Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad
Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Moradabad (RERA ID UPRERAPRJ685451). Registered with a completion deadline of 3 Sept 2024.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ685451 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 4 Jun 2020 |
| Project duration | 51 months |
| Address | Moradabad, Moradabad |
| Tehsil | Moradabad |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
076024
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Permit revalidated
076024
Building permit sanctioned
076024
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 Jul 2020 |
| Original completion | 3 Jun 2023 |
| Revised completion | 3 Sept 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 2 Sept 2024 |
| Registration fee | ₹11,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 144 | 23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · 1 BHK | 4 | 48 | 23 |
| 2 · 1 BHK | 4 | 48 | 23 |
| 3 · 1 BHK | 4 | 48 | 23 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The Plot is clearly demarcated in Sector 15 in Majhola No-4 (vistar) Moradabad as per the sanctioned layout the plot is situated facing 9.00 m wide road in layout. Apart from 12.00 m wide road and 6.00 m wide road are also proposed in layout encompassing this plot. |
| 2 | Boundary Wall Boundary wall is not included in the proposed projected. It will be constructed seprate project. |
| 3 | Road Work Road work for the whole scheme is sanctioned and tender processing is running for construction. In the proposed project of 144 Nos. of houses 6.00 meter wide road, 7.50 meter wide road 9.00 meter wide and 3.00 meter CC tiles road along two side periphere which is shown in layout is to be constructed as seperate project. |
| 4 | Footpaths Footpaths are not proposed in the sanctioned layout plan of the project. |
| 5 | Water Supply Including Drinking Water Facilities Over head tank and Water supply distribution system is sanctioned and tender proceesing is running for cosntruction this project which will be done at completion stage as seperate project. |
| 6 | Sewer System Sewer distribution system is sanctioned and tender proceesing is running for cosntruction this project which will be done at completion stage as seperate project trunk sewer line is laid alreay. |
| 7 | Drain Drainage system of whole scheme are in under project which is likely to be completed November 2020. Internal drain. |
| 8 | Parks Construction of boundary wall/RCC grill of the proposed park in the scheme is sanctioned and tendering is processing. Plantation work is already completed wire fencing is already completed. |
| 9 | Tree Planting Tree plantation in the scheme is under progress which will be done on roads and parks of the scheme. For the mentioned plot of PMAY 144 Nos. of houses plantation on 7.50 m and 9.00 m wide road and 6.00 m wide road will be done after drain and road work. |
| 10 | Design For Electric Supply Including Street Lighting Electric supply including street lighting is not included in the proposed projected. It will be constructed seprate project. |
| 11 | Community Buildings Community building is proposed in layout of Sector 15 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Treatment and disposal system of sewage and sullage water is proposed in yojna layout Sector 18 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project. |
| 13 | Solid Waste Management And Disposal System Solid waste management and disposal system is proposed in layout Sector 15 in Majhola No-4 (vistar) Moradabad. Which is not too far away from this project. |
| 14 | Water Conservation System In the presence proposed PMAY housing scheme unit area of individual flat is very small thus water conservation system is not the part of this project. |
| 15 | Energy Management System Including Use of Renewable Energy n the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR. |
| 16 | Fire Protection And Fire Safety System In the present proposed PMAY Housing scheme Fire proctetion and fire safety system is not the part of approved DPR. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Public Amenities such as schools, hospitals etc are available in nearby vicinity |
| 18 | Emergency Evacuation Services Sufficient No of staircases is being proposed in the building |
| 19 | Other Miscellaneous Work Ample amount of open areas park etc are available in Sector 15 in Majhola No-4 (vistar) Moradabad. |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 3 Jun 2023. 1 of them carries a revalidation.
Sanctioned by U.P. Awas Evam Vikas Parishad · 1,227 sqm of land · an approved plan of 3 blocks and 144 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 076024 | 24 Dec 2018 | 3 Jun 2023 | 3 Jun 2023 | 3 Jun 2023 | — | |
| 076024 | 3 Jun 2023 | 3 Jun 2023 | 3 Sept 2024 | 3 Jun 2023 | 3 Jun 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 3 Sept 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 3 Jun 2023 | 3 Sept 2024 | — |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 308 | 950 | Khasra |
| 307 | 1910 | Khasra |
| Allotment letter from the authority · 685/LAC/HQ/Dt 20/03/2010 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 685/LAC/HQ/Dt 20/03/2010 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Jun 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 4 Jun 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Jun 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Jun 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Jun 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Jun 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Jun 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 14 Jul 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 14 Jul 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 22 Jun 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Jun 2020 ↗ |
Quarterly progress reports
18 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Moradabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Executive Engineer UPAVP MoradabadBankInduind BankBranchSai Tower Near Ekta DwarA/C no.IFSCINDB00001551 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad
Is Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad RERA registered?
Yes. Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered with UPRERA under registration number UPRERAPRJ685451, registered on 29 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad been completed?
UPRERA still lists Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad as Registered, so it is not shown as completed here. A completion certificate dated 2 Sept 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad more time to complete?
UPRERA's record carries 1 completion extension for Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad, the latest running to 3 Sept 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad located?
Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered in Moradabad, as filed with UPRERA.
What configurations are available in Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
The approved unit plan describes 3 blocks and 144 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Construction of 144 nos Flats ( G+3) under PM Avas Yojna at Sec-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
About 475 units per acre: 144 planned units across 0.30 acres (1,227 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗