Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad
Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Moradabad (RERA ID UPRERAPRJ601076). Registered with a completion deadline of 26 Feb 2026.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ601076 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 26 Feb 2023 |
| Project duration | 37 months |
| Address | Moradabad, Moradabad |
| Tehsil | Moradabad |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
076024
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Apr 2023 |
| Original completion | 26 Feb 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 25 Feb 2026 |
| Registration fee | ₹27,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 432 | 23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 9 · 1 BHK | 4 | 432 | 23 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots YES |
| 2 | Boundary Wall BOUNDARY WALL WILL BE CONSTRUCTED WORK IN FUTURE |
| 3 | Road Work IN PMAY CAMPUS AS PER GUIDELINES 3.5 MTR WIDE AND 15 CM THICK CC ROAD PROPOSED |
| 4 | Footpaths NOT PROVISION IN LAYOUT PLAN |
| 5 | Water Supply Including Drinking Water Facilities DI WATER SUPPLY LINE LAID IN PMAY CAMPUS AND 110 MM PVC PIPE FOR WATER SUPPLY WILL BE LAID AND OHT WORK COMPLETE |
| 6 | Sewer System IN PMAY CAMPUS 250 MM DIA NP-2 AND NP-3 CLASS PIPE WILL BE LAID IN FUTURE AT 1.5 MTR DEPTH FROM GROUND LEVEL |
| 7 | Drain DESIGN WORK OF DRAIN IN PROGRESS IN PMAY CAMPUS 230 MM WIDE BRICK DRAIN PROVISION |
| 8 | Parks YES DIFFERENT TYPE OF PLANTS PLANTED IN PARKS AND BOUNDARY WALLL OF PARK IS COMPLETED IN BRICK WORK |
| 9 | Tree Planting YES DIFFERENT TYPE OF PLANTS PLANTED |
| 10 | Design For Electric Supply Including Street Lighting WORK IN PROGRESS |
| 11 | Community Buildings NOT PROVISION IN PLAN |
| 12 | Treatment and Disposal System of Sewage and Sullage water TRUNK AND INTERNAL SEWER LINE IS LAID |
| 13 | Solid Waste Management And Disposal System WILL BE PROVISION IN FUTURE AFTER POSSESION OF ALLOTY |
| 14 | Water Conservation System NO |
| 15 | Energy Management System Including Use of Renewable Energy NO |
| 16 | Fire Protection And Fire Safety System NO |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NO |
| 18 | Emergency Evacuation Services NO |
| 19 | Other Miscellaneous Work NO |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 26 Feb 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 4,309 sqm of land · an approved plan of 1 block and 432 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 076024 | 21 Nov 2022 | 26 Feb 2026 | 21 Nov 2022 | 26 Feb 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 804, 805, 308 | 58750 | Khasra |
| Allotment letter from the authority · 685 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 29 Mar 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 29 Mar 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 29 Mar 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 19 Apr 2023 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 29 Mar 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 19 Apr 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Mar 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Mar 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Mar 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 29 Mar 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 29 Mar 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 29 Mar 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 29 Mar 2023 ↗ |
Quarterly progress reports
12 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
12 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Moradabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP MAJHOLA YOJ. NO-04, BHAG-2 (VISTAR) SEC-15, PMAY 432 (G+3) HOUSES COLLECTION ACCOUNTBankIndusInd BankBranchMoradabadBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP MAJHOLA YOJ. NO-04, BHAG-02 (VISTAR) SEC-15, PMAY 432 (G+3) HOUSES SEPARATE ACCOUNTBankIndusInd BankBranchMoradabadBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP MAJHOLA YOJ. NO-04, BHAG-02 (VISTAR) SEC-15, PMAY 432 (G+3) HOUSES TRANSACTION ACCOUNTBankIndusInd BankBranchMORADABADBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad
Is Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad RERA registered?
Yes. Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered with UPRERA under registration number UPRERAPRJ601076, registered on 25 Apr 2023. Estanzo reproduces that filing; it does not verify the work behind it.
Has Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad been completed?
UPRERA still lists Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad as Registered, so it is not shown as completed here. A completion certificate dated 25 Feb 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad located?
Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered in Moradabad, as filed with UPRERA.
What configurations are available in Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
The approved unit plan describes 1 block and 432 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
About 406 units per acre: 432 planned units across 1.06 acres (4,309 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗