GH-2, Pocket-4, Sector-J (Jeevan Enclave)

UPRERANCLT

GH-2, Pocket-4, Sector-J (Jeevan Enclave) is a RERA-registered residential project by ANSAL PROPERTIES & INFRASTRUCTURE LIMITED in Lucknow (RERA ID UPRERAPRJ2594). RERA status: NCLT (since 25 Feb 2025).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ2594
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Jan 2015
Original start1 Jan 2015
Project duration84 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    35142

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion1 Jul 2021
Revised completion30 Dec 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹96,500
Sanctioning authorityLucknow Development Authority
NCLT order date25 Feb 2025

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors312 · 6 · 13 (units from plan)
  • 2 BHK156 50%
  • 3 BHK156 50%
ConfigurationUnitsCarpet area
2 BHK15671-73
3 BHK1569-102
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK, 2 BHK135271-102
B1 · 2 BHK, 3 BHK135271-102
B2 · 3 BHK, 2 BHK135271-101
B3 · 3 BHK, 2 BHK13529-101
C1 · 3 BHK, 2 BHK135271-102
C2 · 3 BHK, 2 BHK135271-102
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
R L Walecha & Associated Pvt. Ltd.
License CA/95/19044
8, Sanjay Market, R-Block, Greated Kailash, New Delhi
Engineer
Technical Project Consultant
HO-E-2, Church Complex, Sukhdev Vihar, Delhi
Contractor
Spacia Ventures LLP
D-323, Sahara Plaza, Patrakarpuram, Gomti Nagar, Lucknow- 226010
Sr.Development work declared to RERA
1Demarcation of Plots
Boundary Wall
2Boundary Wall
Brick-wall & MS Grill
3Road Work
Mix of Bitumen Road/Paver/CC
4Footpaths
Concrete Pavers
5Water Supply Including Drinking Water Facilities
Deep Water Bore-wells
6Sewer System
NP2 Concrete Hume Pipe Network
7Drain
NP2 Concrete Hume Pipe Network
8Parks
Lawns, Children Play Area, Combination of Indigenous and Ornamental Plants, Hardscape.
9Tree Planting
Combination of Indigenous and Ornamental Plants
10Design For Electric Supply Including Street Lighting
As per relevant Codes & Norms
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
Connected to STP
13Solid Waste Management And Disposal System
House to House Connection
14Water Conservation System
Ground Water Recharge System
15Energy Management System Including Use of Renewable Energy
As per Prevailing Laws
16Fire Protection And Fire Safety System
As per NBC Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Broucher
18Emergency Evacuation Services
As per NBC Fire norms, Staircase & Assembly area
19Other Miscellaneous Work
Spacious Lobby, Security Cabin, Surveillance System
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

24 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ADVENTURES ENTERPRISES PVT LTDUPRERAAGT11208
2AMIT KUMAR NISHADUPRERAAGT14016
3ANAND KUMAR SHUKLAUPRERAAGT10831
4Bhan Pratap Singh C/o Pratap AssociatesUPRERAAGT16163
5BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
6BRIXWELL REALTY & CONSTRUCTION LLPUPRERAAGT15068
7DAIWIK REALTORSUPRERAAGT12075
8Gagan TondonUPRERAAGT14217
9GOLDEN ESTATEUPRERAAGT10397
10INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
11MANJARI AGARWALUPRERAAGT10603
12Mr. Janardan AgarwalUPRERAAGT10555
13PIXEL GLOBAL INFRA PRIVATE LIMITEDUPRERAAGT13936
14RANVEER PROPERTIESUPRERAAGT10234
15Sachin kumar KanodiaUPRERAAGT15911
16SANJEEV KUMAR BANKAUPRERAAGT10894
17SDR INFRA BUILD PVT LTDUPRERAAGT11062
18SHAH MOHSIN KAMALUPRERAAGT14208
19SHREE SHRADDHA PROPERTIESUPRERAAGT10301
20SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
21STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
22TULSI REAL ESTATEUPRERAAGT13187
23Varun Properties Inc.UPRERAAGT11985
24VIVEK ARORAUPRERAAGT15945
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 1 Jul 2018.

Sanctioned by Lucknow Development Authority · 18,300 sqm of land · an approved plan of 6 blocks and 312 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
351422 Jul 20131 Jul 20181 Jul 20211 Jul 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Dec 2021.

#Granted fromExtended uptoNote
11 Jul 202130 Dec 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

40 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
166, 167, 168, 172, 173, 174, 176 & 17818231.09 Sq. Meters—
1661450Khasra
1671450Khasra
16815180Khasra
172600Khasra
1739900Khasra
1742400Khasra
1769780Khasra
1788600Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

13 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 25 May 2007.

Registry no.DateTypeArea
464 Jan 2011self—
69229 Jan 2011self—
405726 Apr 2012self—
452621 Jul 2010self—
528728 Aug 2010self—
59056 Jun 2012self—
230925 May 2007other—
31197 Jul 2007other—
575128 Sept 2010other—
11617 Mar 2008other—
240431 May 2007other—
24595 Jun 2007other—
24605 Jun 2007other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 2404
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2459
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2460
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4526
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5751
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 46
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 692
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4057
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2309
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3119
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5287
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5905
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 116
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Aug 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New18 Aug 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Aug 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old28 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old28 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old28 Jul 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old28 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health servicesewerage, drainage, water supply system as per norms
Renewable energyProvision of Solar Water heating System

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANSAL PROPERTIES & INFRASTRUCTURE LIMITED
RolePromoter · current
RERA IDUPRERAPRM6378
PANAAACA0006D
CIN / TANL45101DL1967PLC004759
Name of chairmanSUSHIL ANSAL
Registered address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Jeevan Enclave ESCR A/C U/O Ansal APIBankBank of MaharashtraBranchVikas NagarA/C no.IFSCMAHB0001281
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)3149 (Under Registration - 2 ) → 3149 (Under Registration - 0 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)3197 (Under Registration - 2 ) → 3149 (Under Registration - 2 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)3197 (Under Registration - 3 ) → 3197 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 25 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about GH-2, Pocket-4, Sector-J (Jeevan Enclave)

Is GH-2, Pocket-4, Sector-J (Jeevan Enclave) RERA registered?

Yes. GH-2, Pocket-4, Sector-J (Jeevan Enclave) is registered with UPRERA under registration number UPRERAPRJ2594, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for GH-2, Pocket-4, Sector-J (Jeevan Enclave)?

The completion date filed with UPRERA is 30 Dec 2021. No completion certificate is on record yet.

Who is the builder of GH-2, Pocket-4, Sector-J (Jeevan Enclave)?

ANSAL PROPERTIES & INFRASTRUCTURE LIMITED is the promoter entity that filed GH-2, Pocket-4, Sector-J (Jeevan Enclave) with UPRERA (promoter RERA ID UPRERAPRM6378). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted GH-2, Pocket-4, Sector-J (Jeevan Enclave) more time to complete?

UPRERA's record carries 1 completion extension for GH-2, Pocket-4, Sector-J (Jeevan Enclave), the latest running to 30 Dec 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does GH-2, Pocket-4, Sector-J (Jeevan Enclave) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GH-2, Pocket-4, Sector-J (Jeevan Enclave) located?

GH-2, Pocket-4, Sector-J (Jeevan Enclave) is registered in Lucknow, as filed with UPRERA.

What configurations are available in GH-2, Pocket-4, Sector-J (Jeevan Enclave)?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GH-2, Pocket-4, Sector-J (Jeevan Enclave)?

The approved unit plan filed with UPRERA runs from 9 to 102 m² of carpet area (about 101 to 1,096 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GH-2, Pocket-4, Sector-J (Jeevan Enclave)?

The approved unit plan describes 6 blocks and 312 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GH-2, Pocket-4, Sector-J (Jeevan Enclave)?

About 69 units per acre: 312 planned units across 4.52 acres (18,300 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗