AWADH AMBROSIA is a RERA-registered residential project by SIDDHANT DEVELOPER in Varanasi (RERA ID UPRERAPRJ183751). Registered with a completion deadline of 11 Jan 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ183751 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Varanasi Development Authority |
| Proposed start | 13 Jan 2021 |
| Project duration | 72 months |
| Address | Arazi No.- 56, 57 Village – Dhanesari, Pargana – Athgawan, Tehsil – Pindra, Distt. – Varanasi., Pindra **, Varanasi |
| Tehsil | Pindra ** |
| Applicant type | Partnership Firm |
| Applicant address | S 1/77 B CENTRAL JAIL ROAD, CHUPPEPUR, VARANASI, UTTAR PRADESH-221002 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (2)
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 May 2021 |
| Original completion | |
| Revised completion | 11 Jan 2027 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹43,000 |
| Sanctioning authority | Varanasi Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK121 61%
- 3 BHK64 32%
- 1 BHK8 4%
- SHOP5 3%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 121 | 65 |
| SHOP | 5 | 12-14 |
| 3 BHK | 64 | 86-88 |
| 1 BHK | 8 | 65 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| ALYSA · OTHER, 2 BHK, SHOP | 10 | 38 | 12-65 |
| BARBERRY · OTHER, 2 BHK | 10 | 32 | 65 |
| CHIKA · OTHER, 3 BHK | 13 | 32 | 86-88 |
| DAHLIA · OTHER, 3 BHK | 13 | 32 | 86-88 |
| FLORA · OTHER, 2 BHK | 10 | 32 | 65 |
| GUL · OTHER, 2 BHK, 1 BHK | 10 | 32 | 65 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots This is one of the best location rectangular shaped plot situated at Rameshwar road having single entrance and exit. |
| 2 | Boundary Wall 5-7 ft. high and 9 inch thick designer boundary with light. |
| 3 | Road Work Road work will be done as per design and approval of VDA. |
| 4 | Footpaths We provide narrow foothpath within campus alonwith boundary wall. |
| 5 | Water Supply Including Drinking Water Facilities we provide ground water to every individual in the society. Overhead Tanks shall also be provided on building terrace for distribution in every flat. |
| 6 | Sewer System Centralized sewer system shall be provided and all the sewer drainage shall be released in the STP after treatment water shall be recycled and will be used for gardening and miscellaneous work of the society. Drainage overflow from the STP shall be connected with the Municipal Sewerage in Future or a seasonal natural drain running along with the site boundary. |
| 7 | Drain Storm water system shall be provided from roads and other landscape area which will be connected to the rain water harvesting via storm water drain channel and recharge the ground water and the overflow shall be connected to the Municipal Drain Line in Future. |
| 8 | Parks We are providing greenery area as per VDA norms along with some more landscape area with boundary walls. |
| 9 | Tree Planting We will plant different varieties of trees to maintain oxygen level and natural greenery in society. |
| 10 | Design For Electric Supply Including Street Lighting We have designed the system as per the Local electricity board and consider centralized Transformer, HT Panel, LT Panel, Feeder pillar and DG Backup for common services like external lighting, common STP, pumproom, guardroom, etc. |
| 11 | Community Buildings We are not providing community building yet but we have plan in future if VDA will give the permission. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized Sewage system shall be provided. All severe water shall drained in to the STP for treatment. After that water shall be recycled and will be used in gardening, vehicle washing, etc. Overflow from the STP shall be connect with the Municipal sewerage system in future or a seasonal natural drain running around the site boundary. |
| 13 | Solid Waste Management And Disposal System We will provide garbage collection point in the society and dustbins at different locations in building for solid waste management. |
| 14 | Water Conservation System As per government norms, we are providing rain water harvesting system for the society. |
| 15 | Energy Management System Including Use of Renewable Energy We will provide energy saving LEDs light in common areas like passage, stairs, boundary walls etc.
Solar Voltaic Panels will be fixed on terrace to provide renewable source of energy for common areas in building campus. |
| 16 | Fire Protection And Fire Safety System We will provide all fire fighting safety equipment as per government norms to protect the society from any fire hazards. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services We are providing common washrooms for the visitors/drivers, free drinking water facility, guard rooms, etc. |
| 18 | Emergency Evacuation Services Fire staircase is provided in each building as per VDA Approved map with the fire resistance doors and basement access and exit. |
| 19 | Other Miscellaneous Work We will provide grand entrance gate and waiting area, etc. |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 13 Jan 2026. 2 of them carry a revalidation.
Sanctioned by Varanasi Development Authority · 7,598 sqm of land · an approved plan of 6 blocks and 198 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 08 | 13 Jan 2021 | 12 Jan 2026 | 12 Jan 2028 | 12 Jan 2026 | — | |
| Group Housing/05297/VDA/BP/25-26/1546/01012026 | 13 Jan 2021 | 12 Jan 2026 | 12 Jan 2029 | 12 Jan 2026 | 13 Jan 2021 | |
| Group Housing/05297/VDA/BP/25-26/1546/01012026 | 13 Jan 2021 | 13 Jan 2026 | 12 Jan 2029 | 12 Jan 2026 | 13 Jan 2021 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 11 Jan 2027.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 11 Jan 2027 | — |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 56, 57 | 7598.85 | Khasra |
| Registry document · 5666 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 27 May 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 5 Mar 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 13 Apr 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 27 May 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 13 Apr 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Apr 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 13 Apr 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Apr 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Apr 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 27 May 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 13 Apr 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 13 Apr 2021 ↗ |
Quarterly progress reports
22 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
22 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 70% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 68.37% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 82.59% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 82.59% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SIDDHANT DEVELOPER |
| Role | Promoter · current |
| RERA ID | UPRERAPRM135647 |
| PAN | ACYFS0737Q |
| CIN / TAN | ACYFS0737Q |
| Registered address | S 1/77 B CENTRAL JAIL ROAD, CHUPPEPUR, VARANASI, UTTAR PRADESH-221002 |
| RERA contact | |
| Registered since | 2021 |
| Legal name | AMIT KUMAR SINGH |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM30169 |
| Applicant type | Individual |
| PAN | BBKPS8269R |
| Registered address | 158/30/1 KAZIPUR, NAINI, ALLAHABAD PIN. 211008 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | BALKRISHNA NARAYAN SINGH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | Harahua, Ramsinghpur, Varanasi, Uttar Pradesh-221105 |
| RERA contact |
| Legal name | DINESH PRATAP SINGH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | HARAHUA, RAMSINGHPUR, VARANASI, UTTAR PRADESH-221105 |
| RERA contact |
| Legal name | DEV KRISHNANARAYAN SINGH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | RAMSINGHPUR, VARANASI, UTTAR PRADESH-221105 |
| RERA contact |
| Legal name | SURENDRA NARAYAN SINGH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | B-666, Rajendra Nagar East, Near Lalitpuram, Rajendra Nagar Gorakhpur, Uttar Pradesh-273015 |
| RERA contact |
Nearby projects
Varanasi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SIDDHANT DEVELOPER AWADH AMBROSIA RERA COLLECTION ACCOUNTBankICICI BANKBranchSIKRAUL, VARANASIBranch addressS-2/326 E, MOHALLA/WARD-SIKRAUL, VARANASI, U.P.-221002Branch districtVaranasi, Uttar PradeshA/C no.IFSCICIC0003869Branch emailgaurav.kumarsrivastavaattherateicicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SIDDHANT DEVELOPER AWADH AMBROSIA RERA COLLECTION ACCOUNTBankICICI BANKBranchSIKRAUL, VARANASIBranch addressS-2/326 E, MOHALLA/WARD-SIKRAUL, VARANASI, U.P.-221002Branch districtVaranasi, Uttar PradeshA/C no.IFSCICIC0003869 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SIDDHANT DEVELOPER AWADH AMBROSIA RERA RETENTION ACCOUNTBankICICI BANKBranchSIKRAUL, VARANASIBranch addressS-2/326 E, MOHALLA/WARD-SIKRAUL, VARANASI, U.P.221002Branch districtVaranasi, Uttar PradeshA/C no.IFSCICIC0003869Branch emailgaurav,kumarsrivastavaattherateicicibank.com |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about AWADH AMBROSIA
Is AWADH AMBROSIA RERA registered?
Yes. AWADH AMBROSIA is registered with UPRERA under registration number UPRERAPRJ183751, registered on 31 May 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for AWADH AMBROSIA?
The completion date filed with UPRERA is 11 Jan 2027. No completion certificate is on record yet.
Who is the builder of AWADH AMBROSIA?
SIDDHANT DEVELOPER is the promoter entity that filed AWADH AMBROSIA with UPRERA (promoter RERA ID UPRERAPRM135647). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted AWADH AMBROSIA more time to complete?
UPRERA's record carries 1 completion extension for AWADH AMBROSIA, the latest running to 11 Jan 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does AWADH AMBROSIA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is AWADH AMBROSIA located?
AWADH AMBROSIA is registered in Varanasi, as filed with UPRERA.
What configurations are available in AWADH AMBROSIA?
The unit plan filed with UPRERA lists OTHER, 2 BHK, SHOP, 3 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in AWADH AMBROSIA?
The approved unit plan filed with UPRERA runs from 12 to 88 m² of carpet area (about 129 to 947 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in AWADH AMBROSIA?
The approved unit plan describes 6 blocks and 198 units of which 193 are homes and 5 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is AWADH AMBROSIA?
About 105 units per acre: 198 planned units across 1.88 acres (7,598 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗