CRC Joyous is a RERA-registered residential project by CRC Homes Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ613747). Registered with a completion deadline of 27 Sept 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ613747 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Nov 2022 |
| Project duration | 59 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | Registered Office Address- SHOP NO. 111, VARDHMAN MAYUR MARKET KONDLI MAYUR VIHAR PHASE-III, DELHI 110096 Corporate Office Address- GROUND FLOOR, LOGIX TECHNO PARK SECTOR-127 NOIDA. 201301 Site Address- GH-8A TECHZONE-IV GREATER NOIDA WEST. 201306 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
PLG/BP/SM-22-Jul-2020.8412
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 Nov 2022 |
| Original completion | 27 Sept 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹82,500 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK308 56%
- 2 BHK125 23%
- 4 BHK102 19%
- SHOP11 2%
- 1 BHK1 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 11 | 17-31 |
| 3 BHK | 308 | 81-161 |
| 2 BHK | 125 | 59-80 |
| 4 BHK | 102 | 92-189 |
| 1 BHK | 1 | 50 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Tower-1 · SHOP, 3 BHK, 2 BHK | 28 | 162 | 22-161 |
| Tower-2 · 2 BHK, 4 BHK | 27 | 104 | 80-189 |
| Tower-3 · SHOP, 3 BHK, 2 BHK | 28 | 161 | 17-161 |
| Tower-4 · 2 BHK, 1 BHK | 20 | 120 | 50-70 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The Plot No. GH-08 A Techzone -IV, Greater NOIDA (West) had been demarcated by Greater NOIDA Industrial Development Authority (GNIDA). |
| 2 | Boundary Wall A boundary wall of RCC / Brick of thickness 115 mm /230/150 mm and ht of 1800 mm with Plaster and railing will be prepared. |
| 3 | Road Work Access driveway to all the towers will be provided and that driveway will be of pavers M 30 grade with thickness of 65 mm and 100 mm kerb stone on sides if required. An entry of tower, there will be pattern as per design. |
| 4 | Footpaths Footpath will be provided using 40-50 mm paver wherever required. |
| 5 | Water Supply Including Drinking Water Facilities Greater NOIDA Industrial Development Authority (GNIDA) shall supply water for the entire society, and it shall be collected in underground water tanks of 100 KL X 2 Nos Domestic Water and 100 KL X2 Nos Raw water Tanks and water with 65 mm dia pipes to overhead tanks at respective Towers. WTP will ne equipped with Hydro pneumatic pump with GI ring and riser. |
| 6 | Sewer System STP of 330 KL capacity will be constructed using RCC and required Pump Room, STP treated water will be used in flushing system and Gardening. |
| 7 | Drain Storm Water Drainage system will be constructed using 400 mm dia pipes as per drawing. |
| 8 | Parks Landscape with civil work masonry 115/ 230 mm and stone, paver, grass and various type of plantation, shrubs. |
| 9 | Tree Planting Tree plantation will be as per sanctioned plan in which 50 percent trees will be evergreen trees. |
| 10 | Design For Electric Supply Including Street Lighting HT electrical supply will be provided by NPCL, substation consisting of 2 Nos 1250 KVA and 1 X1010 KVA Transformers ,
LT Panel and 2 nos. X 1500 KVA DG Set will be there.
Street lighting will be done using LT supply and Power Backup. |
| 11 | Community Buildings Community Building will be made as per approved building plan and there will be Multipurpose Hall, Indoor games, Gym, Entrance lobby etc. Floor will be Stilt, Podium and First. |
| 12 | Treatment and Disposal System of Sewage and Sullage water 330 KL STP will be installed as per Sanctioned drawing. All sewerage will be treated and treated water will be used for landscaping and flushing system. |
| 13 | Solid Waste Management And Disposal System Collection, Storage and disposal will be done manually, and disposal will be done as per norms. |
| 14 | Water Conservation System 5 nos. rain Water harvesting system is being provided to conserve rain water and dual flush system will also be provided. |
| 15 | Energy Management System Including Use of Renewable Energy usage of LED lights will be used all over the project and use of solar lights will also be explored. |
| 16 | Fire Protection And Fire Safety System "In compliance to the National Building Code of India 2016, part IV requirements, Fire protection and safety system consisting of-
Underground Fire Tanks of 280 X 2 = 560m3
Each tower having 10m3 fire overhead water tank and Club having 30m3 fire overhead water tank storage.
Main electric fire Hydrant and sprinkler Pumps provided of 2850 LPM each.
Jockey pump for Hydrant and Sprinkler Pumps of 180 LPM each.
Diesel Engine Fire Pump of 2850 LPM.
Water certain pump of 2850 LPM
Club Terrace having 900 LPM pump.
All project sprinkler system provided in compliance to IS codes and project fire safety requirements aligned to NBC 2016 Part-IV". |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social gathering places in the community building are being provided. |
| 18 | Emergency Evacuation Services YES, Refuge area provided at every tower on 18th floor in addition to Main and Fire Staircase. |
| 19 | Other Miscellaneous Work Proper Security system including Security Guard, CCTV Cameras and controlled access will be made available. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 27 Sept 2027.
Sanctioned by Greater Noida Authority · 15,490 sqm of land · an approved plan of 4 blocks and 547 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| PLG/BP/SM-22-Jul-2020.8412 | 28 Sept 2022 | 27 Sept 2027 | 27 Sept 2032 | 27 Sept 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-08A, Sector Techzone IV, Greater NOIDA (West), Gautam Buddha Nagar, Uttar Pradesh, PIN-201318 | 42006 | Plot |
| Lease deed · 6163 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 35759 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Allotment letter from the authority · Land Title Search Report The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Affidavit ( Sale) The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · 35420 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Reply Letter to UPRERA regarding Objection of Project Registration The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 15 Oct 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 15 Oct 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 15 Oct 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 15 Oct 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 15 Oct 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 15 Oct 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 15 Oct 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 3 Nov 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 15 Oct 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 15 Oct 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Oct 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 15 Oct 2022 ↗ |
Quarterly progress reports
15 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
15 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 66% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 79% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 99% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | CRC Homes Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM137312 |
| PAN | AAICC8998A |
| CIN / TAN | DELC21422C |
| Name of chairman | Mr. Satish Garg |
| Registered address | Registered Office Address- SHOP NO. 111, VARDHMAN MAYUR MARKET KONDLI MAYUR VIHAR PHASE-III, DELHI 110096 Corporate Office Address- GROUND FLOOR, LOGIX TECHNO PARK SECTOR-127 NOIDA. 201301 Site Address- GH-8A TECHZONE-IV GREATER NOIDA WEST. 201306 |
| RERA contact | |
| Registered since | 2021 |
| Legal name | HABITECH INFRASTRUCTURE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address- 139-A,Pocket C ,Mayur Vihar Phase -II, New Delhi -110091 Corporate Office Address- Crystal Mall, Ground floor, Plot no-9, Knowledge Park-3, Greater Noida, PIN-201310 Site Address- GH-8A TECHZONE-IV GREATER NOIDA WEST, U.P.PIN- 201306 |
| RERA contact |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | CRC Homes Private Limited Collection Account for CRC JoyousBankKotak Mahindra Bank Ltd.BranchSector 18, NOIDABranch addressAnsals Fortune Arcade, Sector 18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0005033 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | CRC Homes Private Limited Separate Bank Account for CRC JoyousBankKotak Mahindra Bank LimitedBranchSector 18, NOIDABranch addressAnsal Fortune Arcade, Sector 18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0005033 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | CRC Homes Private Limited RERA Transaction Account for CRC JoyousBankKotak Mahindra Bank LimitedBranchSector 18, NOIDABranch addressAnsal Fortune Arcade, Sector 18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0005033 |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Filed document viewprojects · 16 | ENGINEERS CERTIFICATE newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 15 | ARCHITECT CERTIFICATE newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 14 | CA CERTIFICATE newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 13 | Affidavit (Form-B) newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 12 | Development Work Plan newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 11 | Electricity Supply Plan newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 10 | Water Supply Plan newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 9 | Waste Disposal Plan newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 8 | Proforma of Conveyance Deed newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 7 | Proforma of Allotment Letter newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 6 | Proforma of Application Form newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 5 | Other Plan(If Any) newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 4 | Commencement Certificate newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 3 | Details of Encumbrances newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 2 | Other newly filed with RERA | 15 Oct 2026 |
| Filed document viewprojects · 1 | Proforma of Completion Certificate(Occupancy) newly filed with RERA | 15 Oct 2026 |
| Filed document summary · 17 | Details of Encumbrances no longer on the record | 15 Oct 2026 |
| Filed document summary · 16 | Commencement Certificate no longer on the record | 15 Oct 2026 |
| Filed document summary · 15 | Proforma of Application Form no longer on the record | 15 Oct 2026 |
| Filed document summary · 14 | Proforma of Allotment Letter no longer on the record | 15 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about CRC Joyous
Is CRC Joyous RERA registered?
Yes. CRC Joyous is registered with UPRERA under registration number UPRERAPRJ613747, registered on 4 Nov 2022. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for CRC Joyous?
The completion date filed with UPRERA is 27 Sept 2027. No completion certificate is on record yet.
Who is the builder of CRC Joyous?
CRC Homes Private Limited is the promoter entity that filed CRC Joyous with UPRERA (promoter RERA ID UPRERAPRM137312). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does CRC Joyous have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is CRC Joyous located?
CRC Joyous is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in CRC Joyous?
The unit plan filed with UPRERA lists SHOP, 3 BHK, 2 BHK, 4 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in CRC Joyous?
The approved unit plan filed with UPRERA runs from 17 to 189 m² of carpet area (about 181 to 2,035 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in CRC Joyous?
The approved unit plan describes 4 blocks and 547 units of which 536 are homes and 11 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is CRC Joyous?
About 143 units per acre: 547 planned units across 3.83 acres (15,490 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗