Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Gonda (RERA ID UPRERAPRJ814610). Registered with a completion deadline of 30 May 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ814610 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Dec 2020 |
| Project duration | 66 months |
| Address | Gonda, Gonda |
| Tehsil | Gonda |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
418/AP-3/PMAY
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 Jul 2020 |
| Original completion | 30 Nov 2024 |
| Revised completion | 30 May 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 May 2026 |
| Registration fee | ₹50,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 396 | 23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| B1 · 1 BHK | 4 | 48 | 23 |
| B11 · 1 BHK | 4 | 48 | 23 |
| B2 · 1 BHK | 4 | 48 | 23 |
| B3 · 1 BHK | 4 | 48 | 23 |
| B4 · 1 BHK | 4 | 48 | 23 |
| B5 · 1 BHK | 4 | 12 | 23 |
| B6 · 1 BHK | 4 | 48 | 23 |
| B7 · 1 BHK | 4 | 48 | 23 |
| B8 · 1 BHK | 4 | 48 | 23 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Layout Plan by UPAVP. |
| 2 | Boundary Wall Not Applicable |
| 3 | Road Work Yet to be started as per Layout plan.Internal Road work will be done by UPAVP and External Road work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Bituminous road is proposed with Base of WMM/WBM and including GSB. |
| 4 | Footpaths Yet to be started as per Layout plan.Internal Footpath work will be done by UPAVP and External Footpath work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Footpath prosed as per UPAVP guidelines by Interlocking tiles or SOB Brick soling. |
| 5 | Water Supply Including Drinking Water Facilities Yet to be started as per Layout plan.Internal Water Supply Including Drinking Water Facilities work will be done by UPAVP and External Water Supply Including Drinking Water Facilities work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Water supply proposed as per UPAVP guidelines with rising main. |
| 6 | Sewer System Yet to be started as per Layout plan.Internal Sewer System work will be done by UPAVP and External Sewer System work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Septic tamk and soak pit proposed as per site requirement for sewage disposal. |
| 7 | Drain Yet to be started as per Layout plan.Internal DRAIN System work will be done by UPAVP and External DRAIN System work will be done by UP LOCAL BODIES as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Brick work in 1 ratio 6 proposed for drain with pointing. |
| 8 | Parks Yet to be started as per Layout plan by UPAVP. |
| 9 | Tree Planting Yet to be started as per Layout plan by UPAVP. |
| 10 | Design For Electric Supply Including Street Lighting Yet to be started as per Layout plan.Internal ELECTRIC SUPPLY System work will be done by UPAVP and External ELECTRIC SUPPLY System work will be done by UP PCL as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 11 | Community Buildings Not applicable. |
| 12 | Treatment and Disposal System of Sewage and Sullage water After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme. |
| 13 | Solid Waste Management And Disposal System After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme. |
| 14 | Water Conservation System Not applicable. |
| 15 | Energy Management System Including Use of Renewable Energy Not applicable. |
| 16 | Fire Protection And Fire Safety System As per Layout Plan |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not applicable. |
| 18 | Emergency Evacuation Services Not applicable. |
| 19 | Other Miscellaneous Work As per Layout Plan |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 26 Aug 2023. 1 of them carries a revalidation, valid to 19 Aug 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 9,098 sqm of land · an approved plan of 9 blocks and 396 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 418/AP-3/PMAY | 27 Aug 2018 | 26 Aug 2023 | 26 Aug 2025 | 30 Nov 2024 | — | |
| 418/AP-3/PMAY | 27 Aug 2018 | 26 Aug 2023 | 10 Aug 2026 | 30 Nov 2024 | 27 Aug 2018 valid to 19 Aug 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 May 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Nov 2024 | 30 May 2026 | — |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 135 | 9098 | Khasra |
| Allotment letter from the authority · 101/NAJOOL VIBHAG/BHU. HASTA./2018 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Jun 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 11 Jun 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 11 Jun 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 11 Jun 2020 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 11 Jun 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 8 Jul 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 11 Jun 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 11 Jun 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 11 Jun 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Jun 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 8 Jul 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Jun 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 25 Jun 2020 ↗ |
Quarterly progress reports
23 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
23 quarterly progress reports are on file with UPRERA, covering 2020-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 84% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gonda
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Executive Engineer Construction Division Two UPAVPBankHDFC BankBranchGondaA/C no.IFSCHDFC0001901 |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Filed document viewprojects · 18 | ENGINEERS CERTIFICATE newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 17 | ARCHITECT CERTIFICATE newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 16 | CA CERTIFICATE newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 15 | Affidavit (Form-B) newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 14 | Development Work Plan newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 13 | Electricity Supply Plan newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 12 | Water Supply Plan newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 11 | Waste Disposal Plan newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 10 | Proforma of Completion Certificate(Occupancy) newly filed with RERA | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda.
Is Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. RERA registered?
Yes. Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. is registered with UPRERA under registration number UPRERAPRJ814610, registered on 29 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. been completed?
UPRERA still lists Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. as Registered, so it is not shown as completed here. A completion certificate dated 29 May 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda.?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. more time to complete?
UPRERA's record carries 1 completion extension for Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda., the latest running to 30 May 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. located?
Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. is registered in Gonda, as filed with UPRERA.
What configurations are available in Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda.?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda.?
The approved unit plan describes 9 blocks and 396 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda.?
About 176 units per acre: 396 planned units across 2.25 acres (9,098 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗