ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO

UPRERANCLT

ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO is a RERA-registered residential project by ANSAL PROPERTIES & INFRASTRUCTURE LIMITED in Lucknow (RERA ID UPRERAPRJ10150). RERA status: NCLT (since 25 Feb 2025). UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ10150
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Oct 2015
Original start21 Mar 2014
Project duration102 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    39201

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Aug 2017
Original completion31 Oct 2023
Revised completion13 Apr 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹96,000
Sanctioning authorityLucknow Development Authority
NCLT order date25 Feb 2025

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,224 · 8 · 13 (units from plan)
ConfigurationUnitsCarpet area
1 BHK1,22433
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A1 · 1 BHK1315633
A2 · 1 BHK1315633
A3 · 1 BHK1315633
A4 · 1 BHK1315633
A5 · 1 BHK1214433
A6 · 1 BHK1214433
A7 · 1 BHK1315633
A8 · 1 BHK1315633
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Team Architecture Ansal API, Ar Sandeep Seth
License CA/94/17834
Ansal Prop & Infra Ltd
Engineer
ABL Structural Pvt Limited
H-6/316, Agarwal Tower, Netaji Subhash Place, ND-34
Contractor
N/A
N/A
Sr.Development work declared to RERA
1Demarcation of Plots
Boundary Wall
2Boundary Wall
Brickwork & MS Grill
3Road Work
Mix of Bitumen Road/Paver/CC
4Footpaths
Concrete Pavers
5Water Supply Including Drinking Water Facilities
Deep Bore-well Water Supply
6Sewer System
NP2 Concrete Hume Pipe Network
7Drain
NP2 Concrete Hume Pipe Network
8Parks
Lawns, Children Play Area, Combination of Indigenous and Ornamental plants, Hardscape.
9Tree Planting
Combination of Indigenous and Ornamental Plants
10Design For Electric Supply Including Street Lighting
As per relevant Codes & Norms
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
Connected to STP
13Solid Waste Management And Disposal System
House to House Collection System; Segregating Organic and Inorganic Waste in Separate Compartments
14Water Conservation System
Ground Water Recharge System
15Energy Management System Including Use of Renewable Energy
As per Prevailing Laws
16Fire Protection And Fire Safety System
As per NBC Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Guard Room, Parks and Parking
18Emergency Evacuation Services
As per NBC Fire norms, Staircase & Assembly Area
19Other Miscellaneous Work
Benches, Pathways, General Parking
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 14 Oct 2020.

Sanctioned by Lucknow Development Authority · 18,200 sqm of land · an approved plan of 8 blocks and 1224 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
3920115 Oct 201514 Oct 202014 Oct 202314 Oct 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 13 Apr 2024.

#Granted fromExtended uptoNote
131 Oct 202313 Apr 2024—

Land & documents

51 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
201, 226, 228, 233, 234, 235, 236, 239, 240, 241,26304.17 Sq. Meter—
2011800Khasra
2267460Khasra
2284110Khasra
2332020Khasra
2341810Khasra
2351810Khasra
2361720Khasra
2398100Khasra
2403440Khasra
2411810Khasra
2463720Khasra
2477340Khasra
237/10972400Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

18 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 29 Mar 2007.

Registry no.DateTypeArea
151329 Mar 2007self—
222022 May 2007self—
592928 Jul 2015self—
95515 Jan 5015other—
125115 Feb 2011other—
130319 Feb 2011other—
162430 Jan 2014other—
162530 Jan 2014other—
25756 Feb 2015other—
332525 Feb 2015other—
638423 May 2013other—
100502 Jun 2015other—
100512 Jun 2015other—
1640410 Oct 2014other—
1844 May 2012other—
44321 Aug 2014other—
49222 Oct 2013other—
43420 Aug 2014other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 1251
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10051
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 16404
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2020
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1513
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1624
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1625
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1251
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1303
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3325
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 955
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6384
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 184
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 434
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 443
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 492
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Aug 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Aug 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Aug 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old12 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old12 Aug 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old12 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old12 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old12 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old12 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceSewerage, Drainage & Water Supply System provided as per norms

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANSAL PROPERTIES & INFRASTRUCTURE LIMITED
RolePromoter · current
RERA IDUPRERAPRM6378
PANAAACA0006D
CIN / TANL45101DL1967PLC004759
Name of chairmanSUSHIL ANSAL
Registered address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SEC-K2 EWS/LIG-ESCR.A/C-U/O ANSAL APIBankHDFC BANK LIMITEDBranchHAZRATGANJA/C no.IFSCHDFC0000078
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)3149 (Under Registration - 2 ) → 3149 (Under Registration - 0 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)3197 (Under Registration - 2 ) → 3149 (Under Registration - 2 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)3197 (Under Registration - 3 ) → 3197 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 25 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO

Is ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO RERA registered?

Yes. ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO is registered with UPRERA under registration number UPRERAPRJ10150, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO?

The completion date filed with UPRERA is 13 Apr 2024. No completion certificate is on record yet.

Who is the builder of ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO?

ANSAL PROPERTIES & INFRASTRUCTURE LIMITED is the promoter entity that filed ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO with UPRERA (promoter RERA ID UPRERAPRM6378). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO more time to complete?

UPRERA's record carries 1 completion extension for ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO, the latest running to 13 Apr 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO located?

ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO is registered in Lucknow, as filed with UPRERA.

What configurations are available in ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO?

The approved unit plan describes 8 blocks and 1,224 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO?

About 272 units per acre: 1,224 planned units across 4.50 acres (18,200 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗