Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad
Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Moradabad (RERA ID UPRERAPRJ15332). Registered with a completion deadline of 30 Jun 2021.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ15332 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Apr 2018 |
| Project duration | 39 months |
| Address | Moradabad, Moradabad |
| Tehsil | Moradabad |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
073058
Building permit sanctioned
073058
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 27 Feb 2018 |
| Original completion | 31 May 2020 |
| Revised completion | 30 Jun 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 Jul 2021 |
| Registration fee | ₹17,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 288 | 22 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 6 · 1 BHK | 1 | 288 | 22 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots YES |
| 2 | Boundary Wall NO |
| 3 | Road Work YES |
| 4 | Footpaths NO |
| 5 | Water Supply Including Drinking Water Facilities YES |
| 6 | Sewer System YES |
| 7 | Drain YSE |
| 8 | Parks YES |
| 9 | Tree Planting YES |
| 10 | Design For Electric Supply Including Street Lighting YES |
| 11 | Community Buildings NO |
| 12 | Treatment and Disposal System of Sewage and Sullage water YES |
| 13 | Solid Waste Management And Disposal System NO |
| 14 | Water Conservation System YES |
| 15 | Energy Management System Including Use of Renewable Energy NO |
| 16 | Fire Protection And Fire Safety System NO |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NO |
| 18 | Emergency Evacuation Services NO |
| 19 | Other Miscellaneous Work NO |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Nov 2020. It carries a revalidation, valid to 15 Nov 2020.
Sanctioned by U.P. Awas Evam Vikas Parishad · 2,453 sqm of land · an approved plan of 1 block and 288 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 073058 | 20 Feb 2018 | 15 Nov 2020 | 15 Nov 2020 | 31 May 2020 | 20 Feb 2018 valid to 15 Nov 2020 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Jun 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 May 2020 | 30 Nov 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Nov 2020 | 30 Jun 2021 | — |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| SECTOR 16 | 2453 | — |
| 324 | 6450 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 20 Mar 2010.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 0 | 20 Mar 2010 | self | — |
| Allotment letter from the authority · 01/10/2015 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Passion given by ADM Dt 01-10-2015 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 22 Dec 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 22 Dec 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 22 Dec 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 22 Dec 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 22 Dec 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Health service | NO |
| Renewable energy | NO |
| Other facilities | NO |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Moradabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | EXECUTIVE ENGINEER CD-25 MORADABADBankCANARA BANKBranchCANARA BANKA/C no.IFSCCRNB0002708 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
Common questions about Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad
Is Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad RERA registered?
Yes. Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered with UPRERA under registration number UPRERAPRJ15332, registered on 27 Feb 2018. Estanzo reproduces that filing; it does not verify the work behind it.
Has Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad been completed?
UPRERA still lists Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad as Registered, so it is not shown as completed here. A completion certificate dated 29 Jul 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad more time to complete?
UPRERA's record carries 2 completion extensions for Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad, the latest running to 30 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad located?
Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad is registered in Moradabad, as filed with UPRERA.
What configurations are available in Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
The approved unit plan describes 1 block and 288 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Construction of 288 Nos Flats (G+3) Multystoried under Pradhanmantri Avas Yojna at Sector-16, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad?
About 475 units per acre: 288 planned units across 0.61 acres (2,453 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗