Excella Kutumb Phase-II

UPRERARegistered

Excella Kutumb Phase-II is a RERA-registered residential project by EXCELLA INFRAZONE LLP in Lucknow (RERA ID UPRERAPRJ17445). Registered with a completion deadline of 30 Jul 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jan–Mar 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'24
—Q3'24
—Q4'24
—Q1'25
—Q2'25
84.38%Q3'25
87.5%Q4'25
90%Q1'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ17445
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Mar 2019
Project duration89 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant addressB-2/345, Vikas Khand, Gomti Nagar, Lucknow-226010
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    40900

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. valid to

    Permit revalidated

    40900

  6. Building permit sanctioned

    40900

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  9. to

    Extension granted

  10. to

    Extension granted

  11. to

    Extension granted

  12. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  13. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Aug 2018
Original completion31 Dec 2022
Revised completion30 Jul 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹20,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors78 · 1 · 14 (units from plan)
  • 2 BHK52 67%
  • 3 BHK26 33%
ConfigurationUnitsCarpet area
2 BHK5251-53
3 BHK2664
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A-3 · OTHER, 2 BHK, 3 BHK147851-64
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JSR Design Pvt. Ltd.
License CA/99/24429
C-67, Basement, Defence Colony, New Delhi-110024
Engineer
Paresh & Associates Consulting & Project Manager
20, Central Lane, Babar Road, New Delhi
Contractor
Jai Maa Ambey Infra Developers Pvt. Ltd.
A-51, Duggal Colony, Devli Road, Khanpur, New Delhi-110062
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
Available
3Road Work
Available
4Footpaths
Available
5Water Supply Including Drinking Water Facilities
Available
6Sewer System
Available
7Drain
Available
8Parks
Available
9Tree Planting
Available
10Design For Electric Supply Including Street Lighting
Available
11Community Buildings
Available
12Treatment and Disposal System of Sewage and Sullage water
Available
13Solid Waste Management And Disposal System
Available
14Water Conservation System
Available
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
Available
17Social Infrastructure And Other Public Amenities Including Public Health Services
Available
18Emergency Evacuation Services
Available
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

8 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ARADHYA REAL ESTATEUPRERAAGT13179
3Mr. Janardan AgarwalUPRERAAGT10555
4RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
5RISHTA INFRABUILD PVT LTDUPRERAAGT15197
6Shailendra Singh(property address)UPRERAAGT12799
7SMC Real Estate Advisors Private LimitedUPRERAAGT10113
8SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 19 Aug 2024. 2 of them carry a revalidation, the latest valid to 9 Aug 2028.

Sanctioned by Lucknow Development Authority · 3,070 sqm of land · an approved plan of 1 block and 78 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
4090020 Aug 201619 Aug 202119 Aug 202431 Dec 2022—
4090020 Aug 201619 Aug 202119 Aug 202330 Jun 202320 Aug 2016
valid to 19 Feb 2024
4090020 Aug 202119 Aug 20249 Aug 202819 Feb 202420 Aug 2021
valid to 9 Aug 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 5 completion extensions for this project, the latest running to 30 Jul 2026.

#Granted fromExtended uptoNote
131 Dec 202230 Jul 2026Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202330 Jul 2026—
319 Feb 202430 Jul 2026—
430 Dec 202430 Jul 2026—
531 Mar 202630 Jul 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2688/22150Khasra
2692/1920Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 6682
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6683
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New24 Aug 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New24 Aug 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New24 Aug 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New24 Aug 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New24 Aug 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New24 Aug 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New24 Aug 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New28 Feb 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New3 Mar 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New28 Feb 2022 ↗

Quarterly progress reports

24 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

24 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q284.38%CA ↗ · Arch ↗ · Eng ↗
2025-Q387.5%CA ↗ · Arch ↗ · Eng ↗
2025-Q490%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameEXCELLA INFRAZONE LLP
RolePromoter · current
RERA IDUPRERAPRM1109
PANAAFFE1858B
CIN / TANAAD-7572
Name of chairmanRAVI PARAKASH PANDEY,KISHORI LAL GOEL
Registered addressB-2/345, Vikas Khand, Gomti Nagar, Lucknow-226010
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
EXCELLA INFRAZONE LLP-EXCELLA KUTUMB PHASE II-COLLECTION ACCOUNTBankINDUSIND BANKBranchGOMTI NAGAR, LUCKNOWBranch address1/90, GROUND FLOOR, VINAY KHAND, NEAR PATRAKARPURAM CROSSING, GOMTI NAGAR, LUCKNOW-26010Branch districtLucknow, Uttar PradeshA/C no.IFSCINDB0000542
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
EXCELLA INFRAZONE LLP-EXCELLA KUTUMB PHASE II RERA ACCOUNTBankINDUSIND BANKBranchGOMTI NAGAR, LUCKNOWBranch address1/90, GROUND FLOOR, VINAY KHAND, NEAR PATRAKARPURAM CROSSING, GOMTI NAGAR, LUCKNOW-226010Branch districtLucknow, Uttar PradeshA/C no.IFSCINDB0000542
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
EXCELLA INFRAZONE LLPBankINDUSIND BANKBranchGOMTI NAGAR, LUCKNOWBranch address1/90, GROUND FLOOR, VINAY KHAND, NEAR PATRAKARPURAM CROSSING, GOMTI NAGAR, LUCKNOW-226010Branch districtLucknow, Uttar PradeshA/C no.IFSCINDB0000542
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

10 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)6 (Under Registration - 1 ) → 6 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)5 (Under Registration - 0 ) → 6 (Under Registration - 1 )
changed in Estanzo’s record
3 Oct 2026
Revised completion date on file2026-07-31 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 5 — extended upto
2026-07-31 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 4 — extended upto
2026-03-31 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 3 — extended upto
2024-12-30 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 2 — extended upto
2024-02-19 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2023-06-30 → 2026-07-30
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-03-31 → 2026-07-31
changed in Estanzo’s record
5 Sept 2026
Completion extension
no. 5
extension 5 to 2026-07-31
newly filed with RERA
5 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Excella Kutumb Phase-II

Is Excella Kutumb Phase-II RERA registered?

Yes. Excella Kutumb Phase-II is registered with UPRERA under registration number UPRERAPRJ17445, registered on 24 Aug 2018. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Excella Kutumb Phase-II?

The completion date filed with UPRERA is 30 Jul 2026. No completion certificate is on record yet.

Who is the builder of Excella Kutumb Phase-II?

EXCELLA INFRAZONE LLP is the promoter entity that filed Excella Kutumb Phase-II with UPRERA (promoter RERA ID UPRERAPRM1109). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Excella Kutumb Phase-II more time to complete?

UPRERA's record carries 5 completion extensions for Excella Kutumb Phase-II, the latest running to 30 Jul 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Excella Kutumb Phase-II have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Excella Kutumb Phase-II located?

Excella Kutumb Phase-II is registered in Lucknow, as filed with UPRERA.

What configurations are available in Excella Kutumb Phase-II?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Excella Kutumb Phase-II?

The approved unit plan filed with UPRERA runs from 51 to 64 m² of carpet area (about 545 to 689 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Excella Kutumb Phase-II?

The approved unit plan describes 1 block and 78 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Excella Kutumb Phase-II?

About 103 units per acre: 78 planned units across 0.76 acres (3,070 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗