ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU

UPRERANCLT

ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU is a RERA-registered commercial project by ANSAL PROPERTIES & INFRASTRUCTURE LIMITED in Lucknow (RERA ID UPRERAPRJ3562). RERA status: NCLT (since 25 Feb 2025).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3562
Project categoryCommercial
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Jan 2018
Original start22 Oct 2014
Project duration71 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    38137

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion30 Jun 2023
Revised completion12 Nov 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,18,000
Sanctioning authorityLucknow Development Authority
NCLT order date25 Feb 2025

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors249 · 3 · 9 (units from plan)
Homes · commercial units0 · 249 (shops and offices filed in the same plan)
ConfigurationUnitsCarpet area
SHOP2497-189
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T · SHOP15312-83
T1 · SHOP6747-189
T3 · SHOP812214-54
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Studio 9491 Ar Raman Shukla
License CA/96/20376
C-9/9560 Vasant Kunj, New Delhi 110070
Engineer
Yet to be appointed
N/A
Contractor
Award of work under progress
N/A
Sr.Development work declared to RERA
1Demarcation of Plots
Boundary Wall
2Boundary Wall
Brick-wall & MS Grill
3Road Work
Mix of Bitumen Road/Paver/CC
4Footpaths
Concrete Pavers
5Water Supply Including Drinking Water Facilities
Deep Water Bore-wells
6Sewer System
NP2 Concrete Hume Pipe Network
7Drain
NP2 Concrete Hume Pipe Network
8Parks
Lawns, Children Play Area, Combination of Indigenous and Ornamental Plants, Hardscape.
9Tree Planting
Combination of Indigenous and Ornamental Plants
10Design For Electric Supply Including Street Lighting
As per relevant Codes & Norms
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
Connected to STP
13Solid Waste Management And Disposal System
House to House Connection
14Water Conservation System
Ground Water Recharge System
15Energy Management System Including Use of Renewable Energy
As per Prevailing Laws
16Fire Protection And Fire Safety System
As per NBC Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Broucher
18Emergency Evacuation Services
As per NBC Fire norms, Staircase & Assembly area
19Other Miscellaneous Work
Spacious Lobby, Security Cabin, Surveillance System
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1SHREE SHRADDHA PROPERTIESUPRERAAGT10301
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 13 May 2020.

Sanctioned by Lucknow Development Authority · 10,800 sqm of land · an approved plan of 3 blocks and 249 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
3813714 May 201513 May 202013 May 202313 May 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 12 Nov 2023.

#Granted fromExtended uptoNote
130 Jun 202312 Nov 2023—

Land & documents

28 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
3 And 549 & 55010797.23 Sq. Meters—
39360Khasra
5495650Khasra
5502910Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

7 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 13 Jan 2011.

Registry no.DateTypeArea
22113 Jan 2011self—
1233119 Aug 2011self—
45744 Apr 2011other—
1029213 Jul 2011other—
1753930 Nov 2011other—
149625 Jan 2012other—
1844 May 2012other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 4574
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10292
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1496
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 17539
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 12331
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 221
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 184
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Aug 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New18 Aug 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Aug 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old28 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old28 Jul 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old28 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health servicesewerage, drainage, water supply system as per norms

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANSAL PROPERTIES & INFRASTRUCTURE LIMITED
RolePromoter · current
RERA IDUPRERAPRM6378
PANAAACA0006D
CIN / TANL45101DL1967PLC004759
Name of chairmanSUSHIL ANSAL
Registered address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ZENITH TOWER-ESCR A/C- U/O ANSAL APIBankHDFC BANK LIMITEDBranchHAZRATGANJA/C no.IFSCHDFC0000078
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)3149 (Under Registration - 2 ) → 3149 (Under Registration - 0 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)3197 (Under Registration - 2 ) → 3149 (Under Registration - 2 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)3197 (Under Registration - 3 ) → 3197 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 25 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU

Is ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU RERA registered?

Yes. ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU is registered with UPRERA under registration number UPRERAPRJ3562, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU?

The completion date filed with UPRERA is 12 Nov 2023. No completion certificate is on record yet.

Who is the builder of ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU?

ANSAL PROPERTIES & INFRASTRUCTURE LIMITED is the promoter entity that filed ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU with UPRERA (promoter RERA ID UPRERAPRM6378). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU more time to complete?

UPRERA's record carries 1 completion extension for ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU, the latest running to 12 Nov 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU located?

ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU is registered in Lucknow, as filed with UPRERA.

What configurations are available in ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU?

The approved unit plan filed with UPRERA runs from 7 to 189 m² of carpet area (about 75 to 2,038 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU?

The approved unit plan describes 3 blocks and 249 units of which 0 are homes and 249 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ANSAL API - ZENITH TOWERS, CONV. SHOP.SECTOR J, SU?

About 93 units per acre: 249 planned units across 2.67 acres (10,800 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗