Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda

UPRERARegistered

Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Gonda (RERA ID UPRERAPRJ375818). Registered with a completion deadline of 30 Sept 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
92%Q2'25
92%Q3'25
100%Q4'25
100%Q1'26
100%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ375818
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Apr 2019
Project duration90 months
AddressGonda, Gonda
TehsilGonda
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    418/AP-3/PMAY

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. to

    Extension granted

  9. Completion certificate filed

  10. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Feb 2019
Original completion31 Mar 2023
Revised completion30 Sept 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary8 Sept 2026
Registration fee₹30,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors240 · 1 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK24023
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
B5,B6,B9,B10,B11 · 1 BHK424023
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arvind Dev
License CA/97/22345
Neelgiri Complex Indira Nagar , Lucknow.
Engineer
Mr. Sanjay Jaiswal Mob No- 9810575453
11/165, Vasundhara, Ghaziabad
Contractor
M/s Izhar Ali Contractor
Gayatri Puram, Civil Lines, Gonda
Sr.Development work declared to RERA
1Demarcation of Plots
BAs per Layout Plan. BLOCK NO -B5,B6,B9,B10,B11
2Boundary Wall
Not Applicable
3Road Work
Yet to be started as per Layout plan.Internal Road work will be done by UPAVP and External Road work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
4Footpaths
Yet to be started as per Layout plan.Internal Footpath work will be done by UPAVP and External Footpath work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
5Water Supply Including Drinking Water Facilities
Yet to be started as per Layout plan.Internal Water Supply Including Drinking Water Facilities work will be done by UPAVP and External Water Supply Including Drinking Water Facilities work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
6Sewer System
Yet to be started as per Layout plan.Internal Sewer System work will be done by UPAVP and External Sewer System work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
7Drain
Yet to be started as per Layout plan.Internal DRAIN System work will be done by UPAVP and External DRAIN System work will be done by UP LOCAL BODIES as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
8Parks
Yet to be started as per Layout plan by UPAVP.
9Tree Planting
Yet to be started as per Layout plan by UPAVP.
10Design For Electric Supply Including Street Lighting
Yet to be started as per Layout plan.Internal ELECTRIC SUPPLY System work will be done by UPAVP and External ELECTRIC SUPPLY System work will be done by UP PCL as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
11Community Buildings
Not applicable.
12Treatment and Disposal System of Sewage and Sullage water
After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme.
13Solid Waste Management And Disposal System
After completion of project will be handed over to local authority.Solid Waste Point is situated in Proposede scheme.
14Water Conservation System
Not Applicable
15Energy Management System Including Use of Renewable Energy
Not Applicable
16Fire Protection And Fire Safety System
Not Applicable
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not Applicable
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
As per Layout Plan.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 19 Aug 2023. 1 of them carries a revalidation, valid to 19 Aug 2026.

Sanctioned by U.P. Awas Evam Vikas Parishad · 3,032.74 sqm of land · an approved plan of 1 block and 240 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
418/AP-3/PMAY20 Aug 201819 Aug 202318 Aug 202531 Mar 2023—
418/AP-3/PMAY20 Aug 201819 Aug 202319 Aug 202630 Sept 202320 Aug 2018
valid to 19 Aug 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 30 Sept 2026.

#Granted fromExtended uptoNote
131 Mar 202330 Sept 2023Six months extension in view of force majeure caused by covid-19 pandemic
230 Sept 202330 Mar 2025—
330 Mar 202530 Sept 2026—

Land & documents

24 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1355503Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 101/NAJOOL VIBHAG/BHU. HASTA./2018
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New21 Feb 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New21 Feb 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New21 Feb 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Feb 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Feb 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Feb 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Jan 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Feb 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Feb 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Feb 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Feb 2019 ↗

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q192%CA ↗ · Arch ↗ · Eng ↗
2025-Q292%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
2025-Q4100%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Executive Engineer CD-TwoBankHDFC BANKBranchAliganj LucknowA/C no.IFSCHDFC0000412
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

16 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Latest completion certificate filed on2026-09-08
first recorded by Estanzo
13 Sept 2026
Completion date recorded2026-09-08
first recorded by Estanzo
13 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Latest completion certificate filed onfirst recorded by Estanzo · 13 Sept 2026
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda

Is Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda RERA registered?

Yes. Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda is registered with UPRERA under registration number UPRERAPRJ375818, registered on 27 Feb 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda been completed?

UPRERA still lists Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda as Registered, so it is not shown as completed here. A completion certificate dated 8 Sept 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda more time to complete?

UPRERA's record carries 3 completion extensions for Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda, the latest running to 30 Sept 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda located?

Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda is registered in Gonda, as filed with UPRERA.

What configurations are available in Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda?

The approved unit plan describes 1 block and 240 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda?

About 320 units per acre: 240 planned units across 0.75 acres (3,032.74 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗