Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad

UPRERARegistered

Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Moradabad (RERA ID UPRERAPRJ601076). Registered with a completion deadline of 26 Feb 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ601076
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start26 Feb 2023
Project duration37 months
AddressMoradabad, Moradabad
TehsilMoradabad
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    076024

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered25 Apr 2023
Original completion26 Feb 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary25 Feb 2026
Registration fee₹27,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors432 · 1 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK43223
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
9 · 1 BHK443223
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MUKESH RUHELA
License CA/2002/29652
NILGIRI COMPLEX INDRA NAGAR LUCKNOW
Engineer
SAJNAY JAISWAL
11/165 VASHUNDHARA GHAZIABAD
Contractor
UP AVAS VIKAS PARISHAD
OFFICE COMPLEX 1st FLOOR SECTOR-5 MAJHOLA YOJNA NO-4 PH-2 MORADABAD
Sr.Development work declared to RERA
1Demarcation of Plots
YES
2Boundary Wall
BOUNDARY WALL WILL BE CONSTRUCTED WORK IN FUTURE
3Road Work
IN PMAY CAMPUS AS PER GUIDELINES 3.5 MTR WIDE AND 15 CM THICK CC ROAD PROPOSED
4Footpaths
NOT PROVISION IN LAYOUT PLAN
5Water Supply Including Drinking Water Facilities
DI WATER SUPPLY LINE LAID IN PMAY CAMPUS AND 110 MM PVC PIPE FOR WATER SUPPLY WILL BE LAID AND OHT WORK COMPLETE
6Sewer System
IN PMAY CAMPUS 250 MM DIA NP-2 AND NP-3 CLASS PIPE WILL BE LAID IN FUTURE AT 1.5 MTR DEPTH FROM GROUND LEVEL
7Drain
DESIGN WORK OF DRAIN IN PROGRESS IN PMAY CAMPUS 230 MM WIDE BRICK DRAIN PROVISION
8Parks
YES DIFFERENT TYPE OF PLANTS PLANTED IN PARKS AND BOUNDARY WALLL OF PARK IS COMPLETED IN BRICK WORK
9Tree Planting
YES DIFFERENT TYPE OF PLANTS PLANTED
10Design For Electric Supply Including Street Lighting
WORK IN PROGRESS
11Community Buildings
NOT PROVISION IN PLAN
12Treatment and Disposal System of Sewage and Sullage water
TRUNK AND INTERNAL SEWER LINE IS LAID
13Solid Waste Management And Disposal System
WILL BE PROVISION IN FUTURE AFTER POSSESION OF ALLOTY
14Water Conservation System
NO
15Energy Management System Including Use of Renewable Energy
NO
16Fire Protection And Fire Safety System
NO
17Social Infrastructure And Other Public Amenities Including Public Health Services
NO
18Emergency Evacuation Services
NO
19Other Miscellaneous Work
NO
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Feb 2026.

Sanctioned by U.P. Awas Evam Vikas Parishad · 4,309 sqm of land · an approved plan of 1 block and 432 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
07602421 Nov 202226 Feb 202621 Nov 202226 Feb 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
804, 805, 30858750Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 685
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Mar 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Mar 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Mar 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New19 Apr 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New29 Mar 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New19 Apr 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Mar 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Mar 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Mar 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Mar 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Mar 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Mar 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Mar 2023 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2025-Q3.

QuarterConstructionCertificates
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP MAJHOLA YOJ. NO-04, BHAG-2 (VISTAR) SEC-15, PMAY 432 (G+3) HOUSES COLLECTION ACCOUNTBankIndusInd BankBranchMoradabadBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP MAJHOLA YOJ. NO-04, BHAG-02 (VISTAR) SEC-15, PMAY 432 (G+3) HOUSES SEPARATE ACCOUNTBankIndusInd BankBranchMoradabadBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP MAJHOLA YOJ. NO-04, BHAG-02 (VISTAR) SEC-15, PMAY 432 (G+3) HOUSES TRANSACTION ACCOUNTBankIndusInd BankBranchMORADABADBranch addressSai Tower Ekta Dwar Civil Lines MoradabadBranch districtMoradabad, Uttar PradeshA/C no.IFSCINDB0000151
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad

Is Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad RERA registered?

Yes. Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered with UPRERA under registration number UPRERAPRJ601076, registered on 25 Apr 2023. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad been completed?

UPRERA still lists Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad as Registered, so it is not shown as completed here. A completion certificate dated 25 Feb 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad located?

Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered in Moradabad, as filed with UPRERA.

What configurations are available in Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

The approved unit plan describes 1 block and 432 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of 432 No Flat (G+3) under PMAY at Sector-15 Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?

About 406 units per acre: 432 planned units across 1.06 acres (4,309 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗