MAGNUM OASIS GREEN

UPRERARegistered

MAGNUM OASIS GREEN is a RERA-registered residential project by RMS BUILDERS PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ6761). Registered with a completion deadline of 25 Feb 2022. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6761
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start27 Aug 2015
Original start27 Aug 2015
Project duration78 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressGH-C-5,TRONICA CITY,GHAZIABAD (U.P)
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    09-11/ATP/UPSIDC

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. valid to

    Permit revalidated

    102-104/SDIC/ATP

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion26 Aug 2020
Revised completion25 Feb 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,28,500
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors402 · 3 · 14 (units from plan)
  • 2 BHK224 56%
  • 3 BHK123 31%
  • 4 BHK55 14%
ConfigurationUnitsCarpet area
4 BHK55110
3 BHK12380
2 BHK22447-59
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER-A · 4 BHK, 3 BHK, 2 BHK1413647-110
TOWER-B · 3 BHK, 2 BHK1411247-80
TOWER-C · 4 BHK, 3 BHK, 2 BHK1415447-110
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARWAL ARCHITECTS PVT LTD
A-244,KAUSHAMBI,GHAZIABAD(U.P)
Engineer
ABL STRUCTURAL CONSULTANT PVT LTD
H-2/111,Apra North ex Plaza,Netaji Subhash Palace,Pitam Pura,Delhi-110034
Contractor
MODERN CONSTRUCTION
GF-22 BMM,SECTOR-B-1,TRONICA CITY,LONI,GHAZIABAD(U.P)
Sr.Development work declared to RERA
1Demarcation of Plots
NORTH & WEST FACING ROAD,SOUTH FACING GREEN BELT & ROAD,EAST FACING OTHERS PROPERTY
2Boundary Wall
EAST & NORTH FACING BOUNDARY WALL CONSTRUCTED
3Road Work
YET TO BE STARTED
4Footpaths
YET TO BE STARTED
5Water Supply Including Drinking Water Facilities
YET TO BE STARTED
6Sewer System
YET TO BE STARTED
7Drain
YET TO BE STARTED
8Parks
YET TO BE STARTED
9Tree Planting
YET TO BE STARTED
10Design For Electric Supply Including Street Lighting
YET TO BE STARTED
11Community Buildings
YET TO BE STARTED
12Treatment and Disposal System of Sewage and Sullage water
YET TO BE STARTED
13Solid Waste Management And Disposal System
UNDER PROCESS
14Water Conservation System
PROVIDED
15Energy Management System Including Use of Renewable Energy
YET TO BE STARTED
16Fire Protection And Fire Safety System
YET TO BE STARTED
17Social Infrastructure And Other Public Amenities Including Public Health Services
YET TO BE STARTED
18Emergency Evacuation Services
PROVIDED
19Other Miscellaneous Work
AS PER BUILDING SANCTIONED PLAN PROVISION OF OTHER MISC WORK UNDER PROGRESS
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 6 Feb 2019. It carries a revalidation, valid to 22 May 2021.

Sanctioned by Any Other Competent Authority · 24,662 sqm of land · an approved plan of 3 blocks and 402 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
09-11/ATP/UPSIDC7 Feb 20146 Feb 201922 May 202126 Aug 202023 May 2016
valid to 22 May 2021
as 102-104/SDIC/ATP
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 25 Feb 2022.

#Granted fromExtended uptoNote
126 Aug 202025 Feb 2021Six months extension in view of force majeure caused by covid-19 pandemic
225 Feb 202125 Feb 2022—

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH,SECTOR-C524663Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 1 Nov 2006.

Registry no.DateTypeArea
75011 Nov 2006self—
75011 Nov 2006self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 0000
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · 0000
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Oct 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old12 Oct 2017 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRMS BUILDERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM12672
PANAAJCS7909L
CIN / TANU70101DL2005PTC142813
Name of chairmanPREM KUMAR GOEL
Registered addressGH-C-5,TRONICA CITY,GHAZIABAD (U.P)
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameRMS BUILDERS PRIVATE LIMITED
RoleCo-promoter · current
RERA IDUPRERAPRM19243
PANAAKPG3178P
CIN / TANU70101DL2005PTC142813
Name of chairmanGOPAL GUPTA
Registered address4,EAST PARK ROAD,KAROL BAGH,NEW DELHI-110005
RERA contact
Registered since2017

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
RMS BUILDERS PVT LTD"MAGNUM OASIS GREEN"BankHDFC BANK LTDBranchD-BLOCK ,JANAK PURI,NEW DEHI-58A/C no.IFSCHDFC0001375
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)18 (Under Registration - 1 ) → 18 (Under Registration - 0 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 16 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about MAGNUM OASIS GREEN

Is MAGNUM OASIS GREEN RERA registered?

Yes. MAGNUM OASIS GREEN is registered with UPRERA under registration number UPRERAPRJ6761, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for MAGNUM OASIS GREEN?

The completion date filed with UPRERA is 25 Feb 2022. No completion certificate is on record yet.

Who is the builder of MAGNUM OASIS GREEN?

RMS BUILDERS PRIVATE LIMITED is the promoter entity that filed MAGNUM OASIS GREEN with UPRERA (promoter RERA ID UPRERAPRM12672). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does MAGNUM OASIS GREEN show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted MAGNUM OASIS GREEN more time to complete?

UPRERA's record carries 2 completion extensions for MAGNUM OASIS GREEN, the latest running to 25 Feb 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does MAGNUM OASIS GREEN have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MAGNUM OASIS GREEN located?

MAGNUM OASIS GREEN is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in MAGNUM OASIS GREEN?

The unit plan filed with UPRERA lists 4 BHK, 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MAGNUM OASIS GREEN?

The approved unit plan filed with UPRERA runs from 47 to 110 m² of carpet area (about 501 to 1,187 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MAGNUM OASIS GREEN?

The approved unit plan describes 3 blocks and 402 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MAGNUM OASIS GREEN?

About 66 units per acre: 402 planned units across 6.09 acres (24,662 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗