Kadamba Kunjh is a RERA-registered residential project by Kadamba Estates Private Limited in Loni, Ghaziabad (RERA ID UPRERAPRJ346760). Registered with a completion deadline of 22 Mar 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ346760 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 May 2026 |
| Project duration | 59 months |
| Address | Plot No. GH-5 & 6 at Koyal Enclave Scheme of GDA, Loni, Ghaziabad, Loni, Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | 9, New Rajdhani Enclave, Vikas Marg, Delhi 110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi development / Plotted Housing/10252/GDA/LD/25-26/1586/23032026
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 3 Jun 2026 |
| Original completion | 22 Mar 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,26,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved layout plan. Total number of 68 plots to be developed. |
| 2 | Boundary Wall The Boundary Wall of Precast Material of 6 Ft. Height will be constructed in those common areas, where there is no boundary line of plots in the project. The total length of Boundary Wall constructed by the Promoter will be 18 Mtr. in the Project. |
| 3 | Road Work Road Access as per sanctioned layout plan. The width/length of road is 9Mtr/175 running meter approx. and 12Mtr/250 running meter approx. The section of the road comprises of 100 MM thick GSB and 100 MM thick WMM and top layer of black top. |
| 4 | Footpaths Not Applicable |
| 5 | Water Supply Including Drinking Water Facilities Internal network of water lines up to all plots shall be laid by the Promoter inside the Project and UPVC Schedule 80 Pipe shall be used. The diameter of the pipe shall be of 25mm to 80mm as per drawing of water supply layout and approximate length of water line is 1000 meter. Main Water Supply Lines till the Project Boundary will be laid by the Development Authority as per Clause No. 15 of Page No. 5 of Registered Agreement to Sell executed by the Development Authority in favor of the Promoter. Main Water Supply Line of Development Authority will be connected with Internal Water Supply Line of the Project by the Promoter. |
| 6 | Sewer System Internal Underground Main Sewerage Line shall be of DWC Pipe with Brick Manholes with RCC Cover of 200 MM Diameter and length will be of 400 running meters approx. and road crossings shall be of 150 MM Diameter and length will be of 200 running meter approx. inside the project shall be provided by the Promoter. Main Sewer Line from the STP of the Development Authority till the Project Boundary will be laid by the Development Authority as per Clause No. 15 of Page No. 5 of Registered Agreement to Sell executed by the Development Authority in favor of the Promoter. Main Sewer Line of Development Authority will be connected with Internal Sewer Line of the Project by the Promoter. |
| 7 | Drain DWC Hume Pipe with Brick Manholes with RCC Cover has been proposed for underground drainage system having 250 mm diameter and length will be of 550 Running Meter approx. and road crossings shall be of 150 MM Diameter and length will be of 200 running meter approx., which shall be laid by the Promoter which will collect the storm water from inside the project and shall be connected to the Authority Drain. Main drainage line till the project boundary will be laid by the Development Authority as per Clause No. 15 of Page No. 5 of Registered Agreement to Sell executed by the Development Authority in favor of the Promoter. Main Drainage Line of Development Authority will be connected with Internal Drainage Line of the Project by the Promoter. |
| 8 | Parks Not Applicable |
| 9 | Tree Planting 28 nos. of Trees will be planted in the project as per Sanctioned layout. |
| 10 | Design For Electric Supply Including Street Lighting The GDA has developed 33/11 KV electricity sub-station through UPPCL for Koyal Enclave Scheme, Ghaziabad, which is situated at around 550 Meter Distance from the project. The promoter will bring separate line of 11KV from the above said electricity sub-station till the project boundary. The Promoter will also install 11KV Line (Through ACSR Rabbit Conductor of 50 Sq. MM and Length is 3300 Mtr. Approx.) & Electricity Poles and will develop complete infrastructure inside the Project and will electrify the whole project. All Individual allottees of plots will obtain their separate electricity connection as per their particular requirement from UPPCL by connecting their electricity line with the poles / 11 KV line installed by the Promoter inside the project. The Promoter will also install 2 Transformers of 63 KVA inside the project to provide common areas services of the project like street lights etc. to the Allottees. Main Electricity Line of UPPCL will be Connected with Internal Electricity Line of the Project by the Promoter.
3.0 Meter Height Pole with LED light and Total no. of street lights are 36 nos. within the project. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Planned sewer network of Development Authority for Koyal Enclave Scheme is already in place. The Project shall be connected to the existing network of the Development Authority as per Clause No. 15 of Page No. 5 of Registered Agreement to Sell executed by the Development Authority in favor of the Promoter. Main Sewage line of Development Authority will be connected with Internal Sewage line of the Project by the Promoter. |
| 13 | Solid Waste Management And Disposal System Not Applicable |
| 14 | Water Conservation System Rain Water Harvesting System will be made by Plot Allottees in respect of his allotted plot in line with the building bye-laws |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Not Applicable as project is plotted development |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Available in Koyal Enclave scheme and near by areas |
| 18 | Emergency Evacuation Services Not Applicable as project is plotted development |
| 19 | Other Miscellaneous Work Some miscellanous work may arise during the course of develoment of Project and there for provision has been made for the same |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Mar 2031.
Sanctioned by Ghaziabad Development Authority · 24,143 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi development / Plotted Housing/10252/GDA/LD/25-26/1586/23032026 | 23 Mar 2026 | 22 Mar 2031 | 22 Mar 2034 | 22 Mar 2031 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot No. GH-5 & 6 at Koyal Enclave Scheme of GDA, Loni, Ghaziabad | 24142.86 | Plot |
| Registry document · 1788 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · GDA/AL-20260210130909686/2026 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Apr 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 15 May 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 17 Apr 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 29 Apr 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Apr 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 27 Apr 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 14 May 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 7 May 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 7 May 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 18 Apr 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 17 Apr 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 17 Apr 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 28 Apr 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 16 May 2026 ↗ |
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2026-Q1 | 30.97% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Kadamba Estates Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM457100 |
| PAN | AAMCK3752C |
| CIN / TAN | U68100DL2025PTC458967 |
| Name of chairman | Rajiv Jain |
| Registered address | 9, New Rajdhani Enclave, Vikas Marg, Delhi 110092 |
| RERA contact | |
| Registered since | 2026 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/s. Kadamba Estates Private Limited Collection Account for Kadamba KunjhBankAU Small Finance BankBranchAU Small Finance Bank, KaushambiBranch addressPlot No. C/3, Kaushambi, Near Yashoda Hospital, Ghaziabad, Uttar Pradesh - 201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002797Branch emailKaushambi_ghaziabad@aubank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | M/s. Kadamba Estates Private Limited Separate Bank Account for Kadamba KunjhBankAU Small Finance BankBranchAU Small Finance Bank, KaushambiBranch addressPlot No. C/3, Kaushambi, Near Yashoda Hospital, Ghaziabad, Uttar Pradesh - 201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002797 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/s. Kadamba Estates Private Limited RERA Transaction Account for Kadamba KunjhBankAU Small Finance BankBranchAU Small Finance Bank, KaushambiBranch addressPlot No. C/3, Kaushambi, Near Yashoda Hospital, Ghaziabad, Uttar Pradesh - 201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002797 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 18 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Kadamba Kunjh
Is Kadamba Kunjh RERA registered?
Yes. Kadamba Kunjh is registered with UPRERA under registration number UPRERAPRJ346760, registered on 3 Jun 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Kadamba Kunjh?
The completion date filed with UPRERA is 22 Mar 2031. No completion certificate is on record yet.
Who is the builder of Kadamba Kunjh?
Kadamba Estates Private Limited is the promoter entity that filed Kadamba Kunjh with UPRERA (promoter RERA ID UPRERAPRM457100). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Kadamba Kunjh have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Kadamba Kunjh located?
Kadamba Kunjh is registered in Loni, Ghaziabad, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗