Eldeco La Vida Bella

UPRERARegistered

Eldeco La Vida Bella is a RERA-registered residential project by Eldeco Real Estate Limited in Sector 12, Gautam Budh Nagar (RERA ID UPRERAPRJ136219). Registered with a completion deadline of 16 Jan 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
52.2%Q3'25
41.99%Q4'25
64.87%Q1'26
71.01%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ136219
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Feb 2024
Project duration60 months
AddressGH-02 C, sector 12, Greater Noida, Sector 12, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant address201-212, Splendor Forum, IInd Floor, Jasola District Centre, New Delhi-110025
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    PLG/BP SM-22-AUG-2023:19040

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Apr 2024
Original completion16 Jan 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹80,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors380 · 6 · 25 (units from plan)
Homes · commercial units368 · 12 (shops and offices filed in the same plan)
  • 3 BHK260 68%
  • 4 BHK65 17%
  • 5 BHK22 6%
  • 2 BHK21 6%
  • SHOP12 3%
ConfigurationUnitsCarpet area
SHOP1215-19
3 BHK260103-126
2 BHK2177-84
4 BHK65148-155
5 BHK22178
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BELLISIMO 01 · OTHER, 3 BHK, 2 BHK259277-103
BELLISIMO 2 · OTHER, 2 BHK, 3 BHK259277-103
BELLISIMO 3 · OTHER, 3 BHK, 2 BHK259277-103
COMMERCIAL ARCADE MAGNIFICO · SHOP41215-19
MAGNIFICO 1 · OTHER, 3 BHK, 4 BHK2546121-148
MAGNIFICO 2 · OTHER, 5 BHK, 3 BHK, 4 BHK2546121-178
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
BIAS PLUS Architecture
License CA / 93/ 16665
502,T12, CWG Village, New Delhi 110092
Engineer
TPC Ltd.
Sector 52, Noida
Contractor
NORTH EAST RURAL DEVELOPERS LLP
D-9, DW-013, ALPHA DROM WORKSHALA, SECTOR 3, NOIDA, UP 201301
Sr.Development work declared to RERA
1Demarcation of Plots
Plot is a part of an existing approved colony and is well demarcated at the site.
2Boundary Wall
Boundary/ Railing shall be as per design.
3Road Work
C.C. internal roads along with side pavements shall be constructed as per approved layout.
4Footpaths
Continuous linked pathways in the complex provided to enable people to have a walkable neighborhood.
5Water Supply Including Drinking Water Facilities
Water from Underground water tank shall be pumped to the terrace tanks. A well designed plumbing system shall be there to supply drinking water to the units through down comer.
6Sewer System
A well designed sewerage system shall be laid to collect soil water/ waste which in turn connect to the existing sewer main line.
7Drain
A well designed system of covered and underground drainage system shall be in place.
8Parks
All the green pockets shall have grass covered with a minimum paved area and sitting/ play arrangements. Low height plantation shall be part of it.
9Tree Planting
4.5 to 6m high trees shall be along main running internal roads.
10Design For Electric Supply Including Street Lighting
Connection from LESA to be obtained for required load for street lighting and complex requirement in general
11Community Buildings
A well designed community building is the part of the scheme.
12Treatment and Disposal System of Sewage and Sullage water
A well designed STP in place to take care of sewage and sullage water
13Solid Waste Management And Disposal System
Collection/ Disposal of solid waste shall be co-ordinated with Greater Noida Nagar Nigam
14Water Conservation System
All terrace storm water shall be harvested to recharge underground water. Water waste shall be recycled and used for gardening/ irrigation.
15Energy Management System Including Use of Renewable Energy
25 percent of the street lights shall have solar energy back up. Common area light shall be Brightness sensitive to save energy.
16Fire Protection And Fire Safety System
A well designed fire fighting/ evacuation arrangement shall be in place with fire alarm system, pressurized fire escapes, dow-comers and fire extinguishers
17Social Infrastructure And Other Public Amenities Including Public Health Services
Club and kids play area shall be provided
18Emergency Evacuation Services
All the exit points with adequate width as per norms available to facilitate evacuation in case of an emergency.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 16 Jan 2029. 1 of them carries a revalidation, valid to 24 Apr 2030.

Sanctioned by Greater Noida Authority · 14,998 sqm of land · an approved plan of 6 blocks and 380 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
PLG/BD/SM/22-Aug-2023-1904017 Jan 202416 Jan 202916 Jan 202916 Jan 2029—
PLG/BP SM-22-AUG-2023:1904017 Jan 202416 Jan 202924 Apr 203516 Jan 202917 Jan 2024
valid to 24 Apr 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

24 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH02C, sector 12, greater noida14998Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 24763
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 1
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 1
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 1
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 1
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · 1
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Jan 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Jan 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Jan 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New22 Jan 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Jan 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New20 Jan 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 Jan 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New22 Jan 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Jan 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New15 Mar 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New14 Mar 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New14 Mar 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New3 Feb 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New22 Jan 2024 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.

QuarterConstructionCertificates
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q252.2%CA ↗ · Arch ↗ · Eng ↗
2025-Q341.99%CA ↗ · Arch ↗ · Eng ↗
2025-Q464.87%CA ↗ · Arch ↗ · Eng ↗
2026-Q171.01%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameEldeco Real Estate Limited
RolePromoter · current
RERA IDUPRERAPRM273920
PANAAGCA7515F
CIN / TANU45400DL2007PLC163848
Name of chairmanVimal Kumar Behl
Registered address201-212, Splendor Forum, IInd Floor, Jasola District Centre, New Delhi-110025
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ELDECO REAL ESTATE LTD - COLL A/C FOR ELDECO LA VIDA BELLA-ESCBankHDFC BANK LIMITEDBranchELDECO STUDIO APARTMENTBranch addressPLOT NO. 3, ELDECO STUDIO APARTMENT SECTOR 93A,Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002830Branch emailfarahnaaz.khan@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ELDECO REAL ESTATE LTD - SEP A/C FOR ELDECO LA VIDA BELLA- ESCBankHDFC BANK LIMITEDBranchELDECO STUDIO APARTMENTBranch addressPLOT NO. 3, ELDECO STUDIO APARTMENT, SECTOR 93ABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002830
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ELDECO REAL ESTATE LTD - TRAN A/C FOR ELDECO LA VIDA BELLA-ESCBankHDFC BANK LIMITEDBranchELDECO STUDIO APRATMENTBranch addressPLOT NO. 3, ELDECO STUDIO APARTMENT, SECTOR-93ABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002830
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eldeco La Vida Bella

Is Eldeco La Vida Bella RERA registered?

Yes. Eldeco La Vida Bella is registered with UPRERA under registration number UPRERAPRJ136219, registered on 26 Apr 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Eldeco La Vida Bella?

The completion date filed with UPRERA is 16 Jan 2029. No completion certificate is on record yet.

Who is the builder of Eldeco La Vida Bella?

Eldeco Real Estate Limited is the promoter entity that filed Eldeco La Vida Bella with UPRERA (promoter RERA ID UPRERAPRM273920). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Eldeco La Vida Bella have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Eldeco La Vida Bella located?

Eldeco La Vida Bella is registered in Sector 12, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Eldeco La Vida Bella?

The unit plan filed with UPRERA lists SHOP, OTHER, 3 BHK, 2 BHK, 4 BHK and 5 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Eldeco La Vida Bella?

The approved unit plan filed with UPRERA runs from 15 to 178 m² of carpet area (about 161 to 1,912 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Eldeco La Vida Bella?

The approved unit plan describes 6 blocks and 380 units of which 368 are homes and 12 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Eldeco La Vida Bella?

About 103 units per acre: 380 planned units across 3.71 acres (14,998 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗