ARIHANT ENCLAVE is a RERA-registered residential project by AU Real Estate Services Private Limited in Ghaziabad (RERA ID UPRERAPRJ516674). RERA status: Completed on 18 Jan 2024.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ516674 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Apr 2023 |
| Project duration | 60 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | 10, Vikas Marg, Bharat Bhawan, New Rajdhani Enclave, East Delhi, Delhi 110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1153
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 16 May 2023 |
| Original completion | 22 Mar 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 18 Jan 2024 |
| Registration fee | ₹66,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots With Boundary Wall |
| 2 | Boundary Wall Combination of RCC column /beam with 230 mm wide brick work/1.08 metre height approx |
| 3 | Road Work Combination of Cobble stone/ Cement Pavers / Cement Concrete / Bituminos Concrete Flooring with P.C.C. base having drive way width of 5.6/4.5 metre |
| 4 | Footpaths Combination of Kerb stone/ pavers / soft development on compacted subgrade 1700/1500 mm wide on either side of drive way |
| 5 | Water Supply Including Drinking Water Facilities The main source of drinking water will be ground water and shall be extracted through tube well and supplied by existing overhead water tank in township. |
| 6 | Sewer System The soil and waste shall be carried down in independently vented RCC NP2/DWC Drain pipes having diameter from 200 mm and shall be connected to existing main sewer line of township. |
| 7 | Drain Separate and independent rain water drainage system shall be provided for collecting rainwater from paved area, lawn and roads with horizontal DWC/RCC humes pipes 250 mm dia. |
| 8 | Parks Central green lawn as per drawing attached. |
| 9 | Tree Planting Document attached PLANTING STRATEGY. Approx 61 trees shall be planted along boundary / open area. |
| 10 | Design For Electric Supply Including Street Lighting 11 kV incoming supply shall be provided which shall be converted in 415V supply and same shall be feed to entire system. The time switch operated street light shall be provided. the lux level shall be meet as per NBC-2016 guidelines. Approx. 20 poles of 6 metre height along road/open areas are planned. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water To be connected to existing STP of Aditya World City Integrated Township. |
| 13 | Solid Waste Management And Disposal System NA |
| 14 | Water Conservation System Low water flow fixtures are used to conserve the water and two harvesting chamber having desilting chamber of 2.50 metre 1.7 metre 2.0 m depth and harvesting pit of 40 cum capacity shall be done. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Mar 2028.
Sanctioned by Ghaziabad Development Authority · 12,175 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1153 | 23 Mar 2023 | 22 Mar 2028 | 22 Mar 2028 | 22 Mar 2028 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-05 | 12175.06 | Plot |
| Sale deed · 3991 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 11 May 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 26 Apr 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 26 Apr 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 26 Apr 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 11 May 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 11 May 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 11 May 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 11 May 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 12 May 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 11 May 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 26 Apr 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 26 Apr 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 15 May 2023 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2024-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | AU Real Estate Services Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM231944 |
| PAN | AAYCA0592J |
| CIN / TAN | DELA70091A |
| Name of chairman | Uma Agarwal |
| Registered address | 10, Vikas Marg, Bharat Bhawan, New Rajdhani Enclave, East Delhi, Delhi 110092 |
| RERA contact | |
| Registered since | 2023 |
| Legal name | AGARWAL ASSOCIATES (PROMOTERS) LIMITED |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM1799 |
| Applicant type | Company |
| PAN | AAACA2789D |
| CIN / TAN | U51909DL1986PLC023729 |
| Name of chairman | UMA AGARWAL, ADITYA AGARWAL, ASHISH AGARWAL, VIVEK |
| Registered address | 10, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | AU Real Estate Services Private Limited- Collection Account for Arihant EnclaveBankPUNJAB AND SIND BANKBranchKAUSHAMBI GZBBranch addressSHOP NO-14 NEAR WAVE CINEMAS, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH.Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | AU Real Estate Services Private Limited- Separate Bank Account for Arihant EnclaveBankPUNJAB AND SIND BANKBranchKAUSHAMBI GZBBranch addressSHOP NO-14 NEAR WAVE CINEMAS, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH 201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | AU Real Estate Services Private Limited-RERA Transaction Account for Arihant EnclaveBankPUNJAB AND SIND BANKBranchKAUSHAMBI GZBBranch addressSHOP NO-14, NEAR WAVE CINEMAS, KAUSHAMBI, GHAZIABAD , UTTAR PRADESH-201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about ARIHANT ENCLAVE
Is ARIHANT ENCLAVE RERA registered?
Yes. ARIHANT ENCLAVE is registered with UPRERA under registration number UPRERAPRJ516674, registered on 16 May 2023. Estanzo reproduces that filing; it does not verify the work behind it.
Has ARIHANT ENCLAVE been completed?
UPRERA lists ARIHANT ENCLAVE as completed, with a completion certificate dated 18 Jan 2024, against a filed deadline of 22 Mar 2028.
Who is the builder of ARIHANT ENCLAVE?
AU Real Estate Services Private Limited is the promoter entity that filed ARIHANT ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM231944). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does ARIHANT ENCLAVE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ARIHANT ENCLAVE located?
ARIHANT ENCLAVE is registered in Ghaziabad, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗