal will be done as per sanctions and NBC.
14Water Conservation System
Rain water harvesting system is being provided to conserve rain water and dual flush system will be provided with water saving fittings. 10 nos. of RWH pits proposed.
15Energy Management System Including Use of Renewable Energy
Usage of LED lights will be used all over the project and use of solar lights will also be explored.
16Fire Protection And Fire Safety System
As per approved building plan we will design best fire protection system consisting of sprinklers, smoke detectors and fire alarm. 2 fire tanks of 435 KL each.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social gathering places are being provided.
18Emergency Evacuation Services
As per the approved building plan and fire approvals, fire staircases are being provided. 1.5 m and 2m wide fire staircases.
19Other Miscellaneous Work
As per approved building plans. (3-5 no. of water bodies). 03 nos. 2000 KVA, 05 nos. 1600 KVA . Total of 08 nos. of Transformers.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

13 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1AMAN SHARMAUPRERAAGT24918
2FIRSTHOME CONSULTINGUPRERAAGT18543
3GROW INFINITY REALTORSUPRERAAGT23233
4INVESTOXPERT ADVISORS PVT LTDUPRERAAGT21108
5JOINT BRICKS PROPMARTUPRERAAGT11518
6Kutumb ServicesUPRERAAGT13108
7MAYANKUPRERAAGT15731
8MOHIT GOYALUPRERAAGT15259
9MORES TECHNO PRIVATE LIMITEDUPRERAAGT25307
10PC MANTRA INFOSYSTEM PVT. LTD.UPRERAAGT10580
11SANG INFRATECH PVT. LTD.UPRERAAGT10024
12Soil Search Infratech Private Limited (formerly known as Proptronix Infratech Private Limited)UPRERAAGT25555
13URBAN AVENUES LLPUPRERAAGT10834
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Jan 2031.

Sanctioned by Greater Noida Authority · 48,567 sqm of land · an approved plan of 4 blocks and 1077 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
SM-28-Jul-2025-2575310 Jan 20269 Jan 20319 Jan 20331 Oct 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
5A48567Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · Bahi No. 1 Jild No. 46869 Page No. 97-144 Serial No. 12255
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · GN/IT/2024/1449
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · 22-01-2026
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 19/03/2026
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New18 Feb 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New23 Mar 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New19 Feb 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New19 Feb 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New11 Mar 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New11 Mar 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Mar 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Feb 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Feb 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New27 Mar 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New11 Mar 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Mar 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New20 Feb 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New30 Mar 2026 ↗

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2026-Q1.

QuarterConstructionCertificates
2026-Q11%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameStar Landcraft Private Limited
RolePromoter · current
RERA IDUPRERAPRM140560
PANAATCS5903J
CIN / TANMRTS10132D
Name of chairmanAJAY KUMAR
Registered addressPLOT NO. 01/B SECTOR -126 NOIDA U.P-201303
RERA contact
Registered since2021
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
STAR LANDCRAFT PVT. LTD COLLECTION ACCOUNT FOR ACE TECHBankICICI BANKBranchSECTOR-27Branch addressSHOP NO. A,B,C,D, M14&15 GA, E-331, SECTOR-27, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICICI0005344Branch emailyogesh.narang@icicbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
STAR LANDCRAFT PVT. LTD. SEPARATE BANK ACCOUNT FOR ACE TECHBankICICI BANKBranchSECTOR-27Branch addressSHOP NO. A,B,C,D,M14-15 GA, E-331, SECTOR-27, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICICI0005344
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
STAR LANDCRAFT PVT. LTD. RERA TRANSACTION ACOOUNT FOR ACE TECHBankICICI BANKBranchSECTOR-27Branch addressSHOP NO. A,B,C,D,M14-15 GA, E-331, SECTOR-27, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICICI0005344
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about ACE TECH

Is ACE TECH RERA registered?

Yes. ACE TECH is registered with UPRERA under registration number UPRERAPRJ477604, registered on 9 Apr 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ACE TECH?

The completion date filed with UPRERA is 1 Oct 2030. No completion certificate is on record yet.

Who is the builder of ACE TECH?

Star Landcraft Private Limited is the promoter entity that filed ACE TECH with UPRERA (promoter RERA ID UPRERAPRM140560). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does ACE TECH have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ACE TECH located?

ACE TECH is registered in Sector- Techzone, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in ACE TECH?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ACE TECH?

The approved unit plan filed with UPRERA runs from 13 to 418 m² of carpet area (about 139 to 4,501 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in ACE TECH?

The approved unit plan describes 4 blocks and 1,077 units of which 1,000 are homes and 77 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ACE TECH?

About 90 units per acre: 1,077 planned units across 12.00 acres (48,567 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗