SMARTWORLD ES

UPRERARegistered

SMARTWORLD ES is a RERA-registered mixed project by BLITZBAY DEVELOPERS PRIVATE LIMITED in SECTOR-98, NOIDA, Gautam Budh Nagar (RERA ID UPRERAPRJ300532). Registered with a completion deadline of 15 Oct 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
0%Q4'25
0.08%Q1'26
0.21%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ300532
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start19 Oct 2025
Project duration60 months
AddressH-07, SECTOR-98, NOIDA, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address12A FLOOR, TOWER-2, M3M IFC, SECTOR-66, BADSHAHPUR, GURGAON-122101, HARYANA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2025/07/08/12703

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Dec 2025
Original completion15 Oct 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,87,500
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,565 · 5 · 37 (units from plan)
Homes · commercial units1,002 · 563 (shops and offices filed in the same plan)
  • SHOP563 36%
  • OTHER319 20%
  • 1 BHK318 20%
  • 2 BHK168 11%
  • 3 BHK113 7%
  • 4 BHK84 5%
ConfigurationUnitsCarpet area
SHOP5633-212
OTHER3196-15
1 BHK31824-31
2 BHK16863-100
3 BHK113136-144
4 BHK84176
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SMARTWORLD LE COURTYARD · SHOP, OTHER98823-212
SMARTWORLD RESIDENCES BY ELIE SAAB/TOWER-A · OTHER, 3 BHK, 4 BHK, 2 BHK3268100-176
SMARTWORLD RESIDENCES BY ELIE SAAB/TOWER-B · OTHER, 3 BHK, 4 BHK, 2 BHK3267100-176
SMARTWORLD RESIDENCES BY ELIE SAAB/TOWER-C · OTHER, 3 BHK, 4 BHK, 2 BHK3268100-176
SMARTWORLD SUITES BY ELIE SAAB/TOWER-D · OTHER, 1 BHK, 2 BHK3748024-65
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AMIT GUPTA
License CA/2004/33147
D-79, SECTOR-48, NOIDA-U.P.-201306
Engineer
VIVEK KUMAR PANKAJ
A-14, SECTOR-122, NOIDA-U.P.-201306
Contractor
BLITZBAY DEVELOPERS PRIVATE LIMITED
12-A, CABIN, M3M IFC, TOWER-2, SECTOR-66, GURUGRAM, HARYANA-122002
Sr.Development work declared to RERA
1Demarcation of Plots
Number of plots - 1 No, size per plot - 24000 sqm, total area demarcated; method of demarcation, survey accuracy - As per Site plan and Possession Plan.
2Boundary Wall
630 Mtr total Rmy., Height - 1.8 Mtr (for 319 Mtr length) and 0.45 Mtr (for 311 Mtr length - front) RCC and Brick, Appearance - As per Elevation
3Road Work
Total road Length - 668 Rmt., and width - 6 Mtr, number of lanes - 2 ; type of pavment - RCC,/Concrete Pavers/Cobbles as per landscape plan, surface durability - As per Fire Tender Movement.
4Footpaths
Length, width, number of crossings; material used, accessibility, safety design - As Per Site Plan and Landscape.
5Water Supply Including Drinking Water Facilities
Number of water connections, tank capacity, hydrants; source of water, treatment method, compliance with quality standards
6Sewer System
Length of sewer lines, pipe size, manholes; type (gravity/pressure), material used network design. Length of sewer lines - Pipes are running in basement ceiling by gravity, pipe size - 200 mm dia, Manholes type (gravity/pressure) - provision of manholes has not been proposed as the pipe is running in basement at ceiling level by gravity, Network design - Piping network
7Drain
Length, width, number of open/covered drains; type (storm/surface) , material, disposal method. Length - 500 mtrs, Width - 400 mm dia (Dia of Pipe), Numbers of open/covered drains; type(storm/surface) - storm water system is planned using pipe system, Pipe Material - SN4, Disposal method - Using rainwater harvesting and external drain.
8Parks
Area, number of parks, number of trees/plants; landscaping features, types of parks, public amenities - As Per Landscape Plan.
9Tree Planting
Number of trees , types/species, spacing; native/exotic trees, maintenance Plan - 320 Nos. Proposed Native Trees Varieties - 1- Mimusops elengi 2- Erythrina indica 3- Delonix regia 4- Khaya seneghaliensis 5- Lagerstromia speciosa 6- Plumeria alba 7- Nyctanthes arbor-tristis
10Design For Electric Supply Including Street Lighting
Number of poles, lights, transformer units; type of lighting (LED/solar), illumination design Number of External poles/lights - Approx. 30 Nos, Transformer units - 6Nos, Type of lighting (LED/solar) - LED, Illumination design - Yes as per norms
11Community Buildings
As per Floor Plan.
12Treatment and Disposal System of Sewage and Sullage water
STP capacity (KLD), number of treatment units; type of STP, treated water use, regulatory compliance. STP capacity (KLD) - 1050 KLD, number of treatment units; type of STP, treated water use, regulatory compliance.
13Solid Waste Management And Disposal System
Estimated waste (kg/day), number of bins/collection points; segregation, composting/recycling, collection method.
14Water Conservation System
Number and size of harvesting pits, recharge wells; water-efficient fixtures, reuse/recharge strategy, system efficiency. Number and size of harvesting pits - 6 Nos. of 50 m3 capacity each, recharge wells; Yes Provided, Water- efficient fixtures - considered low flow sanitary fixtures, Reuse/recharge strategy - rain water will be used for ground water recharge, system efficiency - As per Norms.
15Energy Management System Including Use of Renewable Energy
(Renewable Energy) Solar capacity (kW), number of panels; type of renewable energy used, grid integration, backup provisions Online Solar power system of capacity 100 KW.
16Fire Protection And Fire Safety System
Number of hydrants, fire exits, sprinklers; system type (manual/automatic) - Automatic, internal, Sprinklers; system, (MCP - manual/automatic) - Automatic, NBC compliance - Yes, fire safety training - will be provided at the time of occupancy.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Number/area of amenities(toilets, health units); type of services offered, inclusiveness, accessibility Provided - As per norms.
18Emergency Evacuation Services
Number of evacuation points, road widths, signage count; route plan, safety measures, public awareness system - As per NBC 2016.
19Other Miscellaneous Work
Work based on the nature of work (e.g., number of CCTV units, benches); beautification efforts, signage, aesthetic and utility elements CCTV proposed as per project requirement.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 16 Oct 2030.

Sanctioned by Noida Authority · 24,000 sqm of land · an approved plan of 5 blocks and 1565 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2025/07/08/1270317 Oct 202516 Oct 203015 Oct 203515 Oct 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
H-07, SECTOR-98, NOIDA24000Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 2629
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · NOIDA/COMMERCIAL/2025/129
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Dec 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Dec 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 Dec 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 Nov 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New30 Oct 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Oct 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Oct 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Oct 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New15 Nov 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New15 Nov 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Nov 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New15 Nov 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New30 Oct 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New17 Dec 2025 ↗

Quarterly progress reports

4 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

4 quarterly progress reports are on file with UPRERA, covering 2025-Q3 to 2026-Q2.

QuarterConstructionCertificates
2025-Q30%CA ↗ · Arch ↗ · Eng ↗
2025-Q40.08%CA ↗ · Arch ↗ · Eng ↗
2026-Q10.21%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameBLITZBAY DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM407936
PANAANCB2655G
CIN / TANRTKB13024E
Name of chairmanCHHATER SINGH
Registered address12A FLOOR, TOWER-2, M3M IFC, SECTOR-66, BADSHAHPUR, GURGAON-122101, HARYANA
RERA contact
Registered since2025
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
BDPL COLLECTION A/C FOR SMARTWORLD ESBankKOTAK MAHINDRA BANKBranchSECTOR-18, NOIDABranch addressPLOT NO.4 & 5, BLOCK-F, SECTOR-18, NOIDA, U.P.-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0000181Branch email10181_noida_referal@kotak.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
BDPL SEPARATE BANK A/C FOR SMARTWORLD ESBankKOTAK MAHINDRA BANKBranchSECTOR-18, NOIDABranch addressPLOT No. 4-5, BLOCK-F, SECTOR-18, NOIDA-U.P.-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0000181
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
BDPL RERA TRANSACTION A/C FOR SMARTWORLD ELIE SAABBankKOTAK MAHINDRA BANKBranchSECTOR-18, NOIDABranch addressPLOT No. 4 -5, BLOCK-F, SECTOR-18NOIDA, U.P.-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0000181
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
Promoter’s complaints tally (all their projects)1 (Under Registration - 1 ) → 2 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SMARTWORLD ES

Is SMARTWORLD ES RERA registered?

Yes. SMARTWORLD ES is registered with UPRERA under registration number UPRERAPRJ300532, registered on 24 Dec 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SMARTWORLD ES?

The completion date filed with UPRERA is 15 Oct 2030. No completion certificate is on record yet.

Who is the builder of SMARTWORLD ES?

BLITZBAY DEVELOPERS PRIVATE LIMITED is the promoter entity that filed SMARTWORLD ES with UPRERA (promoter RERA ID UPRERAPRM407936). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SMARTWORLD ES have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SMARTWORLD ES located?

SMARTWORLD ES is registered in SECTOR-98, NOIDA, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SMARTWORLD ES?

The unit plan filed with UPRERA lists SHOP, OTHER, 1 BHK, 2 BHK, 3 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SMARTWORLD ES?

The approved unit plan filed with UPRERA runs from 3 to 212 m² of carpet area (about 28 to 2,282 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SMARTWORLD ES?

The approved unit plan describes 5 blocks and 1,565 units of which 1,002 are homes and 563 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SMARTWORLD ES?

About 264 units per acre: 1,565 planned units across 5.93 acres (24,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗