Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad

UPRERARegistered

Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Moradabad (RERA ID UPRERAPRJ685451). Registered with a completion deadline of 3 Sept 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ685451
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start4 Jun 2020
Project duration51 months
AddressMoradabad, Moradabad
TehsilMoradabad
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    076024

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Permit revalidated

    076024

  6. Building permit sanctioned

    076024

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered29 Jul 2020
Original completion3 Jun 2023
Revised completion3 Sept 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary2 Sept 2024
Registration fee₹11,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors144 · 3 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK14423
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 1 BHK44823
2 · 1 BHK44823
3 · 1 BHK44823
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mukesh Ruhela
License CA/87/10943
Architecture and Planning Unit-2 NILGIRI COMPLEX INDRA NAGR LUCKNOW
Engineer
SANJAY JAISWAL
11/165 VASUNDHARA GHAZIABAD
Contractor
UP AVAS VIKAS PARISHAD
3C 118 AND 119 BUDHI VIHAR MORADABAD
Sr.Development work declared to RERA
1Demarcation of Plots
The Plot is clearly demarcated in Sector 15 in Majhola No-4 (vistar) Moradabad as per the sanctioned layout the plot is situated facing 9.00 m wide road in layout. Apart from 12.00 m wide road and 6.00 m wide road are also proposed in layout encompassing this plot.
2Boundary Wall
Boundary wall is not included in the proposed projected. It will be constructed seprate project.
3Road Work
Road work for the whole scheme is sanctioned and tender processing is running for construction. In the proposed project of 144 Nos. of houses 6.00 meter wide road, 7.50 meter wide road 9.00 meter wide and 3.00 meter CC tiles road along two side periphere which is shown in layout is to be constructed as seperate project.
4Footpaths
Footpaths are not proposed in the sanctioned layout plan of the project.
5Water Supply Including Drinking Water Facilities
Over head tank and Water supply distribution system is sanctioned and tender proceesing is running for cosntruction this project which will be done at completion stage as seperate project.
6Sewer System
Sewer distribution system is sanctioned and tender proceesing is running for cosntruction this project which will be done at completion stage as seperate project trunk sewer line is laid alreay.
7Drain
Drainage system of whole scheme are in under project which is likely to be completed November 2020. Internal drain.
8Parks
Construction of boundary wall/RCC grill of the proposed park in the scheme is sanctioned and tendering is processing. Plantation work is already completed wire fencing is already completed.
9Tree Planting
Tree plantation in the scheme is under progress which will be done on roads and parks of the scheme. For the mentioned plot of PMAY 144 Nos. of houses plantation on 7.50 m and 9.00 m wide road and 6.00 m wide road will be done after drain and road work.
10Design For Electric Supply Including Street Lighting
Electric supply including street lighting is not included in the proposed projected. It will be constructed seprate project.
11Community Buildings
Community building is proposed in layout of Sector 15 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project.
12Treatment and Disposal System of Sewage and Sullage water
Treatment and disposal system of sewage and sullage water is proposed in yojna layout Sector 18 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project.
13Solid Waste Management And Disposal System
Solid waste management and disposal system is proposed in layout Sector 15 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project.
14Water Conservation System
In the presence proposed PMAY housing scheme unit area of individual flat is very small thus water conservation system is not the part of this project.
15Energy Management System Including Use of Renewable Energy
n the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR.
16Fire Protection And Fire Safety System
In the present proposed PMAY Housing scheme Fire proctetion and fire safety system is not the part of approved DPR.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Public Amenities such as schools, hospitals etc are available in nearby vicinity
18Emergency Evacuation Services
Sufficient No of staircases is being proposed in the building
19Other Miscellaneous Work
Ample amount of open areas park etc are available in Sector 15 in Majhola No-4 (vistar) Moradabad.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 3 Jun 2023. 1 of them carries a revalidation.

Sanctioned by U.P. Awas Evam Vikas Parishad · 1,227 sqm of land · an approved plan of 3 blocks and 144 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
07602424 Dec 20183 Jun 20233 Jun 20233 Jun 2023—
0760243 Jun 20233 Jun 20233 Sept 20243 Jun 20233 Jun 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 3 Sept 2024.

#Granted fromExtended uptoNote
13 Jun 20233 Sept 2024—

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
308950Khasra
3071910Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 685/LAC/HQ/Dt 20/03/2010
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · 685/LAC/HQ/Dt 20/03/2010
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New4 Jun 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New4 Jun 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Jun 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New4 Jun 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New4 Jun 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New4 Jun 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Jun 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New14 Jul 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Jul 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New22 Jun 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Jun 2020 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Executive Engineer UPAVP MoradabadBankInduind BankBranchSai Tower Near Ekta DwarA/C no.IFSCINDB00001551
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad

Is Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad RERA registered?

Yes. Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered with UPRERA under registration number UPRERAPRJ685451, registered on 29 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad been completed?

UPRERA still lists Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad as Registered, so it is not shown as completed here. A completion certificate dated 2 Sept 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad more time to complete?

UPRERA's record carries 1 completion extension for Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad, the latest running to 3 Sept 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad located?

Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered in Moradabad, as filed with UPRERA.

What configurations are available in Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

The approved unit plan describes 3 blocks and 144 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

About 475 units per acre: 144 planned units across 0.30 acres (1,227 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗