Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad

UPRERARegistered

Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Moradabad (RERA ID UPRERAPRJ831366). Registered with a completion deadline of 31 Oct 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ831366
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start15 Oct 2022
Project duration37 months
AddressMoradabad, Moradabad
TehsilMoradabad
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    16070/YM-3/114

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Sept 2022
Original completion31 Oct 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 Oct 2025
Registration fee₹2,99,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MUKESH KUMAR RUHELA
License CA/2002/29652
NEEL GIRI COMPLEX INDIRA NAGAR LUCKNOW
Engineer
NIL
NEELGIRI COMPLEX INDIRA NAGAR LUCKNOW
Contractor
EE CD RUHELKHAND TWO
OFFICE COMPLEX SECTOR-5 MAJHOLA YOJNA NO-4 PH-2 MBD
Sr.Development work declared to RERA
1Demarcation of Plots
Yes
2Boundary Wall
No
3Road Work
Work in completed
4Footpaths
Work in progress
5Water Supply Including Drinking Water Facilities
Work in progress
6Sewer System
Work in progress
7Drain
Work in progress
8Parks
Work in progress
9Tree Planting
Work in completed
10Design For Electric Supply Including Street Lighting
Work in progress
11Community Buildings
No
12Treatment and Disposal System of Sewage and Sullage water
No
13Solid Waste Management And Disposal System
No
14Water Conservation System
No
15Energy Management System Including Use of Renewable Energy
No
16Fire Protection And Fire Safety System
No
17Social Infrastructure And Other Public Amenities Including Public Health Services
No
18Emergency Evacuation Services
No
19Other Miscellaneous Work
No
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Oct 2025.

Sanctioned by U.P. Awas Evam Vikas Parishad · 58,745 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
16070/YM-3/1148 Sept 202231 Oct 20258 Sept 202231 Oct 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
804, 805, 80758750Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 0
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New13 Sept 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Sept 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Sept 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 Sept 2022 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New13 Sept 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New25 Sept 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Sept 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New25 Sept 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New25 Sept 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New13 Sept 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New26 Sept 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Sept 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New25 Sept 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New25 Sept 2022 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2025-Q3.

QuarterConstructionCertificates
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP Moradabad Majhola Yojna No-04, Bhag-02 (Vistar)(2nd Phase) Sector-15 and 16 (370+70) Total 440 Nos Residential Plots Collection AccountBankIndusInd BankBranchSai Tower Ekta Dwar Civil Lines MoradabadBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP MORADABAD Majhola Yojna No-04, Bhag-2 (Vistar) (2nd Phase) Sector-15 and 16 (370+70) Total 440 Nos Residential Plots Separate AccountBankIndusInd BankBranchSai Tower Ekta Dwar Civil Lines MoradabadBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP MORADABAD Majhola Yojna No-04 Bhag-2 (Vistar) (2nd Phase) Sector-15 and 16(370+70) Total 440 Nos Residential Plots Transaction AccountBankIndusInd BankBranchSai Tower Ekta Dwar Civil Lines MoradabadBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad

Is Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad RERA registered?

Yes. Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered with UPRERA under registration number UPRERAPRJ831366, registered on 30 Sept 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad been completed?

UPRERA still lists Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad as Registered, so it is not shown as completed here. A completion certificate dated 29 Oct 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad located?

Residential Plots 370 in Sector-15 and Residential Plots 70 in Sector-16 Total Residential Plots 440 No in Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered in Moradabad, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗