Estate 128 - II

UPRERARegistered

Estate 128 - II is a RERA-registered residential project by Max Estates 128 Private Limited in Sector-128, NOIDA, Gautam Budh Nagar (RERA ID UPRERAPRJ294911). Registered with a completion deadline of 6 Sept 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
6%Q3'25
7%Q4'25
13%Q1'26
16%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ294911
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Oct 2024
Project duration60 months
AddressPlot No. TS-02 at Jaypee Greens Wishtown, Sector-128, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, Sector-128, NOIDA, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressRegistered Office Address  Max House, 1, Dr. Jha Marg, Okhla, South Delhi, Delhi, PIN-110020 Corporate Office Address  L-15, Max Towers, C- 001/A/1, Sector- 16B, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301. Site office Address Plot No. TS-02 at Jaypee Greens Wish Town, Sector 128, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201304
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    2024/09/25/11321

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Dec 2024
Original completion6 Sept 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹10,500
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 1 · 37 (from plan)
ConfigurationUnitsCarpet area
5 BHK—429
4 BHK—220-264
PENTHOUSE—538-634
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower-4 · 5 BHK, 4 BHK, PENTHOUSE37—220-634
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
D. Vishwanathan
License CA/93/15926
RSP Design Consultants (India) Pvt. Ltd., Unit 103, 1st Floor, Bestech Business Tower, Sector 48, Sohna Road, Gurugram, Haryana, PIN-122018
Engineer
Pushpinder Chauhan
Melior Structural Solutions Private Limited, 1st Floor,, Plot D-185, Industrial Area Phase 8 B, Mohali, Punjab, PIN-160071
Contractor
Aar Cee Contracts Private Limited
Krishna APRA Gardens, Plot No.-7, 703, Block A1, Ghaziabad,Uttar Pradesh , PIN-201014
Sr.Development work declared to RERA
1Demarcation of Plots
The Plot No. TS-02, Sector-128 NOIDA has been clearly demarcated on site.
2Boundary Wall
A 1.5 m high Boundary Wall along Main Road and a 2.0 m high boundary wall on the remaining three sides, featuring an Elegant Design integrated with MS railing.
3Road Work
A Peripheral loop road connecting to each tower.
4Footpaths
A Networks of Footpaths connects with various areas of the Landscape, including the Towers and Gardens.
5Water Supply Including Drinking Water Facilities
The NOIDA Authority will supply water to the entire society, which will then be treated and delivered to Customer Premises through piping and pumping /gravity system.
6Sewer System
A Centralized STP will treat the Sewage , with each tower having its own down-comers connected to main sewage line.
7Drain
The Drainage system will consist of a network of Pipe and Catch Basins leading to the nearest Strom Water Drain, which will be connected to Noida Authority s drainage system..
8Parks
A Landscape Area has been provided for parks and other recreational activities.
9Tree Planting
Trees and Plants of various species will be planted in accordance with the landscape design plan.
10Design For Electric Supply Including Street Lighting
A Single feeder will be supplied by the Noida Electricity Board and connected to Central Sub station. The Entire Project will be equipped with street Lighting.
11Community Buildings
A Community Building will be constructed as per approved Building Plan, which will include multi-purpose halls.
12Treatment and Disposal System of Sewage and Sullage water
A Central STP will serve the entire Project and all towers shall be connected to the system.
13Solid Waste Management And Disposal System
The Project includes a waste segregation area and Organic Waste Converter (OWC) for treatment of organic waste.
14Water Conservation System
A Dual flush system will be installed, along with an adequate number of rain water harvesting pits .
15Energy Management System Including Use of Renewable Energy
LED lights and timer control panel will be used to ensure efficient energy management.
16Fire Protection And Fire Safety System
in Compliance to the National Building Code of India, 2016, part IV requirements, the fire protection and safety system includes ; -Underground Fire Tanks with a total capacity of 780m3 (390m3x2) -A 10m3 fire overheads water tank for each towers. - Main electric fire Hydrant and Sprinkler Pumps provided of 2850 LPM each. -Jockey pump for Hydrant and Sprinkler systems, each with a capacity of 180 LPM each. -Diesel Engine Fire Pump with a capacity of 2850 LPM. -Water certain pump with a capacity of 2850 LPM. - Sprinkler system designed in compliance with IS codes and aligned with the projects fire safety requirements aligned to NBC 2016 Part -IV.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social gathering spaces will be provided with in the community building.
18Emergency Evacuation Services
Refuge area will be provided in each tower as per NBC 2016 in addition to the Main and Fire Staircase.
19Other Miscellaneous Work
A comprehensive security system will be implemented , including Security Guard, CCTV Cameras and controlled access.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

22 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 PROP GUIDE LLPUPRERAAGT20190
2AMIT PARMARUPRERAAGT25255
3ASSETS PLUSUPRERAAGT22435
4Black Opal Consultants Limited(formerly known as Black Opal Consultant Private Limited)UPRERAAGT20706
5CAPITALBOON CONSULTINGUPRERAAGT18663
6EVERONN VALUE VENTURESUPRERAAGT13810
7eXp Global India Private LimitedUPRERAAGT19867
8FINDING HOMEUPRERAAGT14297
9Gen X Estate LLPUPRERAAGT14766
10HOMEZ & OWNUPRERAAGT23721
11IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
12Innovation Infra Solutions Private LimitedUPRERAAGT35795
13JENIKA VENTURES Private LimitedUPRERAAGT21501
14KAPUR ESTATESUPRERAAGT11301
15Manish SharmaUPRERAAGT25338
16Opulence Abodez Realty IndiaUPRERAAGT24227
17R N ESTATE AND PROPERTIES PRIVATE LIMITEDUPRERAAGT14396
18Sachan Estate Pvt LtdUPRERAAGT10143
19Sonali MahantUPRERAAGT15610
20star estateUPRERAAGT10202
21Sushil vyasUPRERAAGT13744
22Zeno Ventures Private limited (formerly known as Mantra Tech Ventures Private Limited)UPRERAAGT25399
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 6 Sept 2029.

Sanctioned by Noida Authority · 1,083 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2024/09/25/1132116 Oct 20246 Sept 20296 Sept 20346 Sept 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
TS-02 at Jaypee Greens Wish Town, Sector- 128, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-20130440468.56Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · Name Change Letter to Max Estates 128 Pvt.Ltd. Vide Letter No. 7731/2022
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · YEIDA Approval Letter 7732/ 2022
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · CIC Executed Deed No. 486
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Purchasable Approval Letter from NOIDA Authority Approval Letter 4213
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · No Dues Certificate for Land Payment From YEIDA
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · Lease Deed No. 1656-1657
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Deed of Assignment of Lease No. 3510
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Sub-lease Deed No. 4059
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · Confirmation of Plot TS-02, Sector 128, Noida , Letter No. 4443 NOIDA Authority
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Reply of Objection Letter of Estate 128- II ( Part 1)
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Reply of Objection Letter of Estate 128- II ( Part 2)
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Land Payment Challan for FAR Purchasable to NOIDA
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Reply of Objection Letter dated 06.12.2024 of Estate 128-II
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Reply of Objection Letter 09.12.2024 of Estate 128- II
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Affidavit for Fire and NBC of Estate 128-II Project
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Sept 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New18 Oct 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New18 Oct 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Oct 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New18 Oct 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New18 Oct 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New18 Oct 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New18 Oct 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New12 Nov 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Oct 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 Oct 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New17 Oct 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New16 Dec 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New18 Oct 2024 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q2.

QuarterConstructionCertificates
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q26%CA ↗ · Arch ↗ · Eng ↗
2025-Q37%CA ↗ · Arch ↗ · Eng ↗
2025-Q413%CA ↗ · Arch ↗ · Eng ↗
2026-Q116%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMax Estates 128 Private Limited
RolePromoter · current
RERA IDUPRERAPRM235248
PANAAFCA8223P
CIN / TANDELA18526E
Name of chairmanMr. Rishi Raj
Registered addressRegistered Office Address  Max House, 1, Dr. Jha Marg, Okhla, South Delhi, Delhi, PIN-110020 Corporate Office Address  L-15, Max Towers, C- 001/A/1, Sector- 16B, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301. Site office Address Plot No. TS-02 at Jaypee Greens Wish Town, Sector 128, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201304
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Max Estates 128 Private Limited Collection A/C for Estate 128 - IIBankStandard Chartered BankBranchNOIDABranch addressPlot No. K-3, Brahm Datt Tower, Sector-18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCSCBL0036024Branch emailBhoomika.Chadha@sc.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Max Estates 128 Private Limited Separate Bank A/C for Estate 128 - IIBankStandard Chartered BankBranchNOIDA BranchBranch addressPlot No. K-3 , Brahm Datt Tower, Sector-18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCSCBL0036024
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Max Estates 128 Private Limited RERA Transaction A/C for Estate 128 - IIBankStandard Chartered BankBranchNOIDA BranchBranch addressPlot No. K-3, Brahm Datt Tower, Sector -18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCSCBL0036024
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
15 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Estate 128 - II

Is Estate 128 - II RERA registered?

Yes. Estate 128 - II is registered with UPRERA under registration number UPRERAPRJ294911, registered on 19 Dec 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Estate 128 - II?

The completion date filed with UPRERA is 6 Sept 2029. No completion certificate is on record yet.

Who is the builder of Estate 128 - II?

Max Estates 128 Private Limited is the promoter entity that filed Estate 128 - II with UPRERA (promoter RERA ID UPRERAPRM235248). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Estate 128 - II have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Estate 128 - II located?

Estate 128 - II is registered in Sector-128, NOIDA, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Estate 128 - II?

The unit plan filed with UPRERA lists 5 BHK, 4 BHK and PENTHOUSE. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Estate 128 - II?

The approved unit plan filed with UPRERA runs from 220 to 634 m² of carpet area (about 2,364 to 6,827 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗