Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda
Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Gonda (RERA ID UPRERAPRJ951956). Registered with a completion deadline of 30 Nov 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ951956 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Dec 2022 |
| Project duration | 36 months |
| Address | Gonda, Gonda |
| Tehsil | Gonda |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
APD/UN-3/CIR-3/CD-2/LOP/GONDA/40
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 26 Sept 2022 |
| Original completion | 30 Nov 2024 |
| Revised completion | 30 Nov 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 28 Nov 2025 |
| Registration fee | ₹48,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots AS PER APPROVED LAYOUT PLAN.THE PLOTS SHALL BE DEMARCATED BY MEANS OF T. |
| 2 | Boundary Wall PARISHAD SHALL NOT BE PROVIDED ANY BOUNDRY WALL. TO BE BUILT BY THE ALLOTTEE CONCERN INLINE WITH THE BHAWAN NIRMAN UPVIDHI. |
| 3 | Road Work AS PER SPECIFICATION OF UP AWAS EWAM VIKAS PARISHAD. AS PER CHIEF ENGINEER ORDER NO. 685/M-4/2017 DT 19-03-2017.AND OTHERS, AND WORK SHALL BE CARRIED OUT AS PER SPECIFICATION OF UPPWD. THE ROAD WIDTH WILL BE PROVIDED 12.00 M ,9.00 M , 7.50 M AND 6.00 M WIDE. SOLING COAT 45-90 MM STONE GRRIT 265MM 335MM AND 150 MM THICK , INNER COAT 45-63 MM STONE GRRIT 225 MM THICK, TOP COAT BITUMINOUS MACADUM 50MM THICK AND TOP COAT WITH SDBC 25 MM THICK PROVIDED. |
| 4 | Footpaths AS PER SPECIFICATION OF UP AWAS EWAM VIKAS PARISHAD AS PER CHIEF ENGINEER ORDER NO 685/M-4/2017 DT 19-03-2017. AND WORK SHALL BE CARRIED OUT AS PER PWD SPECIFICATION. ROAD PATTERIES WILL BE PROVIDED 3.25 M , 2.00 M , 1.25M, AND 0.80 M WIDE. |
| 5 | Water Supply Including Drinking Water Facilities PROVIDED AS PER SPECIFICATION OF UP JAL NIGAM / UP AWAS EVAM VIKAS PARISHAD. OVER HEAD TANK AND PUMP HOUSE PROVIDED IN CAMPUS FOR WATER SUPPLY. THE NETWORK CONSIST OF TRUNK WATER LINE LAID IN TRUNK CROSS SECTION WITH OHT IN SECTOR TO CATER OF THE PLOTS. WATER KINE LAYING WITH PVC PIPES ISI MARKED (PRESSURE 6.00 KG PER SQMCM.) |
| 6 | Sewer System PROVIDED THE UNDER GROUND SEWER NETWORK WITH MANHOLES AND CHAMBER SHALL BE PROVIDED IN ACOORADANCE CHIEF ENGINEER LETTER NO - 912/M-1/94 DATED- 20.10.2005 WITH UP JAL NIGAM / UP AWAS EVAM VIKAS PARISHAD SPECIFICATIONS. SEWER LINE PROVIDED BY NP-2, NP-3 RCC HUME PIPES OF DIFFERENT DIA AS PER DESIGN WET LAND TECHNOLOGY BASED STP WILL ALSO PROVIDED AS PER DESIGN. |
| 7 | Drain OPEN CHANNEL DRAIN ARE PROVIDED FOR STORM WATER FLOW. AS PER APPROVED DESIGN AND DRAWING. WORK SHALL BE CARRIED OUT AS PER SPECIFICATION OF UPPWD NORMS. THE DRAIN WILL BE C-1,C-2,C-3 ETC. THE CONSTRUCTION SHALL BE AS PER UPPWD SPECIFICATIONS BRICK MASONRY DRAIN PROVIDED IN 1 RATIO 6 WITH CEMENT AND COARSE SAND. |
| 8 | Parks PROVIDED AS PER SHOWN IN APPROVED LAYOUT. THE CONSTRUCTION AND DEVELOPMENT SHALL BE INLINE WITH OFFICE ORDER NO 478/ISO DT 05-04-2017 |
| 9 | Tree Planting BY SIDES OF THE ROADS AND IN THE OPEN PARKS. |
| 10 | Design For Electric Supply Including Street Lighting SHALL BE DONE BY UPAVP AND HANDED OVER TO UPPCL. |
| 11 | Community Buildings COMMUNITY BUILDING WILL BE BUILT IN FUTURE AS PER APPROVED PLAN. |
| 12 | Treatment and Disposal System of Sewage and Sullage water PLANNED SEWER NETWORK PROVIDED FOR ALL PLOTS .THESE PLOTS SHALL BE CONNECTED TO ENTIRE NETWORK. WET LAND TECHNOLOGY BASED STP WILL PROVIDED AS PER DESIGN. |
| 13 | Solid Waste Management And Disposal System PROVIDED UPTO YOJNA HANDED OVER TO LOCAL AUTHORITY. |
| 14 | Water Conservation System NO ANY PROVISION |
| 15 | Energy Management System Including Use of Renewable Energy NO ANY PROVISION |
| 16 | Fire Protection And Fire Safety System NO ANY PROVISION |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NO ANY PROVISION |
| 18 | Emergency Evacuation Services NO ANY PROVISION |
| 19 | Other Miscellaneous Work NO ANY PROVISION |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 30 Nov 2023. 1 of them carries a revalidation, valid to 29 Nov 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 8,518 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| APD/UN-3/CIR-3/CD-2/LOP/GONDA/40 | 30 Nov 2018 | 30 Nov 2023 | 30 Nov 2025 | 30 Nov 2024 | — | |
| APD/UN-3/CIR-3/CD-2/LOP/GONDA/40 | 30 Nov 2018 | 30 Nov 2023 | 20 Nov 2026 | 30 Nov 2024 | 30 Nov 2018 valid to 29 Nov 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Nov 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Nov 2024 | 30 Nov 2025 | — |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 520,522,546,547,548,549,593 | 8517.50 | Khasra |
| Registry document · 4182/2018 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 13 Sept 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 13 Sept 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 13 Sept 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 13 Sept 2022 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 13 Sept 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 13 Sept 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 13 Sept 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 13 Sept 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 13 Sept 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Sept 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 23 Sept 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 13 Sept 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 13 Sept 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 13 Sept 2022 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 81% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gonda
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Upavp Gonda Faizabad Marg Scheme Gonda Balance Property Collection AccountBankState Bank of IndiaBranchMain Branch GondaBranch addressGondaBranch districtGonda, Uttar PradeshA/C no.IFSCSBIN0000084 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Upavp Gonda-Faizabad Marg Scheme Gonda Balance Property Separate AccountBankState Bank of IndiaBranchMain Branch GondaBranch addressGondaBranch districtGonda, Uttar PradeshA/C no.IFSCSBIN0000084 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Upavp Gonda-Faizabad Marg Scheme Gonda Balance Property Transaction AccountBankState Bank of IndiaBranchMain Branch GondaBranch addressGondaBranch districtGonda, Uttar PradeshA/C no.IFSCSBIN0000084 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda
Is Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda RERA registered?
Yes. Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda is registered with UPRERA under registration number UPRERAPRJ951956, registered on 26 Sept 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda been completed?
UPRERA still lists Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda as Registered, so it is not shown as completed here. A completion certificate dated 28 Nov 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda more time to complete?
UPRERA's record carries 1 completion extension for Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda, the latest running to 30 Nov 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda located?
Plotted development work of 150 nos plots in second phase at Gonda-Faizabaad Marg Yojna in Distt Gonda is registered in Gonda, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗