ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC

UPRERARegistered

ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC is a RERA-registered residential project by R. R. Civil Tech Pvt Ltd in Lucknow (RERA ID UPRERAPRJ4754). Registered with a completion deadline of 28 Mar 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jan–Mar 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'24
—Q3'24
—Q4'24
—Q1'25
32.3%Q2'25
32.3%Q3'25
32.3%Q4'25
32.3%Q1'26

Construction stayed at 32.3% across 4 consecutive filed quarters (Apr–Jun 2025 to Jan–Mar 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ4754
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Jan 2018
Original start2 Jul 2013
Project duration99 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressGround Floor, Raja Ram Kumar Plaza, 75 Hazratganj, Lucknow - 226001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. Permit revalidated (2)

  4. 2 building permits sanctioned

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered29 Jul 2017
Original completion30 Sept 2024
Revised completion28 Mar 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹86,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors448 · 4 · 14 (units from plan)
ConfigurationUnitsCarpet area
2 BHK44865
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
B1 · 2 BHK1411265
B2 · 2 BHK1411265
B3 · 2 BHK1411265
B4 · 2 BHK1411265
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Team Architecture Ansal API, Ar Sandeep Seth
License CA/94/17834
Ansal Prop & Infra Ltd
Engineer
To be appointed
N/A
Contractor
R.R Dwellings Pvt Ltd
Ground Floor, Raja Ramkumar Plaza, 75, Hazratganj, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Boundary Wall
2Boundary Wall
Brick-wall & MS Grill
3Road Work
Mix of Bitumen Road/Paver/CC
4Footpaths
Concrete Pavers
5Water Supply Including Drinking Water Facilities
Deep Water Bore-wells
6Sewer System
NP2 Concrete Hume Pipe Network
7Drain
NP2 Concrete Hume Pipe Network
8Parks
Lawns, Children Play Area, Combination of Indigenous and Ornamental Plants, Hardscape.
9Tree Planting
Combination of Indigenous and Ornamental Plants
10Design For Electric Supply Including Street Lighting
As per relevant Codes & Norms
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
Connected to STP
13Solid Waste Management And Disposal System
House to House Connection
14Water Conservation System
Ground Water Recharge System
15Energy Management System Including Use of Renewable Energy
As per Prevailing Laws
16Fire Protection And Fire Safety System
As per NBC Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Broucher
18Emergency Evacuation Services
As per NBC Fire norms, Staircase & Assembly area
19Other Miscellaneous Work
Spacious Lobby, Security Cabin, Surveillance System
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

24 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ADVENTURES ENTERPRISES PVT LTDUPRERAAGT11208
2AMIT KUMAR NISHADUPRERAAGT14016
3ANAND KUMAR SHUKLAUPRERAAGT10831
4Bhan Pratap Singh C/o Pratap AssociatesUPRERAAGT16163
5BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
6BRIXWELL REALTY & CONSTRUCTION LLPUPRERAAGT15068
7DAIWIK REALTORSUPRERAAGT12075
8Gagan TondonUPRERAAGT14217
9GOLDEN ESTATEUPRERAAGT10397
10INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
11MANJARI AGARWALUPRERAAGT10603
12Mr. Janardan AgarwalUPRERAAGT10555
13PIXEL GLOBAL INFRA PRIVATE LIMITEDUPRERAAGT13936
14RANVEER PROPERTIESUPRERAAGT10234
15Sachin kumar KanodiaUPRERAAGT15911
16SANJEEV KUMAR BANKAUPRERAAGT10894
17SDR INFRA BUILD PVT LTDUPRERAAGT11062
18SHAH MOHSIN KAMALUPRERAAGT14208
19SHREE SHRADDHA PROPERTIESUPRERAAGT10301
20SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
21STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
22TULSI REAL ESTATEUPRERAAGT13187
23Varun Properties Inc.UPRERAAGT11985
24VIVEK ARORAUPRERAAGT15945
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 21 Dec 2022. All 2 carry a revalidation, the latest valid to 21 Jun 2026.

Sanctioned by Lucknow Development Authority · 16,200 sqm of land · an approved plan of 4 blocks and 448 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
4278122 Dec 201721 Dec 202221 Dec 202530 Sept 202422 Dec 2017
4278122 Dec 201721 Dec 202221 Jun 202629 Mar 202522 Dec 2017
valid to 21 Jun 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 28 Mar 2026.

#Granted fromExtended uptoNote
130 Sept 202429 Mar 2025Six months extension in view of force majeure caused by covid-19 pandemic
229 Mar 202528 Mar 2026—

Land & documents

46 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
259, 260, 261, 264, 265, 267, 268, 269, 270 & 32516138.88 Sq. Meters—
2592660Khasra
2603160Khasra
2611390Khasra
2643290Khasra
2654260Khasra
2671640Khasra
2686580Khasra
2695060Khasra
2702040Khasra
3253670Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

17 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 1 Dec 2006.

Registry no.DateTypeArea
1042621 Nov 2007self—
37299 Apr 2007self—
738914 Aug 2007self—
1555024 Oct 2011self—
1556825 Oct 2011self—
160425 Nov 2011self—
37279 Apr 2007self—
1474631 Jul 2013self—
169121 Feb 2007other—
1063113 Dec 2006other—
36597 Apr 2007other—
102141 Dec 2006other—
73722 Jan 2007other—
227513 Mar 2007other—
1120429 Dec 2006other—
1257 May 2007other—
1289 May 2007other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 10426
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3729
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15568
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 16042
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15550
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1691
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 7389
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3659
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10631
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3727
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 737
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10214
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2275
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11204
The registered deed by which the promoter bought the land.
PDF ↗
Lease deed · 14746
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · 125
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 128
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 26253
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8086
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 26255
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8088
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Sept 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Aug 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New18 Aug 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Aug 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old29 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old29 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old29 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old29 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old29 Jul 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old29 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old29 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceSewerage, Drainage & Water Supply System provided as per norms
Renewable energyPROVISION OF SOLAR WATER HEATING SYSTEM

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

24 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

24 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q132.3%CA ↗ · Arch ↗ · Eng ↗
2025-Q232.3%CA ↗ · Arch ↗ · Eng ↗
2025-Q332.3%CA ↗ · Arch ↗ · Eng ↗
2025-Q432.3%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameR. R. Civil Tech Pvt Ltd
RolePromoter · current
RERA IDUPRERAPRM5860
PANAADCR8302A
CIN / TANU45400UP2008PTC034469
Name of chairmanRahul Agarwal
Registered addressGround Floor, Raja Ram Kumar Plaza, 75 Hazratganj, Lucknow - 226001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
R R Civiltech Private Bliss Delight Bliss Delight (Coll)BankIndian BankBranchHazratganj, LucknowBranch addressHazratganj, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCIDIBOOOH561
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
R R Civiltech Private Bliss Delight Bliss Delight (Rera)BankIndian BankBranchHazratganj, LucknowBranch addressHazratganj, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCIDIBOOOH561
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
R R Civiltech Private Bliss Delight Bliss Delight (Expe)BankIndian BankBranchHazratganj, LucknowBranch addressHazratganj, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCIDIBOOOH561
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)8 (Under Registration - 0 ) → 56 (Under Registration - 0 )
changed in Estanzo’s record
21 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 21 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC

Is ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC RERA registered?

Yes. ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC is registered with UPRERA under registration number UPRERAPRJ4754, registered on 29 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC?

The completion date filed with UPRERA is 28 Mar 2026. No completion certificate is on record yet.

Who is the builder of ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC?

R. R. Civil Tech Pvt Ltd is the promoter entity that filed ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC with UPRERA (promoter RERA ID UPRERAPRM5860). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC more time to complete?

UPRERA's record carries 2 completion extensions for ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC, the latest running to 28 Mar 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC located?

ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC is registered in Lucknow, as filed with UPRERA.

What configurations are available in ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC?

The unit plan filed with UPRERA lists 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC?

The approved unit plan describes 4 blocks and 448 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ANSALAPI-BLISS DELIGHT, BLOCK-1,2,3 & 4, GH-2, SEC?

About 112 units per acre: 448 planned units across 4.00 acres (16,200 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗