Construction of 38 Nos 75/200 type semifinished ho

UPRERARegistered

Construction of 38 Nos 75/200 type semifinished ho is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Moradabad (RERA ID UPRERAPRJ9352). Registered with a completion deadline of 31 Dec 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9352
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Jan 2017
Original start1 Jan 2017
Project duration24 months
AddressMoradabad, Moradabad
TehsilMoradabad
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Aug 2017
Original completion31 Dec 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary30 Mar 2019
Registration fee₹43,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors38 · 1 · 1 (units from plan)
ConfigurationUnitsCarpet area
OTHER3862
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Sector-12 · OTHER13862
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Gopal Garg
License Architect Unit-II
Architect Unit-II UPAVP Indira Nagar Lucknow
Engineer
J.P. DWIVEDI
Construction Division 24 UPAVP Lajpat Nagar Moradabad
Contractor
M/s S.S. Solanki Construction
E-24 Ravi Khand Sharda nagar Thana Ashiyana Bangla Bazar Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Done as per Sanctioned Layout Plan
2Boundary Wall
To be Constructed as per Design/Estimate
3Road Work
Already Done in Sector-142 as per Layout Plan
4Footpaths
N. A.
5Water Supply Including Drinking Water Facilities
Already Provided in Sector-12 as per Design/Planing
6Sewer System
Already Provided in Sector-12 as per Design/Planing
7Drain
Already Provided in Sector-12 as per Design/Planing
8Parks
Already Constructed in Sector-12 as per Layout Plan
9Tree Planting
Already Planted in Parks, Along Road Side and Green Belt of Sector-12
10Design For Electric Supply Including Street Lighting
Yes Already Done in Sector-12
11Community Buildings
N. A.
12Treatment and Disposal System of Sewage and Sullage water
Yes as per Design/Planing
13Solid Waste Management And Disposal System
N. A.
14Water Conservation System
Yes
15Energy Management System Including Use of Renewable Energy
N. A.
16Fire Protection And Fire Safety System
N. A.
17Social Infrastructure And Other Public Amenities Including Public Health Services
N. A.
18Emergency Evacuation Services
N. A.
19Other Miscellaneous Work
N. A.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 31 Dec 2018.

Sanctioned by U.P. Awas Evam Vikas Parishad · 7,600 sqm of land · an approved plan of 1 block and 38 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
288/A5/14525 Jan 201731 Dec 201831 Dec 201831 Dec 2018
288/A5/14525 Jan 201731 Dec 201831 Dec 201831 Dec 2018
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗

Land & documents

26 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
812, 813, 814/1, 814/2, 814/3, 814/4, 814/5, 814/649860.00Khasra
815 & 82824280.00Khasra
184, 185, 186, 187, 188, 189, 199, 200, 201, 202,13500.00Khasra
204, 205, 206, 207, 231 & 2365880.00Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1420-1425
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1422-1427
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · Possession Letter of Gram Shahpur Tigri
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Possession Letter of Gram Shahpur Tigri
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Possession Letter of Gram Shahpur Tigri
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Possession Letter of Gram Lakri Fazalpur
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Possession Letter of Gram Lakri Fazalpur
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Possession Letter of Gram Lakri Fazalpur
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New3 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New19 Mar 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New3 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old22 Feb 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old22 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old22 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old22 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old22 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old22 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old22 Feb 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old22 Feb 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old22 Feb 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterBy OHT

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Executive Engineer CD 24 UPAVP MoradabadBankIndian Overseas BankBranchIOB Lajpat NagarA/C no.IFSCIOBA0001555
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Filed document
viewprojects · 33
Registry Document In Case of Own Land
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 32
Legal Document of Agreement in Case of other Land
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 31
Legal Document of Agreement in Case of other Land
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 30
Legal Document of Agreement in Case of other Land
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 29
Legal Document of Agreement in Case of other Land
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 28
Legal Document of Agreement in Case of other Land
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 27
Legal Document of Agreement in Case of other Land
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 26
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)
newly filed with RERA
3 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 38 Nos 75/200 type semifinished ho

Is Construction of 38 Nos 75/200 type semifinished ho RERA registered?

Yes. Construction of 38 Nos 75/200 type semifinished ho is registered with UPRERA under registration number UPRERAPRJ9352, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of 38 Nos 75/200 type semifinished ho been completed?

UPRERA still lists Construction of 38 Nos 75/200 type semifinished ho as Registered, so it is not shown as completed here. A completion certificate dated 30 Mar 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of 38 Nos 75/200 type semifinished ho?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 38 Nos 75/200 type semifinished ho with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Construction of 38 Nos 75/200 type semifinished ho have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 38 Nos 75/200 type semifinished ho located?

Construction of 38 Nos 75/200 type semifinished ho is registered in Moradabad, as filed with UPRERA.

What configurations are available in Construction of 38 Nos 75/200 type semifinished ho?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of 38 Nos 75/200 type semifinished ho?

The approved unit plan describes 1 block and 38 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of 38 Nos 75/200 type semifinished ho?

About 20 units per acre: 38 planned units across 1.88 acres (7,600 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗