Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Gonda (RERA ID UPRERAPRJ252213). Registered with a completion deadline of 29 Nov 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ252213 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 25 Feb 2021 |
| Project duration | 34 months |
| Address | Gonda, Gonda |
| Tehsil | Gonda |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
APD/UN-3/CIR-3
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 23 Feb 2021 |
| Original completion | 24 Feb 2023 |
| Revised completion | 29 Nov 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 28 Nov 2025 |
| Registration fee | ₹61,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved layout plan .The plot shall be demarcated by means of T. |
| 2 | Boundary Wall Parishad shall not provide any boundary wall. To be built by the alotte concern inline with the Bhawan Nirman Upvidhi. |
| 3 | Road Work As per specifications of U.P. Awas Evam Vikas Parishad ( Chief Engineer Office Order No. 685/M-4/2017 Dt 19-03-2017 and others) and work shall be carried out as per UPPWD specifications. Soling coat with 45-90 mm stone ballast. Inner coat with 45-63 mm stone ballast. Top coat with 22.4-53mm stone ballast. Bituminous coat over top coat. |
| 4 | Footpaths As per specifications of U.P. Awas Evam Vikas Parishad (Chief Engineer office order No. 685/M-4/2017 Dt 19-03-2017 and others) and work shall be carried out as per UPPWD specifications. |
| 5 | Water Supply Including Drinking Water Facilities Provided / shall be provided as per norms and specification of UP Jal Nigam. The network consist of Trunk water line laid in trunk road cross section with OHT in sector to cater of the plots. Water line laying of PVC pipe ISI Mark ( Pressure 6.00 Kg per sqcm) at site. |
| 6 | Sewer System Provided. The under ground sewer network with manholes and chambers shall be provided in accordance with UP Jal Nigam specifications and Chief Engineers order no 912/M-1/ 94 dt 20.10.2005. Sewer line provided by NP2 and NP3 class RCC hume pipe of different dia as per design . |
| 7 | Drain Open chainalized water drainage network is to be provided. Drains shall be of Type C-1,C-2,C-3 etc.The construction shall be as per UPPWD specifications. Brick masonary drain provided in 1 ratio 6 with cement and coarse sand. |
| 8 | Parks Provided as shown in approved layout but in future.The construction and development shall be inline with office order no 878/ISO dt 5-4-2017. |
| 9 | Tree Planting By sides of the roads and in parks as per approved layout. |
| 10 | Design For Electric Supply Including Street Lighting Shall be done by UP Awas Evam Vikas Parishad and shall be handed over to UPPCL. |
| 11 | Community Buildings Community buildings will be built in future as per approved layout plan. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Planned Sewer network provided for entire scheme. These plots shall be connected to this proposed network. |
| 13 | Solid Waste Management And Disposal System No any provision. |
| 14 | Water Conservation System No any provision. |
| 15 | Energy Management System Including Use of Renewable Energy No any provision. |
| 16 | Fire Protection And Fire Safety System No any provision. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services No any provision. |
| 18 | Emergency Evacuation Services No any provision. |
| 19 | Other Miscellaneous Work No any provision. |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 30 Nov 2023. 1 of them carries a revalidation, valid to 29 Nov 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 11,288 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| APD/UN-3/CIR-3/CD-2/LOP/GONDA/40 | 30 Nov 2018 | 30 Nov 2023 | 30 Nov 2025 | 24 Feb 2023 | — | |
| APD/UN-3/CIR-3 | 30 Nov 2018 | 30 Nov 2023 | 29 Nov 2026 | 29 Nov 2023 | 30 Nov 2018 valid to 29 Nov 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 29 Nov 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 24 Feb 2023 | 29 Nov 2023 | — |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 520 ,522,548,549 | 11288 | Khasra |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 4182 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 19 Jan 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 19 Jan 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 19 Jan 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 19 Jan 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 19 Jan 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 19 Jan 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 19 Jan 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 19 Jan 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 19 Jan 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 19 Jan 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Feb 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Feb 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Feb 2021 ↗ |
Quarterly progress reports
12 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
12 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2023-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gonda
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | UPAVP Gonda Fzd Marg Bhumi Vikas YojnaBankHDFC BankBranchGONDAA/C no.IFSCHDFC0001901 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda.
Is Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. RERA registered?
Yes. Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. is registered with UPRERA under registration number UPRERAPRJ252213, registered on 23 Feb 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. been completed?
UPRERA still lists Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. as Registered, so it is not shown as completed here. A completion certificate dated 28 Nov 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda.?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. more time to complete?
UPRERA's record carries 1 completion extension for Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda., the latest running to 29 Nov 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. located?
Plotted development work at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihstan Yojna Gonda. is registered in Gonda, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗