LONDON MART (PHASE-1) is a RERA-registered commercial project by MART PROMOTERS PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ15269). Registered with a completion deadline of 3 Feb 2028.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ15269 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 5 Feb 2018 |
| Project duration | 120 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | PLOT NO C 3, SECTOR- 16B, GNIDA |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
PLG/(BP)4051/COM/885
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 23 Feb 2018 |
| Original completion | 31 Jul 2022 |
| Revised completion | 3 Feb 2028 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,28,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- SHOP489 77%
- STUDIO122 19%
- OTHER28 4%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 28 | 32-331 |
| SHOP | 489 | 6-268 |
| STUDIO | 122 | 16-87 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| LONDON MART · OTHER, SHOP, STUDIO | 20 | 461 | 7-1,689 |
| LONDON MART (LGF) · SHOP | 1 | 76 | 13-50 |
| LONDON MART (UGF) · SHOP | 1 | 102 | 6-268 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarkation was already done before starting the project |
| 2 | Boundary Wall Boundary wall on RCC tie - Beams supported on RCC footings |
| 3 | Road Work Cement Concrete Internal Roads (CC Roads above the two coarse of WBM . |
| 4 | Footpaths Interlocking Pavers on PCC & compacted surface |
| 5 | Water Supply Including Drinking Water Facilities To be provided by Greater Noida Industrial Development Authority & Storage will be done in under ground water tank. |
| 6 | Sewer System Main Sewer line has been designed as per norms and partily laid in basement ceiling and will finally connect to Sewer line / STP |
| 7 | Drain Underground pipe drain with chamber |
| 8 | Parks Landscape and Park has been designed by as per authority guidelines. |
| 9 | Tree Planting Tree Planting has been designed by by as per authority guidelines |
| 10 | Design For Electric Supply Including Street Lighting Design has been done as per UP Electricity Board Guidelines |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage will be treated for recycling (If required) otherwise, it will be connected to the sewer line of authority. |
| 13 | Solid Waste Management And Disposal System Door to door collection & will be disposed up to garbage point of authority. |
| 14 | Water Conservation System Recycling of treated water and rain water system to be provided. |
| 15 | Energy Management System Including Use of Renewable Energy Renewable Energy System Designed as per Authority norms. |
| 16 | Fire Protection And Fire Safety System System will be provided as per the fire department guidelines. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services Provision of Exit Sign & Emergency Lights |
| 19 | Other Miscellaneous Work N/A |
Registered agents
12 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | BHIMSEN & CO. | UPRERAAGT10311 |
| 2 | City Associates C/o Dharmender Chaudhary | UPRERAAGT12292 |
| 3 | EMPOWER REALTECH PRIVATE LIMITED | UPRERAAGT10623 |
| 4 | INDIABULLS INVESTMENT ADVISORS LIMITED | UPRERAAGT10238 |
| 5 | Maztro Consulting LLP | UPRERAAGT12053 |
| 6 | NEOBRIX CONSULTING PVT LTD | UPRERAAGT10059 |
| 7 | PROPERTY PLUS REALTORS | UPRERAAGT12375 |
| 8 | REAL HOMEZ | UPRERAAGT11572 |
| 9 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 10 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 11 | star estate | UPRERAAGT10202 |
| 12 | Trisol RED Infraventures Pvt Ltd | UPRERAAGT11579 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 4 Feb 2023. 1 of them carries a revalidation, valid to 3 Feb 2028.
Sanctioned by Greater Noida Authority · 11,778 sqm of land · an approved plan of 3 blocks and 639 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG/(BP)4051/COM/885 | 5 Feb 2018 | 4 Feb 2023 | 4 Feb 2028 | 31 Jul 2022 | — | |
| PLG/(BP)4051/COM/885 | 5 Feb 2018 | 4 Feb 2023 | 3 Feb 2028 | 29 Oct 2024 | 5 Feb 2018 valid to 3 Feb 2028 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 3 Feb 2028.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Jul 2022 | 30 Jan 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jan 2023 | 29 Oct 2024 | — |
| 3 | 29 Oct 2024 | 3 Feb 2028 | — |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| PLOT NO C-3, SECTOR-16B, GNIDA | GR. NOIDA (WEST), GAUTAM BUDH NAGAR, U.P. | — |
| Plot No C-3, Sector-16B, Greater Noida (West), UP | 11777.22 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 9 Jun 2017.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 16289 | 9 Jun 2017 | self | — |
| Lease deed · 16289 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 23 Feb 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 23 Feb 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 23 Feb 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 23 Feb 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 23 Feb 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 23 Feb 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 23 Feb 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | AS PER PLAN |
| Fire safety (as filed with RERA) | AS PER PLAN |
| Renewable energy | AS PER PLAN |
| Other facilities | AS PER PLAN |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
21 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
21 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 27.61% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 35% | CA ↗ · Arch ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | MART PROMOTERS PVT. LTD. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM36089 |
| PAN | AAKCM8897Q |
| CIN / TAN | U70200DL2017PTC314038 |
| Name of chairman | KARAN MADANI |
| Registered address | PLOT NO C 3, SECTOR- 16B, GNIDA |
| RERA contact | |
| Registered since | 2018 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | MART PROMOTERS PVT. LTD.BankICICI BANKBranchICICI BANK AG 1,Aditya City Center,Vaibhav Khand, Indrapuram, Ghaziabad 201012, Ghaziabad IndrapuramA/C no.IFSCICIC0000718 |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 28 (Under Registration - 2 ) → 28 (Under Registration - 1 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 27 (Under Registration - 1 ) → 28 (Under Registration - 2 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 26 (Under Registration - 1 ) → 27 (Under Registration - 1 ) changed in Estanzo’s record | 23 Sept 2026 |
| Filed document viewprojects · 30 | Other Plan(If Any) newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 29 | Other Plan(If Any) newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 28 | Other Plan(If Any) newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 27 | Other Plan(If Any) newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 26 | Other Plan(If Any) newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 25 | Other Plan(If Any) newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 24 | Affidavit (Form-B) newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 23 | Development Work Plan newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 22 | Electricity Supply Plan newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 21 | Electricity Supply Plan newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 20 | Electricity Supply Plan newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 19 | Water Supply Plan newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 18 | Waste Disposal Plan newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 17 | Commencement Certificate newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 16 | Registry Document In Case of Own Land newly filed with RERA | 1 Sept 2026 |
| Filed document viewprojects · 15 | ENGINEERS CERTIFICATE newly filed with RERA | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 7 Oct 2026 · 4 movements on record |
Common questions about LONDON MART (PHASE-1)
Is LONDON MART (PHASE-1) RERA registered?
Yes. LONDON MART (PHASE-1) is registered with UPRERA under registration number UPRERAPRJ15269, registered on 23 Feb 2018. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for LONDON MART (PHASE-1)?
The completion date filed with UPRERA is 3 Feb 2028. No completion certificate is on record yet.
Who is the builder of LONDON MART (PHASE-1)?
MART PROMOTERS PVT. LTD. is the promoter entity that filed LONDON MART (PHASE-1) with UPRERA (promoter RERA ID UPRERAPRM36089). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted LONDON MART (PHASE-1) more time to complete?
UPRERA's record carries 3 completion extensions for LONDON MART (PHASE-1), the latest running to 3 Feb 2028. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does LONDON MART (PHASE-1) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is LONDON MART (PHASE-1) located?
LONDON MART (PHASE-1) is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in LONDON MART (PHASE-1)?
The unit plan filed with UPRERA lists OTHER, SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in LONDON MART (PHASE-1)?
The approved unit plan filed with UPRERA runs from 6 to 331 m² of carpet area (about 61 to 3,563 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in LONDON MART (PHASE-1)?
The approved unit plan describes 3 blocks and 639 units of which 150 are homes and 489 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is LONDON MART (PHASE-1)?
About 220 units per acre: 639 planned units across 2.91 acres (11,778 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗