AWADH PARADISE PHASE 2

UPRERARegistered

AWADH PARADISE PHASE 2 is a RERA-registered residential project by awadh buildcon in Varanasi (RERA ID UPRERAPRJ771296). Registered with a completion deadline of 9 Jun 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ771296
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryVaranasi Development Authority
Proposed start11 Dec 2019
Project duration42 months
AddressPindra **, Varanasi
TehsilPindra **
Applicant typeProprietorship Firm
Applicant addressFLAT NO- A04, Awadh apartment, Central Jail Road, cant, Varanasi, U.P
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    74

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 Jun 2020
Original completion10 Dec 2022
Revised completion9 Jun 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹31,500
Sanctioning authorityVaranasi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors72 · 1 · 7 (units from plan)
Homes · commercial units52 · 20 (shops and offices filed in the same plan)
  • 2 BHK26 36%
  • 1 BHK21 29%
  • SHOP20 28%
  • 3 BHK5 7%
ConfigurationUnitsCarpet area
SHOP2012-87
2 BHK2654-64
1 BHK2134-36
3 BHK585
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
C · SHOP, 2 BHK, 1 BHK, 3 BHK77212-87
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AJAY SINGH
License CA1994/17563
OFFICE NO -11, 2ND FLOOR, PCF PLAZA, MINT HOUSE, VARANASI-221002
Engineer
SHIV SINGH BENIWAL
SPACE CONSULTING ENGINEERS, 19B , DDA SFS POCKET 1, NEW DELHI
Contractor
ABDUL HALIM
VILL- MANIKANAGAR, POST- UTTAR CHANDIPUR, MALDA, WEST BENGAL
Sr.Development work declared to RERA
1Demarcation of Plots
Plot demarcated through boundaries as per VDA (Varanasi development authority) sanction Map
2Boundary Wall
Plot demarcated through concrete pillar and 9" brick wall boundaries approx 1.8 meter height.
3Road Work
PCC and Concrete Road around the building as per VDA sanction MAP.
4Footpaths
Not Applicable
5Water Supply Including Drinking Water Facilities
Providing water Supply through bore well and water tank on roof top of building
6Sewer System
Sewer System will be provided around the building and connected to the septic tank and STP as per VDA.
7Drain
Provide separate pipe from roof top to surface and surface Drain along the boundaries wall.
8Parks
Not Applicable
9Tree Planting
Ten palm tree are already planted on the front side of the building and some more tree plant will plant before completion of the building as per VDA norms.
10Design For Electric Supply Including Street Lighting
Electric supply through separate transformer and generator facility for power backup. Designer street light will be provide around building.
11Community Buildings
not applicable
12Treatment and Disposal System of Sewage and Sullage water
STP of capacity 60 KLD with STP.
13Solid Waste Management And Disposal System
not applicable
14Water Conservation System
we are providing good quality of harvesting bore well
15Energy Management System Including Use of Renewable Energy
not applicable
16Fire Protection And Fire Safety System
Total Building installed with fire fighting system like hose reel, fire extinguisher, etc.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not applicable
18Emergency Evacuation Services
one extra stair provided in the building for any fire emergency.
19Other Miscellaneous Work
not applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Dec 2024.

Sanctioned by Varanasi Development Authority · 2,140 sqm of land · an approved plan of 1 block and 72 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
7411 Dec 201910 Dec 20249 Dec 202510 Dec 2022
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 9 Jun 2023.

#Granted fromExtended uptoNote
110 Dec 20229 Jun 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
52163.86Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 1358
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New27 May 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New14 Mar 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New14 Mar 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New27 May 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New14 Mar 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Mar 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Mar 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New13 Mar 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New28 May 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New27 May 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Mar 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Mar 2020 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameawadh buildcon
RolePromoter · current
RERA IDUPRERAPRM17667
PANakfpr8435h
CIN / TANALDS06527D
Registered addressFLAT NO- A04, Awadh apartment, Central Jail Road, cant, Varanasi, U.P
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSHARVAJEET
RoleCo-promoter
Applicant typeIndividual
AddressHARAHUAADEEH, HARAHUAA, HARHUA, VARANASI, U.P.-221105
RERA contact
Legal nameJAGADISH
RoleCo-promoter
Applicant typeIndividual
Addressharahuaadeeh, harahuaa, pindra , varanasi, UP 221005
RERA contact

Nearby projects

Varanasi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
AWADH BUILDCONBankICICI BANKBranchSIKRAUL VARANASIA/C no.IFSCICIC0003869
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about AWADH PARADISE PHASE 2

Is AWADH PARADISE PHASE 2 RERA registered?

Yes. AWADH PARADISE PHASE 2 is registered with UPRERA under registration number UPRERAPRJ771296, registered on 23 Jun 2020. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for AWADH PARADISE PHASE 2?

The completion date filed with UPRERA is 9 Jun 2023. No completion certificate is on record yet.

Who is the builder of AWADH PARADISE PHASE 2?

awadh buildcon is the promoter entity that filed AWADH PARADISE PHASE 2 with UPRERA (promoter RERA ID UPRERAPRM17667). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted AWADH PARADISE PHASE 2 more time to complete?

UPRERA's record carries 1 completion extension for AWADH PARADISE PHASE 2, the latest running to 9 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does AWADH PARADISE PHASE 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is AWADH PARADISE PHASE 2 located?

AWADH PARADISE PHASE 2 is registered in Varanasi, as filed with UPRERA.

What configurations are available in AWADH PARADISE PHASE 2?

The unit plan filed with UPRERA lists SHOP, 2 BHK, 1 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in AWADH PARADISE PHASE 2?

The approved unit plan filed with UPRERA runs from 12 to 87 m² of carpet area (about 125 to 932 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in AWADH PARADISE PHASE 2?

The approved unit plan describes 1 block and 72 units of which 52 are homes and 20 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is AWADH PARADISE PHASE 2?

About 136 units per acre: 72 planned units across 0.53 acres (2,140 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗